Lumped parameter modelling of the litho cell
Litho cells are the most expensive equipment in a wafer fab. To support decision-making on this equipment, accurate simulation models for throughput and cycle time are helpful. The simulation models that are typically developed incorporate various shop floor details. To properly model these details,...
Saved in:
Published in: | Production planning & control 2011-01, Vol.22 (1), p.41-49 |
---|---|
Main Authors: | , , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Litho cells are the most expensive equipment in a wafer fab. To support decision-making on this equipment, accurate simulation models for throughput and cycle time are helpful. The simulation models that are typically developed incorporate various shop floor details. To properly model these details, they should be quantified, which is difficult and time-consuming. In this article, a lumped parameter model is proposed for the litho cell. The model consists of two parts: a detailed representation of the processing inside the track and scanner, and an aggregate representation of the factory floor feeding the loadport. The track-scanner is modelled as a tandem flow line with blocking. The shop floor is represented by a delay distribution that incorporates all contributions outside the machine. Simulation results show that the suggested method provides a simple, yet accurate approximation of the litho cell. |
---|---|
ISSN: | 0953-7287 1366-5871 |
DOI: | 10.1080/09537287.2010.490016 |