Loading…

Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods

► Selection type of TBM depends on the various parameters that some of these parameters are in conflicting with each other. ► TBM selection process is sophisticated and complex. ► AHP and TOPSIS methods are appropriate tools for selection under the complicated circumstances. ► Fuzzy approach is usef...

Full description

Saved in:
Bibliographic Details
Published in:Tunnelling and underground space technology 2012-07, Vol.30, p.194-204
Main Authors: Yazdani-Chamzini, Abdolreza, Yakhchali, Siamak Haji
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c363t-e3ced503877ec150ecdca956ad10b0b4a445b5073e99b623396a0fe429f3afad3
cites cdi_FETCH-LOGICAL-c363t-e3ced503877ec150ecdca956ad10b0b4a445b5073e99b623396a0fe429f3afad3
container_end_page 204
container_issue
container_start_page 194
container_title Tunnelling and underground space technology
container_volume 30
creator Yazdani-Chamzini, Abdolreza
Yakhchali, Siamak Haji
description ► Selection type of TBM depends on the various parameters that some of these parameters are in conflicting with each other. ► TBM selection process is sophisticated and complex. ► AHP and TOPSIS methods are appropriate tools for selection under the complicated circumstances. ► Fuzzy approach is useful to handle the inherent uncertainty in decision making. ► Combining fuzzy AHP and fuzzy TOPSIS approaches is a new tool for making a decision under vague environmental. The problem of Tunnel Boring Machine (TBM) selection has a significant impact on the speed and cost of excavating sector; so that it is a strategic issue. On the other hand, selecting the optimum TBM among a pool of alternatives is a multicriteria decision making (MCDM) problem. In this paper, an evaluation model based on the fuzzy analytic hierarchy process (AHP) and another fuzzy MCDM technique, namely fuzzy technique for order performance by similarity to ideal solution (TOPSIS) is developed to help the tunneling designers in the process of the TBM selection under fuzzy environment where the vagueness and uncertainty are taken into account with linguistic variables parameterized by triangular fuzzy numbers. The fuzzy AHP is applied to form the structure of the TBM selection problem and to determine weights of the evaluation criteria, and fuzzy TOPSIS method is utilized to acquire final ranking. A real world case study is illustrated in order to demonstrate the potential of the proposed model for the TBM selection issue. It demonstrates the effectiveness and capability of the proposed model.
doi_str_mv 10.1016/j.tust.2012.02.021
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1038264449</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S088677981200065X</els_id><sourcerecordid>1038264449</sourcerecordid><originalsourceid>FETCH-LOGICAL-c363t-e3ced503877ec150ecdca956ad10b0b4a445b5073e99b623396a0fe429f3afad3</originalsourceid><addsrcrecordid>eNp9kMtKAzEUhoMoWKsv4Go2Ql3MmNtcAm5s8QYtbiouQ5o5Y1PnUpOM0D69GVpcCgfOIt_5w_8hdE1wQjDJ7jaJ751PKCY0wcOQEzQiRV7EnGX8FI1wUWRxnoviHF04t8EYp5SKEfpY9m0LdTTtrGk_o4XSa9NCNFlOF7eRgxq0N10b9W54rfr9fhc1fe2NtsaDNSoqQRs3II36GpgG_Lor3SU6q1Tt4Oq4x-j96XE5e4nnb8-vs4d5rFnGfAxMQ5liVuQ5aJJi0KVWIs1USfAKr7jiPF2lOGcgxCqjjIlM4Qo4FRVTlSrZGE0OuVvbfffgvGyM01DXqoWud5KEbJpxzkVA6QHVtnPOQiW31jTK7gIkB4tyIweLcrAo8TAkHN0c85XTqq6sakPfv0uaiqCy4IG7P3AQyv4YsNJpA21oZ2xwKMvO_PfNLyrQiUc</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1038264449</pqid></control><display><type>article</type><title>Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods</title><source>ScienceDirect Freedom Collection</source><creator>Yazdani-Chamzini, Abdolreza ; Yakhchali, Siamak Haji</creator><creatorcontrib>Yazdani-Chamzini, Abdolreza ; Yakhchali, Siamak Haji</creatorcontrib><description>► Selection type of TBM depends on the various parameters that some of these parameters are in conflicting with each other. ► TBM selection process is sophisticated and complex. ► AHP and TOPSIS methods are appropriate tools for selection under the complicated circumstances. ► Fuzzy approach is useful to handle the inherent uncertainty in decision making. ► Combining fuzzy AHP and fuzzy TOPSIS approaches is a new tool for making a decision under vague environmental. The problem of Tunnel Boring Machine (TBM) selection has a significant impact on the speed and cost of excavating sector; so that it is a strategic issue. On the other hand, selecting the optimum TBM among a pool of alternatives is a multicriteria decision making (MCDM) problem. In this paper, an evaluation model based on the fuzzy analytic hierarchy process (AHP) and another fuzzy MCDM technique, namely fuzzy technique for order performance by similarity to ideal solution (TOPSIS) is developed to help the tunneling designers in the process of the TBM selection under fuzzy environment where the vagueness and uncertainty are taken into account with linguistic variables parameterized by triangular fuzzy numbers. The fuzzy AHP is applied to form the structure of the TBM selection problem and to determine weights of the evaluation criteria, and fuzzy TOPSIS method is utilized to acquire final ranking. A real world case study is illustrated in order to demonstrate the potential of the proposed model for the TBM selection issue. It demonstrates the effectiveness and capability of the proposed model.</description><identifier>ISSN: 0886-7798</identifier><identifier>EISSN: 1878-4364</identifier><identifier>DOI: 10.1016/j.tust.2012.02.021</identifier><identifier>CODEN: TUSTEQ</identifier><language>eng</language><publisher>Kidlington: Elsevier Ltd</publisher><subject>Applied sciences ; Boring machines ; Buildings. Public works ; Computation methods. Tables. Charts ; Decision making ; Exact sciences and technology ; Fuzzy ; Fuzzy AHP ; Fuzzy logic ; Fuzzy set theory ; Fuzzy systems ; Fuzzy TOPSIS ; Mathematical models ; MCDM ; Structural analysis. Stresses ; Tunnel Boring Machine (TBM) ; Tunnels (transportation) ; Tunnels, galleries</subject><ispartof>Tunnelling and underground space technology, 2012-07, Vol.30, p.194-204</ispartof><rights>2012 Elsevier Ltd</rights><rights>2014 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c363t-e3ced503877ec150ecdca956ad10b0b4a445b5073e99b623396a0fe429f3afad3</citedby><cites>FETCH-LOGICAL-c363t-e3ced503877ec150ecdca956ad10b0b4a445b5073e99b623396a0fe429f3afad3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&amp;idt=25900084$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Yazdani-Chamzini, Abdolreza</creatorcontrib><creatorcontrib>Yakhchali, Siamak Haji</creatorcontrib><title>Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods</title><title>Tunnelling and underground space technology</title><description>► Selection type of TBM depends on the various parameters that some of these parameters are in conflicting with each other. ► TBM selection process is sophisticated and complex. ► AHP and TOPSIS methods are appropriate tools for selection under the complicated circumstances. ► Fuzzy approach is useful to handle the inherent uncertainty in decision making. ► Combining fuzzy AHP and fuzzy TOPSIS approaches is a new tool for making a decision under vague environmental. The problem of Tunnel Boring Machine (TBM) selection has a significant impact on the speed and cost of excavating sector; so that it is a strategic issue. On the other hand, selecting the optimum TBM among a pool of alternatives is a multicriteria decision making (MCDM) problem. In this paper, an evaluation model based on the fuzzy analytic hierarchy process (AHP) and another fuzzy MCDM technique, namely fuzzy technique for order performance by similarity to ideal solution (TOPSIS) is developed to help the tunneling designers in the process of the TBM selection under fuzzy environment where the vagueness and uncertainty are taken into account with linguistic variables parameterized by triangular fuzzy numbers. The fuzzy AHP is applied to form the structure of the TBM selection problem and to determine weights of the evaluation criteria, and fuzzy TOPSIS method is utilized to acquire final ranking. A real world case study is illustrated in order to demonstrate the potential of the proposed model for the TBM selection issue. It demonstrates the effectiveness and capability of the proposed model.</description><subject>Applied sciences</subject><subject>Boring machines</subject><subject>Buildings. Public works</subject><subject>Computation methods. Tables. Charts</subject><subject>Decision making</subject><subject>Exact sciences and technology</subject><subject>Fuzzy</subject><subject>Fuzzy AHP</subject><subject>Fuzzy logic</subject><subject>Fuzzy set theory</subject><subject>Fuzzy systems</subject><subject>Fuzzy TOPSIS</subject><subject>Mathematical models</subject><subject>MCDM</subject><subject>Structural analysis. Stresses</subject><subject>Tunnel Boring Machine (TBM)</subject><subject>Tunnels (transportation)</subject><subject>Tunnels, galleries</subject><issn>0886-7798</issn><issn>1878-4364</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2012</creationdate><recordtype>article</recordtype><recordid>eNp9kMtKAzEUhoMoWKsv4Go2Ql3MmNtcAm5s8QYtbiouQ5o5Y1PnUpOM0D69GVpcCgfOIt_5w_8hdE1wQjDJ7jaJ751PKCY0wcOQEzQiRV7EnGX8FI1wUWRxnoviHF04t8EYp5SKEfpY9m0LdTTtrGk_o4XSa9NCNFlOF7eRgxq0N10b9W54rfr9fhc1fe2NtsaDNSoqQRs3II36GpgG_Lor3SU6q1Tt4Oq4x-j96XE5e4nnb8-vs4d5rFnGfAxMQ5liVuQ5aJJi0KVWIs1USfAKr7jiPF2lOGcgxCqjjIlM4Qo4FRVTlSrZGE0OuVvbfffgvGyM01DXqoWud5KEbJpxzkVA6QHVtnPOQiW31jTK7gIkB4tyIweLcrAo8TAkHN0c85XTqq6sakPfv0uaiqCy4IG7P3AQyv4YsNJpA21oZ2xwKMvO_PfNLyrQiUc</recordid><startdate>20120701</startdate><enddate>20120701</enddate><creator>Yazdani-Chamzini, Abdolreza</creator><creator>Yakhchali, Siamak Haji</creator><general>Elsevier Ltd</general><general>Elsevier</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20120701</creationdate><title>Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods</title><author>Yazdani-Chamzini, Abdolreza ; Yakhchali, Siamak Haji</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c363t-e3ced503877ec150ecdca956ad10b0b4a445b5073e99b623396a0fe429f3afad3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2012</creationdate><topic>Applied sciences</topic><topic>Boring machines</topic><topic>Buildings. Public works</topic><topic>Computation methods. Tables. Charts</topic><topic>Decision making</topic><topic>Exact sciences and technology</topic><topic>Fuzzy</topic><topic>Fuzzy AHP</topic><topic>Fuzzy logic</topic><topic>Fuzzy set theory</topic><topic>Fuzzy systems</topic><topic>Fuzzy TOPSIS</topic><topic>Mathematical models</topic><topic>MCDM</topic><topic>Structural analysis. Stresses</topic><topic>Tunnel Boring Machine (TBM)</topic><topic>Tunnels (transportation)</topic><topic>Tunnels, galleries</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Yazdani-Chamzini, Abdolreza</creatorcontrib><creatorcontrib>Yakhchali, Siamak Haji</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Tunnelling and underground space technology</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Yazdani-Chamzini, Abdolreza</au><au>Yakhchali, Siamak Haji</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods</atitle><jtitle>Tunnelling and underground space technology</jtitle><date>2012-07-01</date><risdate>2012</risdate><volume>30</volume><spage>194</spage><epage>204</epage><pages>194-204</pages><issn>0886-7798</issn><eissn>1878-4364</eissn><coden>TUSTEQ</coden><abstract>► Selection type of TBM depends on the various parameters that some of these parameters are in conflicting with each other. ► TBM selection process is sophisticated and complex. ► AHP and TOPSIS methods are appropriate tools for selection under the complicated circumstances. ► Fuzzy approach is useful to handle the inherent uncertainty in decision making. ► Combining fuzzy AHP and fuzzy TOPSIS approaches is a new tool for making a decision under vague environmental. The problem of Tunnel Boring Machine (TBM) selection has a significant impact on the speed and cost of excavating sector; so that it is a strategic issue. On the other hand, selecting the optimum TBM among a pool of alternatives is a multicriteria decision making (MCDM) problem. In this paper, an evaluation model based on the fuzzy analytic hierarchy process (AHP) and another fuzzy MCDM technique, namely fuzzy technique for order performance by similarity to ideal solution (TOPSIS) is developed to help the tunneling designers in the process of the TBM selection under fuzzy environment where the vagueness and uncertainty are taken into account with linguistic variables parameterized by triangular fuzzy numbers. The fuzzy AHP is applied to form the structure of the TBM selection problem and to determine weights of the evaluation criteria, and fuzzy TOPSIS method is utilized to acquire final ranking. A real world case study is illustrated in order to demonstrate the potential of the proposed model for the TBM selection issue. It demonstrates the effectiveness and capability of the proposed model.</abstract><cop>Kidlington</cop><pub>Elsevier Ltd</pub><doi>10.1016/j.tust.2012.02.021</doi><tpages>11</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0886-7798
ispartof Tunnelling and underground space technology, 2012-07, Vol.30, p.194-204
issn 0886-7798
1878-4364
language eng
recordid cdi_proquest_miscellaneous_1038264449
source ScienceDirect Freedom Collection
subjects Applied sciences
Boring machines
Buildings. Public works
Computation methods. Tables. Charts
Decision making
Exact sciences and technology
Fuzzy
Fuzzy AHP
Fuzzy logic
Fuzzy set theory
Fuzzy systems
Fuzzy TOPSIS
Mathematical models
MCDM
Structural analysis. Stresses
Tunnel Boring Machine (TBM)
Tunnels (transportation)
Tunnels, galleries
title Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T03%3A20%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Tunnel%20Boring%20Machine%20(TBM)%20selection%20using%20fuzzy%20multicriteria%20decision%20making%20methods&rft.jtitle=Tunnelling%20and%20underground%20space%20technology&rft.au=Yazdani-Chamzini,%20Abdolreza&rft.date=2012-07-01&rft.volume=30&rft.spage=194&rft.epage=204&rft.pages=194-204&rft.issn=0886-7798&rft.eissn=1878-4364&rft.coden=TUSTEQ&rft_id=info:doi/10.1016/j.tust.2012.02.021&rft_dat=%3Cproquest_cross%3E1038264449%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c363t-e3ced503877ec150ecdca956ad10b0b4a445b5073e99b623396a0fe429f3afad3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=1038264449&rft_id=info:pmid/&rfr_iscdi=true