Loading…
Approach for Cost Determination of Electro-Mechanical Equipment in Ror Shp Projects
Electricity is one of the most widely used forms of energy. Being a renewable source of energy small hydropower is considered as an environment-friendly and cheap source of electricity. The installation cost of the small hydropower project depends mainly on two parts-civil works and electromechanica...
Saved in:
Published in: | Smart grid and renewable energy 2011-05, Vol.2 (2), p.63-67 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Electricity is one of the most widely used forms of energy. Being a renewable source of energy small hydropower is considered as an environment-friendly and cheap source of electricity. The installation cost of the small hydropower project depends mainly on two parts-civil works and electromechanical equipment. One of the most important element on the recovery of a small hydro-power plant is the electromechanical equipment (turbine-alternator). The present paper intends to develop a correlation to determine the cost based on the cost influencing parameters as power and head using three different methods, namely; sigma plot method, linest method and logest method. An attempt has also been made to identify the best correlation among the three models closer to the actual cost of electro-mechanical equipment as collected from recently developed projects. |
---|---|
ISSN: | 2151-481X 2151-4844 |
DOI: | 10.4236/sgre.2011.22008 |