Loading…
Long Memory Regressors and Predictive Testing: A Two-stage Rebalancing Approach
Predictability tests with long memory regressors may entail both size distortion and incompatibility between the orders of integration of the dependent and independent variables. Addressing both problems simultaneously, this paper proposes a two-step procedure that rebalances the predictive regressi...
Saved in:
Published in: | Econometric reviews 2013-01, Vol.32 (3), p.318-360 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Predictability tests with long memory regressors may entail both size distortion and incompatibility between the orders of integration of the dependent and independent variables. Addressing both problems simultaneously, this paper proposes a two-step procedure that rebalances the predictive regression by fractionally differencing the predictor based on a first-stage estimation of the memory parameter. Extensive simulations indicate that our procedure has good size, is robust to estimation error in the first stage, and can yield improved power over cases in which an integer order is assumed for the regressor. We also extend our approach beyond the standard predictive regression context to cases in which the dependent variable is also fractionally integrated, but not cointegrated with the regressor. We use our procedure to provide a valid test of forward rate unbiasedness that allows for a long memory forward premium. |
---|---|
ISSN: | 0747-4938 1532-4168 |
DOI: | 10.1080/07474938.2012.690663 |