Loading…
A Rescheduling Method for Operation Time Delay Disturbance in Steelmaking and Continuous Casting Production Process
In the steelmaking and continuous casting (SMCC) production process, operation time delay may lead to casting break or processing conflict so that the initial scheduling plan becomes unrealizable. Existing research methods are difficult to guarantee the accuracy of the model and successful applicati...
Saved in:
Published in: | Journal of iron and steel research, international international, 2012-12, Vol.19 (12), p.33-41 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In the steelmaking and continuous casting (SMCC) production process, operation time delay may lead to casting break or processing conflict so that the initial scheduling plan becomes unrealizable. Existing research methods are difficult to guarantee the accuracy of the model and successful application to actual applications. The rescheduling problem in response to operation time delay is firstly analyzed. This is then followed by the establishment of a novel multi-objective nonlinear programming model (MONPM). In specifications, a three-stage rescheduling method is proposed including the batches splitting (BS), forward scheduling method (FSM) and backward scheduling method (BSM). As a result, the real-time application shows that the proposed rescheduling method efficiently ensures the continuous casting and dramatically shortens the redundant waiting time for molten steel in very short rescheduling time. |
---|---|
ISSN: | 1006-706X 2210-3988 |
DOI: | 10.1016/S1006-706X(13)60029-1 |