ELCOGAS 14 MWth pre-combustion carbon dioxide capture pilot. Technical & economical achievements
This paper introduces the experiences from the planning, installation and operation of a pilot-scale CO2 capture and H2 production plant. This Project is the main activity of ELCOGAS (owner of the Puertollano IGCC Power Plant) in relation to carbon capture topic.
Saved in:
Published in: | Fuel (Guildford) 2014, Vol.116, p.804-811 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This paper introduces the experiences from the planning, installation and operation of a pilot-scale CO2 capture and H2 production plant. This Project is the main activity of ELCOGAS (owner of the Puertollano IGCC Power Plant) in relation to carbon capture topic. |
---|---|
ISSN: | 0016-2361 1873-7153 |
DOI: | 10.1016/j.fuel.2013.07.027 |