Loading…
AISC 358: PREQUALIFIED MOMENT CONNECTIONS
FOLLOWING THE M6.7 Northridge Earthquake 20 years ago, an engineer performing a post-earthquake inspection of the Santa Clarita City Hall was struck in the head by a structural bolt as he removed a ceiling tile to observe the framing.
Saved in:
Published in: | Modern steel construction 2014-03, Vol.54 (3), p.70-72 |
---|---|
Main Author: | |
Format: | Magazinearticle |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | FOLLOWING THE M6.7 Northridge Earthquake 20 years ago, an engineer performing a post-earthquake inspection of the Santa Clarita City Hall was struck in the head by a structural bolt as he removed a ceiling tile to observe the framing. |
---|---|
ISSN: | 0026-8445 1945-0737 |