Loading…

Recent improvements and present status of the Munich accelerator facility

The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON...

Full description

Saved in:
Bibliographic Details
Published in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 1996-11, Vol.382 (1), p.78-81
Main Authors: Münzer, H, Rohrer, L, Carli, W, Hartung, P, Schnitter, H, Trinks, U
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON and most subsystems of the tandem are now under computer control.
ISSN:0168-9002
1872-9576
DOI:10.1016/S0168-9002(96)00388-9