Loading…
TBM Program implementation in ITER
Tritium breeding blanket testing is an important element in the ITER mission. Up to six different concepts for tritium breeding blanket systems, referred to as Test Blanket Systems (TBS), will be tested in three equatorial ports of ITER. Successful TBS experiments in ITER represent an essential step...
Saved in:
Published in: | Fusion engineering and design 2010-12, Vol.85 (10), p.2005-2011 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c378t-dd29b5b9b37b4e01f4ec30eaed18de7b76ec46e0157707dfe71f6183fa87f4e73 |
---|---|
cites | cdi_FETCH-LOGICAL-c378t-dd29b5b9b37b4e01f4ec30eaed18de7b76ec46e0157707dfe71f6183fa87f4e73 |
container_end_page | 2011 |
container_issue | 10 |
container_start_page | 2005 |
container_title | Fusion engineering and design |
container_volume | 85 |
creator | Chuyanov, V.A. Campbell, D.J. Giancarli, L.M. |
description | Tritium breeding blanket testing is an important element in the ITER mission. Up to six different concepts for tritium breeding blanket systems, referred to as Test Blanket Systems (TBS), will be tested in three equatorial ports of ITER. Successful TBS experiments in ITER represent an essential step on the path to DEMO for all the ITER Members’ fusion development plans.
The ITER Members are in charge of the design, manufacturing and delivery of the TBSs to the ITER site. The IO has responsibility for preparing the necessary interfaces required for the installation of the TBSs. Moreover, the TBM Program has to be fully integrated in the ITER Research Plan and its testing objectives have to be synchronized with the planned ITER operations.
The paper addresses the major implementation steps of the TBM Program in ITER, including the organizational aspects, its integration into the ITER Research Plan and the Operational Plan, the licensing procedure and also gives a short overview of the TBS/ITER interfaces issues. |
doi_str_mv | 10.1016/j.fusengdes.2010.07.005 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1671245304</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0920379610003182</els_id><sourcerecordid>1671245304</sourcerecordid><originalsourceid>FETCH-LOGICAL-c378t-dd29b5b9b37b4e01f4ec30eaed18de7b76ec46e0157707dfe71f6183fa87f4e73</originalsourceid><addsrcrecordid>eNqFkN1Kw0AQhRdRsFafwSAI3qTOZpNMcllL1UJFkXq9bDazZUt-6m4q-PZuaemtMDAw8505zGHslsOEA88fNxOz89Sta_KTBMIUcAKQnbERL1DEyMv8nI2gTCAWWOaX7Mr7DQDHUCN2t3p6iz5cv3aqjWy7bailblCD7bvIdtFiNf-8ZhdGNZ5ujn3Mvp7nq9lrvHx_Wcymy1gLLIa4rpOyyqqyElilBNykpAWQopoXNWGFOek0D4sMEbA2hNzkvBBGFRhYFGP2cLi7df33jvwgW-s1NY3qqN95yXPkSZoJSAOKB1S73ntHRm6dbZX7lRzkPhW5kadU5D4VCShDKkF5fzRRXqvGONVp60_yRKBIk4IHbnrgKHz8Y8lJry11mmrrSA-y7u2_Xn_qC3sK</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1671245304</pqid></control><display><type>article</type><title>TBM Program implementation in ITER</title><source>ScienceDirect Freedom Collection</source><creator>Chuyanov, V.A. ; Campbell, D.J. ; Giancarli, L.M.</creator><creatorcontrib>Chuyanov, V.A. ; Campbell, D.J. ; Giancarli, L.M.</creatorcontrib><description>Tritium breeding blanket testing is an important element in the ITER mission. Up to six different concepts for tritium breeding blanket systems, referred to as Test Blanket Systems (TBS), will be tested in three equatorial ports of ITER. Successful TBS experiments in ITER represent an essential step on the path to DEMO for all the ITER Members’ fusion development plans.
The ITER Members are in charge of the design, manufacturing and delivery of the TBSs to the ITER site. The IO has responsibility for preparing the necessary interfaces required for the installation of the TBSs. Moreover, the TBM Program has to be fully integrated in the ITER Research Plan and its testing objectives have to be synchronized with the planned ITER operations.
The paper addresses the major implementation steps of the TBM Program in ITER, including the organizational aspects, its integration into the ITER Research Plan and the Operational Plan, the licensing procedure and also gives a short overview of the TBS/ITER interfaces issues.</description><identifier>ISSN: 0920-3796</identifier><identifier>EISSN: 1873-7196</identifier><identifier>DOI: 10.1016/j.fusengdes.2010.07.005</identifier><identifier>CODEN: FEDEEE</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Applied sciences ; Blanketing ; Breeding blankets ; Charge ; Controled nuclear fusion plants ; Design engineering ; Energy ; Energy. Thermal use of fuels ; Exact sciences and technology ; Installations for energy generation and conversion: thermal and electrical energy ; IRP ; Licensing ; Missions ; Organizational aspects ; Ports ; TBM ; Tritium ; Tritium production</subject><ispartof>Fusion engineering and design, 2010-12, Vol.85 (10), p.2005-2011</ispartof><rights>2010 V.A. Chuyanov</rights><rights>2015 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c378t-dd29b5b9b37b4e01f4ec30eaed18de7b76ec46e0157707dfe71f6183fa87f4e73</citedby><cites>FETCH-LOGICAL-c378t-dd29b5b9b37b4e01f4ec30eaed18de7b76ec46e0157707dfe71f6183fa87f4e73</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>309,310,314,780,784,789,790,23930,23931,25140,27924,27925</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=23734281$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Chuyanov, V.A.</creatorcontrib><creatorcontrib>Campbell, D.J.</creatorcontrib><creatorcontrib>Giancarli, L.M.</creatorcontrib><title>TBM Program implementation in ITER</title><title>Fusion engineering and design</title><description>Tritium breeding blanket testing is an important element in the ITER mission. Up to six different concepts for tritium breeding blanket systems, referred to as Test Blanket Systems (TBS), will be tested in three equatorial ports of ITER. Successful TBS experiments in ITER represent an essential step on the path to DEMO for all the ITER Members’ fusion development plans.
The ITER Members are in charge of the design, manufacturing and delivery of the TBSs to the ITER site. The IO has responsibility for preparing the necessary interfaces required for the installation of the TBSs. Moreover, the TBM Program has to be fully integrated in the ITER Research Plan and its testing objectives have to be synchronized with the planned ITER operations.
The paper addresses the major implementation steps of the TBM Program in ITER, including the organizational aspects, its integration into the ITER Research Plan and the Operational Plan, the licensing procedure and also gives a short overview of the TBS/ITER interfaces issues.</description><subject>Applied sciences</subject><subject>Blanketing</subject><subject>Breeding blankets</subject><subject>Charge</subject><subject>Controled nuclear fusion plants</subject><subject>Design engineering</subject><subject>Energy</subject><subject>Energy. Thermal use of fuels</subject><subject>Exact sciences and technology</subject><subject>Installations for energy generation and conversion: thermal and electrical energy</subject><subject>IRP</subject><subject>Licensing</subject><subject>Missions</subject><subject>Organizational aspects</subject><subject>Ports</subject><subject>TBM</subject><subject>Tritium</subject><subject>Tritium production</subject><issn>0920-3796</issn><issn>1873-7196</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2010</creationdate><recordtype>article</recordtype><recordid>eNqFkN1Kw0AQhRdRsFafwSAI3qTOZpNMcllL1UJFkXq9bDazZUt-6m4q-PZuaemtMDAw8505zGHslsOEA88fNxOz89Sta_KTBMIUcAKQnbERL1DEyMv8nI2gTCAWWOaX7Mr7DQDHUCN2t3p6iz5cv3aqjWy7bailblCD7bvIdtFiNf-8ZhdGNZ5ujn3Mvp7nq9lrvHx_Wcymy1gLLIa4rpOyyqqyElilBNykpAWQopoXNWGFOek0D4sMEbA2hNzkvBBGFRhYFGP2cLi7df33jvwgW-s1NY3qqN95yXPkSZoJSAOKB1S73ntHRm6dbZX7lRzkPhW5kadU5D4VCShDKkF5fzRRXqvGONVp60_yRKBIk4IHbnrgKHz8Y8lJry11mmrrSA-y7u2_Xn_qC3sK</recordid><startdate>20101201</startdate><enddate>20101201</enddate><creator>Chuyanov, V.A.</creator><creator>Campbell, D.J.</creator><creator>Giancarli, L.M.</creator><general>Elsevier B.V</general><general>Elsevier</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7TB</scope><scope>7U5</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope><scope>L7M</scope></search><sort><creationdate>20101201</creationdate><title>TBM Program implementation in ITER</title><author>Chuyanov, V.A. ; Campbell, D.J. ; Giancarli, L.M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c378t-dd29b5b9b37b4e01f4ec30eaed18de7b76ec46e0157707dfe71f6183fa87f4e73</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2010</creationdate><topic>Applied sciences</topic><topic>Blanketing</topic><topic>Breeding blankets</topic><topic>Charge</topic><topic>Controled nuclear fusion plants</topic><topic>Design engineering</topic><topic>Energy</topic><topic>Energy. Thermal use of fuels</topic><topic>Exact sciences and technology</topic><topic>Installations for energy generation and conversion: thermal and electrical energy</topic><topic>IRP</topic><topic>Licensing</topic><topic>Missions</topic><topic>Organizational aspects</topic><topic>Ports</topic><topic>TBM</topic><topic>Tritium</topic><topic>Tritium production</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Chuyanov, V.A.</creatorcontrib><creatorcontrib>Campbell, D.J.</creatorcontrib><creatorcontrib>Giancarli, L.M.</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Electronics & Communications Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Solid State and Superconductivity Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>Fusion engineering and design</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Chuyanov, V.A.</au><au>Campbell, D.J.</au><au>Giancarli, L.M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>TBM Program implementation in ITER</atitle><jtitle>Fusion engineering and design</jtitle><date>2010-12-01</date><risdate>2010</risdate><volume>85</volume><issue>10</issue><spage>2005</spage><epage>2011</epage><pages>2005-2011</pages><issn>0920-3796</issn><eissn>1873-7196</eissn><coden>FEDEEE</coden><abstract>Tritium breeding blanket testing is an important element in the ITER mission. Up to six different concepts for tritium breeding blanket systems, referred to as Test Blanket Systems (TBS), will be tested in three equatorial ports of ITER. Successful TBS experiments in ITER represent an essential step on the path to DEMO for all the ITER Members’ fusion development plans.
The ITER Members are in charge of the design, manufacturing and delivery of the TBSs to the ITER site. The IO has responsibility for preparing the necessary interfaces required for the installation of the TBSs. Moreover, the TBM Program has to be fully integrated in the ITER Research Plan and its testing objectives have to be synchronized with the planned ITER operations.
The paper addresses the major implementation steps of the TBM Program in ITER, including the organizational aspects, its integration into the ITER Research Plan and the Operational Plan, the licensing procedure and also gives a short overview of the TBS/ITER interfaces issues.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/j.fusengdes.2010.07.005</doi><tpages>7</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0920-3796 |
ispartof | Fusion engineering and design, 2010-12, Vol.85 (10), p.2005-2011 |
issn | 0920-3796 1873-7196 |
language | eng |
recordid | cdi_proquest_miscellaneous_1671245304 |
source | ScienceDirect Freedom Collection |
subjects | Applied sciences Blanketing Breeding blankets Charge Controled nuclear fusion plants Design engineering Energy Energy. Thermal use of fuels Exact sciences and technology Installations for energy generation and conversion: thermal and electrical energy IRP Licensing Missions Organizational aspects Ports TBM Tritium Tritium production |
title | TBM Program implementation in ITER |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T02%3A58%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=TBM%20Program%20implementation%20in%20ITER&rft.jtitle=Fusion%20engineering%20and%20design&rft.au=Chuyanov,%20V.A.&rft.date=2010-12-01&rft.volume=85&rft.issue=10&rft.spage=2005&rft.epage=2011&rft.pages=2005-2011&rft.issn=0920-3796&rft.eissn=1873-7196&rft.coden=FEDEEE&rft_id=info:doi/10.1016/j.fusengdes.2010.07.005&rft_dat=%3Cproquest_cross%3E1671245304%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c378t-dd29b5b9b37b4e01f4ec30eaed18de7b76ec46e0157707dfe71f6183fa87f4e73%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=1671245304&rft_id=info:pmid/&rfr_iscdi=true |