Loading…

Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules

In this manuscript, we present a formulation for the MMSP-W ( Mixed model sequencing problem with workload minimisation) for production lines with serial workstations. We demonstrate the validity of the basic models in the presence of a control system on the production line that allows the stopping...

Full description

Saved in:
Bibliographic Details
Published in:European journal of operational research 2011-05, Vol.210 (3), p.495-513
Main Authors: Bautista, Joaquín, Cano, Alberto
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In this manuscript, we present a formulation for the MMSP-W ( Mixed model sequencing problem with workload minimisation) for production lines with serial workstations. We demonstrate the validity of the basic models in the presence of a control system on the production line that allows the stopping of operations with no restrictions. We propose an extension of the basic models that allows conditioned interruption of operations to facilitate line management. We then propose a procedure to solve the proposed problem through BDP ( Bounded Dynamic Programming), and demonstrate its validity through a computational experiment with reference instances and a case study linked to the Nissan powertrain plant in Barcelona.
ISSN:0377-2217
1872-6860
DOI:10.1016/j.ejor.2010.10.022