Loading…

Upgrading GTE-160 Gas Turbines at Moscow CPPs

The characteristics of PGU-450T combined-cycle units after reasonable upgrade of gas turbines to increase their capacity by 26 and 32.5 MW in winter and summer, respectively, are calculated. The upgrade will pay back in 3.5 – 6 years. The upgrade after two inspections of the hot gas path is the most...

Full description

Saved in:
Bibliographic Details
Published in:Power technology and engineering 2015-05, Vol.49 (1), p.46-49
Main Authors: Olkhovsky, G. G., Trushechkin, V. P., Makarov, O. N., Osyka, A. S., Markina, V. N., Gladkikh, I. I.
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The characteristics of PGU-450T combined-cycle units after reasonable upgrade of gas turbines to increase their capacity by 26 and 32.5 MW in winter and summer, respectively, are calculated. The upgrade will pay back in 3.5 – 6 years. The upgrade after two inspections of the hot gas path is the most profitable over the life of the gas turbine.
ISSN:1570-145X
1570-1468
DOI:10.1007/s10749-015-0571-9