Loading…

Two-Stage Mathematical Programming Approach for Steelmaking Process Scheduling Under Variable Electricity Price

The steelmaking process scheduling problem by considering variable electricity price (SMSPVEP) was in- vestigated. A decomposition approach was proposed for the SMSPVEP. At the first stage, mathematical program-ming was utilized to minimize the maximum completion time for each cast without consideri...

Full description

Saved in:
Bibliographic Details
Published in:Journal of iron and steel research, international international, 2013-07, Vol.20 (7), p.1-8
Main Authors: Tan, Yuan-yuan, Huang, Ying-lei, Liu, Shi-xin
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The steelmaking process scheduling problem by considering variable electricity price (SMSPVEP) was in- vestigated. A decomposition approach was proposed for the SMSPVEP. At the first stage, mathematical program-ming was utilized to minimize the maximum completion time for each cast without considering variable electricity price. At the second stage, based on obtained relative schedules of all casts, a mathematical model was formulated with an objective of minimizing the energy cost for all casts scheduling problem. The two-stage models were tested on randomly generated instances based on the practical process in a Chinese steelmaking plant. Computational results demonstrate the effectiveness of the proposed approach.
ISSN:1006-706X
2210-3988
DOI:10.1016/S1006-706X(13)60118-1