Analysis of the construction process of cable-stayed bridges built on temporary supports

► Construction process of cable-stayed bridges built on temporary supports is modeled. ► The Backward Algorithm is proposed for a backward modeling. ► This algorithm can be efficiently used to initial design of the tensioning strategy. ► The results of this algorithm can be reproduced by most of the...

Full description

Saved in:
Bibliographic Details
Published in:Engineering structures 2012-07, Vol.40, p.95-106
Main Authors: Lozano-Galant, J.A., Payá-Zaforteza, I., Xu, D., Turmo, J.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:► Construction process of cable-stayed bridges built on temporary supports is modeled. ► The Backward Algorithm is proposed for a backward modeling. ► This algorithm can be efficiently used to initial design of the tensioning strategy. ► The results of this algorithm can be reproduced by most of the structural software. ► A simplified cable-stayed bridge analyzed by the Backward Algorithm is presented. The temporary supports erection method is a fast and economical way of building cable-stayed bridges. In this method the bridge deck is first erected on a set of temporary and permanent supports and then, the stays are successively placed and tensioned according to a predefined tensioning sequence. A proper definition and analysis of this sequence is very complex as the structure is highly statically indeterminate, exhibits a non linear behavior and has a changing static scheme. Despite its importance, no specific research referring to the modeling of the temporary support erection method has been found as most of the modeling procedures are proposed for the alternative erection technique, the cantilever erection method. The modeling carried out by most of these methods is based on the opposite construction sequence followed on site, this is to say, the structure is disassembled from the desired final stage (Objective Completion Stage, OCS). A procedure, the Backward Algorithm (BA), is formally presented in this paper for calculation of the erection of cable-stayed bridges built on temporary supports. Because of its simplicity the BA can be reproduced by any structural code that enables the modeling of the prestresses of the stays by means of imposed strains or imposed temperature increments. Another advantage is that no separate models are needed to calculate the evolution of stresses in the strands when the strand by strand tensioning technique is used. Furthermore, the stay elongations when prestressed can be easily obtained when the stays are prestressed in a single operation or strand by strand. This information is important to control the correct and safe prestressing of the stay on site. In addition, it also help the designer to control if the anchor wedge bites the strand in the same position several times during the prestressing process.
ISSN:0141-0296
1873-7323
DOI:10.1016/j.engstruct.2012.02.005