Loading…
A multiple RSU scheduling for V2I-based data services
In this paper, we propose a new RSU Scheduling to provide V2I-based data services via multiple RUS. In the proposed scheme, RSUs are connected through a wired backbone. The proposed scheme transfers safety and non-safety data by employing a collaborative strategy of multiple RSUs as well as reducing...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference Proceeding |
Language: | English |
Subjects: | |
Online Access: | Request full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | In this paper, we propose a new RSU Scheduling to provide V2I-based data services via multiple RUS. In the proposed scheme, RSUs are connected through a wired backbone. The proposed scheme transfers safety and non-safety data by employing a collaborative strategy of multiple RSUs as well as reducing the deadline failure rate and mean response time. It is shown through performance evaluation that the proposed scheme outperforms the existing scheme in various environments. |
---|---|
ISSN: | 2375-9356 |
DOI: | 10.1109/BIGCOMP.2016.7425816 |