Loading…

A multiple RSU scheduling for V2I-based data services

In this paper, we propose a new RSU Scheduling to provide V2I-based data services via multiple RUS. In the proposed scheme, RSUs are connected through a wired backbone. The proposed scheme transfers safety and non-safety data by employing a collaborative strategy of multiple RSUs as well as reducing...

Full description

Saved in:
Bibliographic Details
Main Authors: Bok, Kyoungsoo, Hong, Seungwan, Lim, Jongtae, Yoo, Jaesoo
Format: Conference Proceeding
Language:English
Subjects:
Online Access:Request full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In this paper, we propose a new RSU Scheduling to provide V2I-based data services via multiple RUS. In the proposed scheme, RSUs are connected through a wired backbone. The proposed scheme transfers safety and non-safety data by employing a collaborative strategy of multiple RSUs as well as reducing the deadline failure rate and mean response time. It is shown through performance evaluation that the proposed scheme outperforms the existing scheme in various environments.
ISSN:2375-9356
DOI:10.1109/BIGCOMP.2016.7425816