Loading…
Process and measuring equipment transport in uncased boreholes
Results of design and analysis of system to transport equipment in uncased boreholes drilled from underground excavations are reported. A thruster is a pneumatic percussion device. The optimal parameters of the transport system operation in various conditions are determined. Using mathematical descr...
Saved in:
Published in: | Journal of mining science 2015-09, Vol.51 (5), p.1056-1061 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c394t-9b299cf85ad87cdf764cc437fa8d1da9d2c27a0b18ec9ee3929ab5fe528de0573 |
---|---|
cites | cdi_FETCH-LOGICAL-c394t-9b299cf85ad87cdf764cc437fa8d1da9d2c27a0b18ec9ee3929ab5fe528de0573 |
container_end_page | 1061 |
container_issue | 5 |
container_start_page | 1056 |
container_title | Journal of mining science |
container_volume | 51 |
creator | Timonin, V. V. Kondratenko, A. S. |
description | Results of design and analysis of system to transport equipment in uncased boreholes drilled from underground excavations are reported. A thruster is a pneumatic percussion device. The optimal parameters of the transport system operation in various conditions are determined. Using mathematical description of movement of thruster in well, the authors derive relations for the thruster velocity as a function of various initial data. |
doi_str_mv | 10.1134/S1062739115040284 |
format | article |
fullrecord | <record><control><sourceid>gale_proqu</sourceid><recordid>TN_cdi_proquest_miscellaneous_1855376032</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><galeid>A500608684</galeid><sourcerecordid>A500608684</sourcerecordid><originalsourceid>FETCH-LOGICAL-c394t-9b299cf85ad87cdf764cc437fa8d1da9d2c27a0b18ec9ee3929ab5fe528de0573</originalsourceid><addsrcrecordid>eNp9kUtLxDAQgIsouK7-AG896qGaRx_JRVgWHwsLio9zyCbTtdIm3UwL-u_NUi8iyBwyZL5vYGaS5JySK0p5fv1CSckqLiktSE6YyA-SGS0qnomKl4cxj-VsXz9OThA_CCFSlHKW3DwFbwAx1c6mHWgcQ-O2KezGpu_ADekQtMPehyFtXDo6oxFsuvEB3n0LeJoc1bpFOPt558nb3e3r8iFbP96vlot1ZrjMh0xumJSmFoW2ojK2rsrcmJxXtRaWWi0tM6zSZEMFGAnAJZN6U9RQMGGBxDHmycXUtw9-NwIOqmvQQNtqB35ERUVR8KoknEX0akK3ugXVuNrHEUwMC11jvIO6if-LgpCSiFLkUbj8JURmgM9hq0dEtXp5_s3SiTXBIwaoVR-aTocvRYnaH0L9OUR02ORgv98tBPXhx-Diuv6RvgF-u4mn</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1855376032</pqid></control><display><type>article</type><title>Process and measuring equipment transport in uncased boreholes</title><source>Springer Link</source><creator>Timonin, V. V. ; Kondratenko, A. S.</creator><creatorcontrib>Timonin, V. V. ; Kondratenko, A. S.</creatorcontrib><description>Results of design and analysis of system to transport equipment in uncased boreholes drilled from underground excavations are reported. A thruster is a pneumatic percussion device. The optimal parameters of the transport system operation in various conditions are determined. Using mathematical description of movement of thruster in well, the authors derive relations for the thruster velocity as a function of various initial data.</description><identifier>ISSN: 1062-7391</identifier><identifier>EISSN: 1573-8736</identifier><identifier>DOI: 10.1134/S1062739115040284</identifier><language>eng</language><publisher>Moscow: Pleiades Publishing</publisher><subject>Analysis ; Boreholes ; Coal industry ; Design engineering ; Drilling ; Earth and Environmental Science ; Earth Sciences ; Functions (mathematics) ; Geophysics/Geodesy ; Geotechnical Engineering & Applied Earth Sciences ; Mathematical analysis ; Methane ; Mineral Resources ; New Methods and Instruments in Mining ; Optimization ; Percussion ; Petroleum mining ; Thrusters ; Transport</subject><ispartof>Journal of mining science, 2015-09, Vol.51 (5), p.1056-1061</ispartof><rights>Pleiades Publishing, Ltd. 2016</rights><rights>COPYRIGHT 2015 Springer</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c394t-9b299cf85ad87cdf764cc437fa8d1da9d2c27a0b18ec9ee3929ab5fe528de0573</citedby><cites>FETCH-LOGICAL-c394t-9b299cf85ad87cdf764cc437fa8d1da9d2c27a0b18ec9ee3929ab5fe528de0573</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Timonin, V. V.</creatorcontrib><creatorcontrib>Kondratenko, A. S.</creatorcontrib><title>Process and measuring equipment transport in uncased boreholes</title><title>Journal of mining science</title><addtitle>J Min Sci</addtitle><description>Results of design and analysis of system to transport equipment in uncased boreholes drilled from underground excavations are reported. A thruster is a pneumatic percussion device. The optimal parameters of the transport system operation in various conditions are determined. Using mathematical description of movement of thruster in well, the authors derive relations for the thruster velocity as a function of various initial data.</description><subject>Analysis</subject><subject>Boreholes</subject><subject>Coal industry</subject><subject>Design engineering</subject><subject>Drilling</subject><subject>Earth and Environmental Science</subject><subject>Earth Sciences</subject><subject>Functions (mathematics)</subject><subject>Geophysics/Geodesy</subject><subject>Geotechnical Engineering & Applied Earth Sciences</subject><subject>Mathematical analysis</subject><subject>Methane</subject><subject>Mineral Resources</subject><subject>New Methods and Instruments in Mining</subject><subject>Optimization</subject><subject>Percussion</subject><subject>Petroleum mining</subject><subject>Thrusters</subject><subject>Transport</subject><issn>1062-7391</issn><issn>1573-8736</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNp9kUtLxDAQgIsouK7-AG896qGaRx_JRVgWHwsLio9zyCbTtdIm3UwL-u_NUi8iyBwyZL5vYGaS5JySK0p5fv1CSckqLiktSE6YyA-SGS0qnomKl4cxj-VsXz9OThA_CCFSlHKW3DwFbwAx1c6mHWgcQ-O2KezGpu_ADekQtMPehyFtXDo6oxFsuvEB3n0LeJoc1bpFOPt558nb3e3r8iFbP96vlot1ZrjMh0xumJSmFoW2ojK2rsrcmJxXtRaWWi0tM6zSZEMFGAnAJZN6U9RQMGGBxDHmycXUtw9-NwIOqmvQQNtqB35ERUVR8KoknEX0akK3ugXVuNrHEUwMC11jvIO6if-LgpCSiFLkUbj8JURmgM9hq0dEtXp5_s3SiTXBIwaoVR-aTocvRYnaH0L9OUR02ORgv98tBPXhx-Diuv6RvgF-u4mn</recordid><startdate>20150901</startdate><enddate>20150901</enddate><creator>Timonin, V. V.</creator><creator>Kondratenko, A. S.</creator><general>Pleiades Publishing</general><general>Springer</general><scope>AAYXX</scope><scope>CITATION</scope><scope>ISR</scope><scope>8BQ</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope></search><sort><creationdate>20150901</creationdate><title>Process and measuring equipment transport in uncased boreholes</title><author>Timonin, V. V. ; Kondratenko, A. S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c394t-9b299cf85ad87cdf764cc437fa8d1da9d2c27a0b18ec9ee3929ab5fe528de0573</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Analysis</topic><topic>Boreholes</topic><topic>Coal industry</topic><topic>Design engineering</topic><topic>Drilling</topic><topic>Earth and Environmental Science</topic><topic>Earth Sciences</topic><topic>Functions (mathematics)</topic><topic>Geophysics/Geodesy</topic><topic>Geotechnical Engineering & Applied Earth Sciences</topic><topic>Mathematical analysis</topic><topic>Methane</topic><topic>Mineral Resources</topic><topic>New Methods and Instruments in Mining</topic><topic>Optimization</topic><topic>Percussion</topic><topic>Petroleum mining</topic><topic>Thrusters</topic><topic>Transport</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Timonin, V. V.</creatorcontrib><creatorcontrib>Kondratenko, A. S.</creatorcontrib><collection>CrossRef</collection><collection>Gale In Context: Science</collection><collection>METADEX</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of mining science</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Timonin, V. V.</au><au>Kondratenko, A. S.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Process and measuring equipment transport in uncased boreholes</atitle><jtitle>Journal of mining science</jtitle><stitle>J Min Sci</stitle><date>2015-09-01</date><risdate>2015</risdate><volume>51</volume><issue>5</issue><spage>1056</spage><epage>1061</epage><pages>1056-1061</pages><issn>1062-7391</issn><eissn>1573-8736</eissn><abstract>Results of design and analysis of system to transport equipment in uncased boreholes drilled from underground excavations are reported. A thruster is a pneumatic percussion device. The optimal parameters of the transport system operation in various conditions are determined. Using mathematical description of movement of thruster in well, the authors derive relations for the thruster velocity as a function of various initial data.</abstract><cop>Moscow</cop><pub>Pleiades Publishing</pub><doi>10.1134/S1062739115040284</doi><tpages>6</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1062-7391 |
ispartof | Journal of mining science, 2015-09, Vol.51 (5), p.1056-1061 |
issn | 1062-7391 1573-8736 |
language | eng |
recordid | cdi_proquest_miscellaneous_1855376032 |
source | Springer Link |
subjects | Analysis Boreholes Coal industry Design engineering Drilling Earth and Environmental Science Earth Sciences Functions (mathematics) Geophysics/Geodesy Geotechnical Engineering & Applied Earth Sciences Mathematical analysis Methane Mineral Resources New Methods and Instruments in Mining Optimization Percussion Petroleum mining Thrusters Transport |
title | Process and measuring equipment transport in uncased boreholes |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T23%3A01%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-gale_proqu&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Process%20and%20measuring%20equipment%20transport%20in%20uncased%20boreholes&rft.jtitle=Journal%20of%20mining%20science&rft.au=Timonin,%20V.%20V.&rft.date=2015-09-01&rft.volume=51&rft.issue=5&rft.spage=1056&rft.epage=1061&rft.pages=1056-1061&rft.issn=1062-7391&rft.eissn=1573-8736&rft_id=info:doi/10.1134/S1062739115040284&rft_dat=%3Cgale_proqu%3EA500608684%3C/gale_proqu%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c394t-9b299cf85ad87cdf764cc437fa8d1da9d2c27a0b18ec9ee3929ab5fe528de0573%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=1855376032&rft_id=info:pmid/&rft_galeid=A500608684&rfr_iscdi=true |