Loading…
A Model for Sorting Activities to Be Outsourced in Civil Construction Based on ROR-UTADIS
The subcontractor’s selection problem is currently treated as a supply chain problem with a prequalification procedure to balance the main objectives of the client: cost, quality, and time. Unfortunately, most of the selection processes are analysed under the same methodology without considering tha...
Saved in:
Published in: | Mathematical problems in engineering 2016-01, Vol.2016 (2016), p.1-15 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The subcontractor’s selection problem is currently treated as a supply chain problem with a prequalification procedure to balance the main objectives of the client: cost, quality, and time. Unfortunately, most of the selection processes are analysed under the same methodology without considering that variations in project, type of activity, and other attributes should affect the chosen method. To provide a novel form of treating subcontractor’s selection, we proposed an additive sorting method to categorize activities to be outsourced in civil construction based on ROR-UTADIS method, which is a modification of the UTADIS method that includes new forms of supplying preference information. It was applied in the construction of a brewery in Brazil. It was perceived that the method is applicable and intuitive for decision makers, even though there are quite a few points to be taken, analysed to avoid misclassification. |
---|---|
ISSN: | 1024-123X 1563-5147 |
DOI: | 10.1155/2016/9236414 |