Loading…

Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey

AbstractConstruction delays are common in construction industry and create major concerns for project performance. Construction delays are caused by many factors. The aim of this paper is to identify delay factors on construction projects and analyze these factors with the relative importance index...

Full description

Saved in:
Bibliographic Details
Published in:Journal of management in engineering 2013-04, Vol.29 (2), p.133-139
Main Authors: Gündüz, Murat, Nielsen, Yasemin, Özdemir, Mustafa
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:AbstractConstruction delays are common in construction industry and create major concerns for project performance. Construction delays are caused by many factors. The aim of this paper is to identify delay factors on construction projects and analyze these factors with the relative importance index method. For this purpose, 83 different delay factors were identified, categorized into nine major groups, and visualized by the Ishikawa (fishbone) diagram through detailed literature review and interviews with experts from the construction industry. The relative importances of these delay factors were quantified by the relative importance index method. The ranking of the factors and groups were demonstrated according to their importance level on delay. According to the case study results, the factors and groups contributing the most to delays (those needing attention) were discussed, and some recommendations were made to minimize and control delays in construction projects.
ISSN:0742-597X
1943-5479
DOI:10.1061/(ASCE)ME.1943-5479.0000129