Loading…
Parambikulam-Aliyar Project Operations Optimization with Reliability Constraints
AbstractIn this paper, a recently developed stochastic programming technique that includes reliability constraints is used to solve the operations optimization problem of the Parambikulam-Aliyar project (PAP), a multireservoir system in India. The use of reliability constraints as chance constraints...
Saved in:
Published in: | Journal of water resources planning and management 2013-07, Vol.139 (4), p.364-375 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | AbstractIn this paper, a recently developed stochastic programming technique that includes reliability constraints is used to solve the operations optimization problem of the Parambikulam-Aliyar project (PAP), a multireservoir system in India. The use of reliability constraints as chance constraints in reservoir operations optimization have been around for some time, but is still a challenging problem because either the results are not good or they cannot be applied in problems with more than one or two reservoirs when such techniques depend on discretization. The new implementation of chance constraints based on a previous model extended to multireservoir systems provides better results than so far known. This work is easy to apply because it requires only a standard nonlinear programming solver. |
---|---|
ISSN: | 0733-9496 1943-5452 |
DOI: | 10.1061/(ASCE)WR.1943-5452.0000261 |