Loading…

Defining the copper binding aptamotif and aptamer integrated recovery platform (AIRP)

The potential copper binding sites in aptamers have been predicted on the basis of secondary structures and the binding affinity of aptamers with copper. Out of the 4 aptamers (Cu-A1 to Cu-A4) selected by SELEX and examined in the present study, the Cu-A2 aptamer shows the highest binding affinity t...

Full description

Saved in:
Bibliographic Details
Published in:Nanoscale 2017, Vol.9 (8), p.2883-2894
Main Authors: Sekhon, Simranjeet Singh, Lee, Sang-Hee, Lee, Kyeong-Ah, Min, Jiho, Lee, Byung-Tae, Kim, Kyoung-Woong, Ahn, Ji-Young, Kim, Yang-Hoon
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The potential copper binding sites in aptamers have been predicted on the basis of secondary structures and the binding affinity of aptamers with copper. Out of the 4 aptamers (Cu-A1 to Cu-A4) selected by SELEX and examined in the present study, the Cu-A2 aptamer shows the highest binding affinity to copper with the lowest K value of 1.83 Ă— 10 M. In order to confirm the binding of copper to the proposed region, the binding affinity was experimentally validated using mutation and deletion analysis. We have confirmed that the high G-C pairing patterns and short stem-interval distance play important roles in copper binding. Aptamer specificity was also verified against diverse heavy metals. We also demonstrate an Aptamer Integrated Recovery Platform (AIRP) to recover copper from acidic mine drainage. AIRP can be easily regenerated at least 20 times without significant deterioration of the retrieval performance. To the best of our knowledge, AIRP is the first demonstration of copper specific recovery using aptamers. This can be scaled up and would have diverse applications in metal contaminated water treatment, recovery and as a potential biosensor for environmental analysis, monitoring, and risk assessment.
ISSN:2040-3364
2040-3372
DOI:10.1039/c6nr09408b