Loading…

Versatile transceiver production and quality assurance

The Versatile Link project has developed a radiation-hard optical link for LHC phase 1 detector upgrades. The project has reached its final stage and we have launched in 2016 the production of the Versatile Transceivers and Versatile Twin Transmitters. This paper provides an update of the production...

Full description

Saved in:
Bibliographic Details
Published in:Journal of instrumentation 2017-01, Vol.12 (1), p.C01097-C01097
Main Authors: Olantera, L., Detraz, S., Sigaud, C., Soos, C., Troska, J., Vasey, F., Zeiler, M.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The Versatile Link project has developed a radiation-hard optical link for LHC phase 1 detector upgrades. The project has reached its final stage and we have launched in 2016 the production of the Versatile Transceivers and Versatile Twin Transmitters. This paper provides an update of the production status and a detailed description and results of the quality assurance programme, which includes qualification and acceptance testing at CERN and production testing at the manufacturers' premises.
ISSN:1748-0221
1748-0221
DOI:10.1088/1748-0221/12/01/C01097