Loading…

Real-Time Extraction of the Madden–Julian Oscillation Using Empirical Mode Decomposition and Statistical Forecasting with a VARMA Model

A simple guide to the new technique of empirical mode decomposition (EMD) in a meteorological–climate forecasting context is presented. A single application of EMD to a time series essentially acts as a local high-pass filter. Hence, successive applications can be used to produce a bandpass filter t...

Full description

Saved in:
Bibliographic Details
Published in:Journal of climate 2008-10, Vol.21 (20), p.5318-5335
Main Authors: Love, Barnaby S., Matthews, Adrian J., Janacek, Gareth J.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:A simple guide to the new technique of empirical mode decomposition (EMD) in a meteorological–climate forecasting context is presented. A single application of EMD to a time series essentially acts as a local high-pass filter. Hence, successive applications can be used to produce a bandpass filter that is highly efficient at extracting a broadband signal such as the Madden–Julian oscillation (MJO). The basic EMD method is adapted to minimize end effects, such that it is suitable for use in real time. The EMD process is then used to efficiently extract the MJO signal from gridded time series of outgoing longwave radiation (OLR) data. A range of statistical models from the general class of vector autoregressive moving average (VARMA) models was then tested for their suitability in forecasting the MJO signal, as isolated by the EMD. A VARMA (5, 1) model was selected and its parameters determined by a maximum likelihood method using 17 yr of OLR data from 1980 to 1996. Forecasts were then made on the remaining independent data from 1998 to 2004. These were made in real time, as only data up to the date the forecast was made were used. The median skill of forecasts was accurate (defined as an anomaly correlation above 0.6) at lead times up to 25 days.
ISSN:0894-8755
1520-0442
DOI:10.1175/2008JCLI1977.1