Loading…
Waste generation from the production of ready-mixed concrete
•National scale inventory of amount of waste produced in ready mix concrete plants.•Influence of concrete characteristics on the volume of residue adhered to the drum.•Mapping of the main factors affecting the concrete returned to the plant.•Real-scale parameterization of the waste generation in ind...
Saved in:
Published in: | Waste management (Elmsford) 2019-07, Vol.94, p.146-152 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c401t-647a8ceee7fc6a2faabf003ff903d8a07721a1cf79f3ab01f0a9f5be8a5c83b63 |
---|---|
cites | cdi_FETCH-LOGICAL-c401t-647a8ceee7fc6a2faabf003ff903d8a07721a1cf79f3ab01f0a9f5be8a5c83b63 |
container_end_page | 152 |
container_issue | |
container_start_page | 146 |
container_title | Waste management (Elmsford) |
container_volume | 94 |
creator | Vieira, Luiz de Brito Prado de Figueiredo, Antonio Domingues Moriggi, Tacius John, Vanderley M. |
description | •National scale inventory of amount of waste produced in ready mix concrete plants.•Influence of concrete characteristics on the volume of residue adhered to the drum.•Mapping of the main factors affecting the concrete returned to the plant.•Real-scale parameterization of the waste generation in industrial production.
In Brazil, ready-mixed concrete (RMC) suppliers are adopting management strategies to reduce waste generation. This is because of the increasing scarcity of adequate places for the deposition of waste, which raises the associated costs. Therefore, it is necessary to know the actual volume production of residues in order to optimize the implementation of the recycling. The waste produced in RMC plants are mainly in the form of leftover concrete and adhered to the internal part of the drum of the mixer truck.
The present study analyzed the data and produced an inventory of the amount of waste generated by of one of the largest Brazilian concrete companies. In parallel, an experimental study was performed in the real conditions of an RMC plant in order to measure the influence of concrete characteristics on the volume of concrete adhered to the drum.
The results showed that about 3% of all the produced volume returns to the plant, comprising approximately 1.6% adhered concrete and 1.4% leftover concrete. The study proved that the volume of concrete adhered concrete depends on the cement consumption and the slump. The volume of concrete loaded and the region where the RMC plant is located do not influence those results. The inventory showed that the main cause of concrete leftovers is associated to over order and corresponds to 58% of this volume. |
doi_str_mv | 10.1016/j.wasman.2019.05.043 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_2253841415</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0956053X19303514</els_id><sourcerecordid>2253841415</sourcerecordid><originalsourceid>FETCH-LOGICAL-c401t-647a8ceee7fc6a2faabf003ff903d8a07721a1cf79f3ab01f0a9f5be8a5c83b63</originalsourceid><addsrcrecordid>eNp9kE1LxDAQhoMo7rr6D0R69NI6aZp-gAiy-AWCF0VvYZpONMu2XZNW3X9v164ePQ0MzzsfD2PHHCIOPD1bRJ_oa2yiGHgRgYwgETtsyvOsCONEprtsCoVMQ5DiZcIOvF8A8CTnsM8mgsdZIQqYsvNn9B0Fr9SQw862TWBcWwfdGwUr11a9_um1JnCE1Tqs7RdVgW4b7aijQ7ZncOnpaFtn7On66nF-G94_3NzNL-9DnQDvwjTJMNdElBmdYmwQSwMgjClAVDlClsUcuTZZYQSWwA1gYWRJOUqdizIVM3Y6zh1Oeu_Jd6q2XtNyiQ21vVdxLEWe8ITLAU1GVLvWe0dGrZyt0a0VB7XxphZq9KY23hRINXgbYifbDX1ZU_UX-hU1ABcjQMOfH5ac8tpSo6myjnSnqtb-v-Eb9D-Beg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2253841415</pqid></control><display><type>article</type><title>Waste generation from the production of ready-mixed concrete</title><source>ScienceDirect Freedom Collection 2022-2024</source><creator>Vieira, Luiz de Brito Prado ; de Figueiredo, Antonio Domingues ; Moriggi, Tacius ; John, Vanderley M.</creator><creatorcontrib>Vieira, Luiz de Brito Prado ; de Figueiredo, Antonio Domingues ; Moriggi, Tacius ; John, Vanderley M.</creatorcontrib><description>•National scale inventory of amount of waste produced in ready mix concrete plants.•Influence of concrete characteristics on the volume of residue adhered to the drum.•Mapping of the main factors affecting the concrete returned to the plant.•Real-scale parameterization of the waste generation in industrial production.
In Brazil, ready-mixed concrete (RMC) suppliers are adopting management strategies to reduce waste generation. This is because of the increasing scarcity of adequate places for the deposition of waste, which raises the associated costs. Therefore, it is necessary to know the actual volume production of residues in order to optimize the implementation of the recycling. The waste produced in RMC plants are mainly in the form of leftover concrete and adhered to the internal part of the drum of the mixer truck.
The present study analyzed the data and produced an inventory of the amount of waste generated by of one of the largest Brazilian concrete companies. In parallel, an experimental study was performed in the real conditions of an RMC plant in order to measure the influence of concrete characteristics on the volume of concrete adhered to the drum.
The results showed that about 3% of all the produced volume returns to the plant, comprising approximately 1.6% adhered concrete and 1.4% leftover concrete. The study proved that the volume of concrete adhered concrete depends on the cement consumption and the slump. The volume of concrete loaded and the region where the RMC plant is located do not influence those results. The inventory showed that the main cause of concrete leftovers is associated to over order and corresponds to 58% of this volume.</description><identifier>ISSN: 0956-053X</identifier><identifier>EISSN: 1879-2456</identifier><identifier>DOI: 10.1016/j.wasman.2019.05.043</identifier><identifier>PMID: 31279390</identifier><language>eng</language><publisher>United States: Elsevier Ltd</publisher><subject>Brazil ; Construction Materials ; Industrial Waste ; National scale survey ; Ready-mixed concrete production ; Recycling ; Returned concrete ; Waste Management ; Waste production</subject><ispartof>Waste management (Elmsford), 2019-07, Vol.94, p.146-152</ispartof><rights>2019 Elsevier Ltd</rights><rights>Copyright © 2019 Elsevier Ltd. All rights reserved.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c401t-647a8ceee7fc6a2faabf003ff903d8a07721a1cf79f3ab01f0a9f5be8a5c83b63</citedby><cites>FETCH-LOGICAL-c401t-647a8ceee7fc6a2faabf003ff903d8a07721a1cf79f3ab01f0a9f5be8a5c83b63</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids><backlink>$$Uhttps://www.ncbi.nlm.nih.gov/pubmed/31279390$$D View this record in MEDLINE/PubMed$$Hfree_for_read</backlink></links><search><creatorcontrib>Vieira, Luiz de Brito Prado</creatorcontrib><creatorcontrib>de Figueiredo, Antonio Domingues</creatorcontrib><creatorcontrib>Moriggi, Tacius</creatorcontrib><creatorcontrib>John, Vanderley M.</creatorcontrib><title>Waste generation from the production of ready-mixed concrete</title><title>Waste management (Elmsford)</title><addtitle>Waste Manag</addtitle><description>•National scale inventory of amount of waste produced in ready mix concrete plants.•Influence of concrete characteristics on the volume of residue adhered to the drum.•Mapping of the main factors affecting the concrete returned to the plant.•Real-scale parameterization of the waste generation in industrial production.
In Brazil, ready-mixed concrete (RMC) suppliers are adopting management strategies to reduce waste generation. This is because of the increasing scarcity of adequate places for the deposition of waste, which raises the associated costs. Therefore, it is necessary to know the actual volume production of residues in order to optimize the implementation of the recycling. The waste produced in RMC plants are mainly in the form of leftover concrete and adhered to the internal part of the drum of the mixer truck.
The present study analyzed the data and produced an inventory of the amount of waste generated by of one of the largest Brazilian concrete companies. In parallel, an experimental study was performed in the real conditions of an RMC plant in order to measure the influence of concrete characteristics on the volume of concrete adhered to the drum.
The results showed that about 3% of all the produced volume returns to the plant, comprising approximately 1.6% adhered concrete and 1.4% leftover concrete. The study proved that the volume of concrete adhered concrete depends on the cement consumption and the slump. The volume of concrete loaded and the region where the RMC plant is located do not influence those results. The inventory showed that the main cause of concrete leftovers is associated to over order and corresponds to 58% of this volume.</description><subject>Brazil</subject><subject>Construction Materials</subject><subject>Industrial Waste</subject><subject>National scale survey</subject><subject>Ready-mixed concrete production</subject><subject>Recycling</subject><subject>Returned concrete</subject><subject>Waste Management</subject><subject>Waste production</subject><issn>0956-053X</issn><issn>1879-2456</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNp9kE1LxDAQhoMo7rr6D0R69NI6aZp-gAiy-AWCF0VvYZpONMu2XZNW3X9v164ePQ0MzzsfD2PHHCIOPD1bRJ_oa2yiGHgRgYwgETtsyvOsCONEprtsCoVMQ5DiZcIOvF8A8CTnsM8mgsdZIQqYsvNn9B0Fr9SQw862TWBcWwfdGwUr11a9_um1JnCE1Tqs7RdVgW4b7aijQ7ZncOnpaFtn7On66nF-G94_3NzNL-9DnQDvwjTJMNdElBmdYmwQSwMgjClAVDlClsUcuTZZYQSWwA1gYWRJOUqdizIVM3Y6zh1Oeu_Jd6q2XtNyiQ21vVdxLEWe8ITLAU1GVLvWe0dGrZyt0a0VB7XxphZq9KY23hRINXgbYifbDX1ZU_UX-hU1ABcjQMOfH5ac8tpSo6myjnSnqtb-v-Eb9D-Beg</recordid><startdate>20190701</startdate><enddate>20190701</enddate><creator>Vieira, Luiz de Brito Prado</creator><creator>de Figueiredo, Antonio Domingues</creator><creator>Moriggi, Tacius</creator><creator>John, Vanderley M.</creator><general>Elsevier Ltd</general><scope>CGR</scope><scope>CUY</scope><scope>CVF</scope><scope>ECM</scope><scope>EIF</scope><scope>NPM</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7X8</scope></search><sort><creationdate>20190701</creationdate><title>Waste generation from the production of ready-mixed concrete</title><author>Vieira, Luiz de Brito Prado ; de Figueiredo, Antonio Domingues ; Moriggi, Tacius ; John, Vanderley M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c401t-647a8ceee7fc6a2faabf003ff903d8a07721a1cf79f3ab01f0a9f5be8a5c83b63</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Brazil</topic><topic>Construction Materials</topic><topic>Industrial Waste</topic><topic>National scale survey</topic><topic>Ready-mixed concrete production</topic><topic>Recycling</topic><topic>Returned concrete</topic><topic>Waste Management</topic><topic>Waste production</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Vieira, Luiz de Brito Prado</creatorcontrib><creatorcontrib>de Figueiredo, Antonio Domingues</creatorcontrib><creatorcontrib>Moriggi, Tacius</creatorcontrib><creatorcontrib>John, Vanderley M.</creatorcontrib><collection>Medline</collection><collection>MEDLINE</collection><collection>MEDLINE (Ovid)</collection><collection>MEDLINE</collection><collection>MEDLINE</collection><collection>PubMed</collection><collection>CrossRef</collection><collection>MEDLINE - Academic</collection><jtitle>Waste management (Elmsford)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Vieira, Luiz de Brito Prado</au><au>de Figueiredo, Antonio Domingues</au><au>Moriggi, Tacius</au><au>John, Vanderley M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Waste generation from the production of ready-mixed concrete</atitle><jtitle>Waste management (Elmsford)</jtitle><addtitle>Waste Manag</addtitle><date>2019-07-01</date><risdate>2019</risdate><volume>94</volume><spage>146</spage><epage>152</epage><pages>146-152</pages><issn>0956-053X</issn><eissn>1879-2456</eissn><abstract>•National scale inventory of amount of waste produced in ready mix concrete plants.•Influence of concrete characteristics on the volume of residue adhered to the drum.•Mapping of the main factors affecting the concrete returned to the plant.•Real-scale parameterization of the waste generation in industrial production.
In Brazil, ready-mixed concrete (RMC) suppliers are adopting management strategies to reduce waste generation. This is because of the increasing scarcity of adequate places for the deposition of waste, which raises the associated costs. Therefore, it is necessary to know the actual volume production of residues in order to optimize the implementation of the recycling. The waste produced in RMC plants are mainly in the form of leftover concrete and adhered to the internal part of the drum of the mixer truck.
The present study analyzed the data and produced an inventory of the amount of waste generated by of one of the largest Brazilian concrete companies. In parallel, an experimental study was performed in the real conditions of an RMC plant in order to measure the influence of concrete characteristics on the volume of concrete adhered to the drum.
The results showed that about 3% of all the produced volume returns to the plant, comprising approximately 1.6% adhered concrete and 1.4% leftover concrete. The study proved that the volume of concrete adhered concrete depends on the cement consumption and the slump. The volume of concrete loaded and the region where the RMC plant is located do not influence those results. The inventory showed that the main cause of concrete leftovers is associated to over order and corresponds to 58% of this volume.</abstract><cop>United States</cop><pub>Elsevier Ltd</pub><pmid>31279390</pmid><doi>10.1016/j.wasman.2019.05.043</doi><tpages>7</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0956-053X |
ispartof | Waste management (Elmsford), 2019-07, Vol.94, p.146-152 |
issn | 0956-053X 1879-2456 |
language | eng |
recordid | cdi_proquest_miscellaneous_2253841415 |
source | ScienceDirect Freedom Collection 2022-2024 |
subjects | Brazil Construction Materials Industrial Waste National scale survey Ready-mixed concrete production Recycling Returned concrete Waste Management Waste production |
title | Waste generation from the production of ready-mixed concrete |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T10%3A51%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Waste%20generation%20from%20the%20production%20of%20ready-mixed%20concrete&rft.jtitle=Waste%20management%20(Elmsford)&rft.au=Vieira,%20Luiz%20de%20Brito%20Prado&rft.date=2019-07-01&rft.volume=94&rft.spage=146&rft.epage=152&rft.pages=146-152&rft.issn=0956-053X&rft.eissn=1879-2456&rft_id=info:doi/10.1016/j.wasman.2019.05.043&rft_dat=%3Cproquest_cross%3E2253841415%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c401t-647a8ceee7fc6a2faabf003ff903d8a07721a1cf79f3ab01f0a9f5be8a5c83b63%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=2253841415&rft_id=info:pmid/31279390&rfr_iscdi=true |