The Rockport plant-analysis of temporary fast turbine valving tests

Temporary fast turbine valving (TFTV) field tests were carried out on AEP's 1300 MW Rockport unit. Tests at various unit loading levels verified the functional aspects of the TFTV scheme, including the control and intercept valve-stroke characteristics and the rapid reduction of mechanical driv...

Full description

Saved in:
Bibliographic Details
Published in:IEEE transactions on power systems 1988-05, Vol.3 (2), p.529-540
Main Authors: Pasternack, B.M., Bhatt, N.B.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Temporary fast turbine valving (TFTV) field tests were carried out on AEP's 1300 MW Rockport unit. Tests at various unit loading levels verified the functional aspects of the TFTV scheme, including the control and intercept valve-stroke characteristics and the rapid reduction of mechanical driving power. An analysis of the mechanical and electrical performance characteristics of the Rockport unit during TFTV is presented. A comparison of the test measurements with digital simulation results is provided to validate the simulation tools and models commonly used in system dynamics studies.< >
ISSN:0885-8950
1558-0679
DOI:10.1109/59.192904