Loading…
Multi-criteria assembly sequencing
This paper describes the elements of a multi-criteria optimization formulation of the assembly sequencing problem. The criteria considered are: total assembly time and number of reorientations. These two criteria are combined using multi-attribute utility theory to derive a single objective function...
Saved in:
Published in: | Computers & industrial engineering 1997-09, Vol.32 (4), p.743-751 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c367t-1e5664f6e892ffabe5de50e0f58dfda62949be04d74c4e703f4680693112e9663 |
---|---|
cites | cdi_FETCH-LOGICAL-c367t-1e5664f6e892ffabe5de50e0f58dfda62949be04d74c4e703f4680693112e9663 |
container_end_page | 751 |
container_issue | 4 |
container_start_page | 743 |
container_title | Computers & industrial engineering |
container_volume | 32 |
creator | Motavalli, Saeid Islam, Anwar-Ul |
description | This paper describes the elements of a multi-criteria optimization formulation of the assembly sequencing problem. The criteria considered are: total assembly time and number of reorientations. These two criteria are combined using multi-attribute utility theory to derive a single objective function. The combined objective function has been formulated subject to the precedence constraints of the assembly process. The model has been solved using simulated annealing. The elements of the developed algorithms and their performances are demonstrated in this paper. |
doi_str_mv | 10.1016/S0360-8352(97)00014-4 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_26368479</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0360835297000144</els_id><sourcerecordid>26368479</sourcerecordid><originalsourceid>FETCH-LOGICAL-c367t-1e5664f6e892ffabe5de50e0f58dfda62949be04d74c4e703f4680693112e9663</originalsourceid><addsrcrecordid>eNqFkEtLAzEUhYMoWKs_QSgioovozeS9Eim-oOJCXYc0cyORaacmU6H_3ukDt67u5jv3cD5CThlcM2Dq5g24Amq4rC6tvgIAJqjYIwNmtKUgJeyTwR9ySI5K-eohIS0bkLOXZdMlGnLqMCc_8qXgbNqsRgW_lzgPaf55TA6ibwqe7O6QfDzcv4-f6OT18Xl8N6GBK91RhlIpERUaW8XopyhrlIAQpalj7VVlhZ0iiFqLIFADj0IZUJYzVqFVig_JxfbvIrd9d-ncLJWATePn2C6LqxRXRmjbg3ILhtyWkjG6RU4zn1eOgVsbcRsjbj3XWe02Rpzoc-e7Al-Cb2L2_b7yF66YUVKssdsthv3Yn4TZlZB6FVinjKFzdZv-KfoFozlzfQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>26368479</pqid></control><display><type>article</type><title>Multi-criteria assembly sequencing</title><source>Elsevier</source><creator>Motavalli, Saeid ; Islam, Anwar-Ul</creator><creatorcontrib>Motavalli, Saeid ; Islam, Anwar-Ul</creatorcontrib><description>This paper describes the elements of a multi-criteria optimization formulation of the assembly sequencing problem. The criteria considered are: total assembly time and number of reorientations. These two criteria are combined using multi-attribute utility theory to derive a single objective function. The combined objective function has been formulated subject to the precedence constraints of the assembly process. The model has been solved using simulated annealing. The elements of the developed algorithms and their performances are demonstrated in this paper.</description><identifier>ISSN: 0360-8352</identifier><identifier>EISSN: 1879-0550</identifier><identifier>DOI: 10.1016/S0360-8352(97)00014-4</identifier><identifier>CODEN: CINDDL</identifier><language>eng</language><publisher>Seoul: Elsevier Ltd</publisher><subject>Applied sciences ; Computer science; control theory; systems ; Control theory. Systems ; Exact sciences and technology ; Inventory control, production control. Distribution ; Operational research and scientific management ; Operational research. Management science ; Process control. Computer integrated manufacturing</subject><ispartof>Computers & industrial engineering, 1997-09, Vol.32 (4), p.743-751</ispartof><rights>1997</rights><rights>1998 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c367t-1e5664f6e892ffabe5de50e0f58dfda62949be04d74c4e703f4680693112e9663</citedby><cites>FETCH-LOGICAL-c367t-1e5664f6e892ffabe5de50e0f58dfda62949be04d74c4e703f4680693112e9663</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27903,27904</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=2186544$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Motavalli, Saeid</creatorcontrib><creatorcontrib>Islam, Anwar-Ul</creatorcontrib><title>Multi-criteria assembly sequencing</title><title>Computers & industrial engineering</title><description>This paper describes the elements of a multi-criteria optimization formulation of the assembly sequencing problem. The criteria considered are: total assembly time and number of reorientations. These two criteria are combined using multi-attribute utility theory to derive a single objective function. The combined objective function has been formulated subject to the precedence constraints of the assembly process. The model has been solved using simulated annealing. The elements of the developed algorithms and their performances are demonstrated in this paper.</description><subject>Applied sciences</subject><subject>Computer science; control theory; systems</subject><subject>Control theory. Systems</subject><subject>Exact sciences and technology</subject><subject>Inventory control, production control. Distribution</subject><subject>Operational research and scientific management</subject><subject>Operational research. Management science</subject><subject>Process control. Computer integrated manufacturing</subject><issn>0360-8352</issn><issn>1879-0550</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1997</creationdate><recordtype>article</recordtype><recordid>eNqFkEtLAzEUhYMoWKs_QSgioovozeS9Eim-oOJCXYc0cyORaacmU6H_3ukDt67u5jv3cD5CThlcM2Dq5g24Amq4rC6tvgIAJqjYIwNmtKUgJeyTwR9ySI5K-eohIS0bkLOXZdMlGnLqMCc_8qXgbNqsRgW_lzgPaf55TA6ibwqe7O6QfDzcv4-f6OT18Xl8N6GBK91RhlIpERUaW8XopyhrlIAQpalj7VVlhZ0iiFqLIFADj0IZUJYzVqFVig_JxfbvIrd9d-ncLJWATePn2C6LqxRXRmjbg3ILhtyWkjG6RU4zn1eOgVsbcRsjbj3XWe02Rpzoc-e7Al-Cb2L2_b7yF66YUVKssdsthv3Yn4TZlZB6FVinjKFzdZv-KfoFozlzfQ</recordid><startdate>19970901</startdate><enddate>19970901</enddate><creator>Motavalli, Saeid</creator><creator>Islam, Anwar-Ul</creator><general>Elsevier Ltd</general><general>Pergamon Press</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>8FD</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope></search><sort><creationdate>19970901</creationdate><title>Multi-criteria assembly sequencing</title><author>Motavalli, Saeid ; Islam, Anwar-Ul</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c367t-1e5664f6e892ffabe5de50e0f58dfda62949be04d74c4e703f4680693112e9663</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1997</creationdate><topic>Applied sciences</topic><topic>Computer science; control theory; systems</topic><topic>Control theory. Systems</topic><topic>Exact sciences and technology</topic><topic>Inventory control, production control. Distribution</topic><topic>Operational research and scientific management</topic><topic>Operational research. Management science</topic><topic>Process control. Computer integrated manufacturing</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Motavalli, Saeid</creatorcontrib><creatorcontrib>Islam, Anwar-Ul</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts – Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>Computers & industrial engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Motavalli, Saeid</au><au>Islam, Anwar-Ul</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Multi-criteria assembly sequencing</atitle><jtitle>Computers & industrial engineering</jtitle><date>1997-09-01</date><risdate>1997</risdate><volume>32</volume><issue>4</issue><spage>743</spage><epage>751</epage><pages>743-751</pages><issn>0360-8352</issn><eissn>1879-0550</eissn><coden>CINDDL</coden><abstract>This paper describes the elements of a multi-criteria optimization formulation of the assembly sequencing problem. The criteria considered are: total assembly time and number of reorientations. These two criteria are combined using multi-attribute utility theory to derive a single objective function. The combined objective function has been formulated subject to the precedence constraints of the assembly process. The model has been solved using simulated annealing. The elements of the developed algorithms and their performances are demonstrated in this paper.</abstract><cop>Seoul</cop><cop>Oxford</cop><cop>New York, NY</cop><pub>Elsevier Ltd</pub><doi>10.1016/S0360-8352(97)00014-4</doi><tpages>9</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0360-8352 |
ispartof | Computers & industrial engineering, 1997-09, Vol.32 (4), p.743-751 |
issn | 0360-8352 1879-0550 |
language | eng |
recordid | cdi_proquest_miscellaneous_26368479 |
source | Elsevier |
subjects | Applied sciences Computer science control theory systems Control theory. Systems Exact sciences and technology Inventory control, production control. Distribution Operational research and scientific management Operational research. Management science Process control. Computer integrated manufacturing |
title | Multi-criteria assembly sequencing |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T00%3A21%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Multi-criteria%20assembly%20sequencing&rft.jtitle=Computers%20&%20industrial%20engineering&rft.au=Motavalli,%20Saeid&rft.date=1997-09-01&rft.volume=32&rft.issue=4&rft.spage=743&rft.epage=751&rft.pages=743-751&rft.issn=0360-8352&rft.eissn=1879-0550&rft.coden=CINDDL&rft_id=info:doi/10.1016/S0360-8352(97)00014-4&rft_dat=%3Cproquest_cross%3E26368479%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c367t-1e5664f6e892ffabe5de50e0f58dfda62949be04d74c4e703f4680693112e9663%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=26368479&rft_id=info:pmid/&rfr_iscdi=true |