Loading…
LONG-TERM SETTLEMENT OF A RAFT FOUNDATION ON SAND
Describes design considerations and long-term settlement observations for a large structure for diesel power generators. The subsoil was investigated by dynamic standard penetration tests (SPTs), cross-hole and laboratory tests. The measurement records show that a considerable part of the total sett...
Saved in:
Published in: | Proceedings of the Institution of Civil Engineers. Geotechnical engineering 1994-01, Vol.107 (1), p.11-16 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Describes design considerations and long-term settlement observations for a large structure for diesel power generators. The subsoil was investigated by dynamic standard penetration tests (SPTs), cross-hole and laboratory tests. The measurement records show that a considerable part of the total settlement occurred within 3 years of construction. (Original abstract-amended) |
---|---|
ISSN: | 1353-2618 1751-8563 |
DOI: | 10.1680/igeng.1994.25716 |