Loading…

Fuel cell operation on landfill gas at Penrose Power Station

This demonstration test successfully demonstrated the operation of a commercial phosphoric acid fuel cell (FC) on landfill gas (LG) at the Penrose Power Station in Sun Valley, CA. Demonstration output included operation up to 137 kW; 37.1% efficiency at 120 kW; exceptionally low secondary emissions...

Full description

Saved in:
Bibliographic Details
Published in:Energy (Oxford) 1999-08, Vol.24 (8), p.723-742
Main Authors: Spiegel, R.J, Preston, J.L, Trocciola, J.C
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This demonstration test successfully demonstrated the operation of a commercial phosphoric acid fuel cell (FC) on landfill gas (LG) at the Penrose Power Station in Sun Valley, CA. Demonstration output included operation up to 137 kW; 37.1% efficiency at 120 kW; exceptionally low secondary emissions (dry gas, 15% O 2) of 0.77 ppmV CO, 0.12 ppmV NO x , and undetectable SO 2; no forced outages with an adjusted availability of 98.5%; and a total of 707 h of operation on LG. The LG pretreatment unit (GPU) operated for a total of 2297 h, including the 707 h with the FC, and documented total sulfur and halide removal to much lower than the specified
ISSN:0360-5442
DOI:10.1016/S0360-5442(99)00022-5