Loading…
TUNNELS - THE PRECASTING PLANT
Describes the precasting installation at Sangatte, its operation and performance levels achieved. The stringent quality control procedures are also explained.
Saved in:
Published in: | Proceedings of the Institution of Civil Engineers. Civil engineering 1994-01, Vol.102 (5), p.52-57 |
---|---|
Main Authors: | , , , , , , , , , , , , |
Format: | Article |
Language: | English |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 57 |
container_issue | 5 |
container_start_page | 52 |
container_title | Proceedings of the Institution of Civil Engineers. Civil engineering |
container_volume | 102 |
creator | BARTHES, H BORDAS, A BOUILLOT, D BUZON, M DUMONT, P FERMIN, J LANDRY, J C LARIVE, J P LEBLOND, L MORLOT, J J SZYPURA, L VANDEBROUCK, P VIELLIARD, B |
description | Describes the precasting installation at Sangatte, its operation and performance levels achieved. The stringent quality control procedures are also explained. |
doi_str_mv | 10.1680/icien.1994.26812 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_27282148</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>27282148</sourcerecordid><originalsourceid>FETCH-LOGICAL-c225t-7c328c3476f4f6b913fdb2604634c7c732ae16ac00691654f8060696aa82ed223</originalsourceid><addsrcrecordid>eNot0D1PwzAYBGALgUQo7EwoE5uD_dp57YxRFNpKUahoKrFZrutIQWlT4nbg39MPprvhdMNDyDNnCUfN3jrX-V3Cs0wmgJrDDYm4SjlVqOCWRCzDlDKdfd2ThxC-GQOOSkTkpVnVdVktYxo3szJefJZFvmzm9TReVHndPJK71vbBP_3nhKzey6aY0epjOi_yijqA9ECVE6CdkApb2eI646LdrAGZRCGdckqA9RytYwwzjqlsNcNTRWs1-A2AmJDX6-9-HH6OPhzMtgvO973d-eEYDCjQwKU-Ddl16MYhhNG3Zj92Wzv-Gs7MGcJcIMwZwlwgxB8e0kyi</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>27282148</pqid></control><display><type>article</type><title>TUNNELS - THE PRECASTING PLANT</title><source>Institution of Civil Engineers Publishing: JISC Collections:Virtual Library Archive (1836-2001)</source><creator>BARTHES, H ; BORDAS, A ; BOUILLOT, D ; BUZON, M ; DUMONT, P ; FERMIN, J ; LANDRY, J C ; LARIVE, J P ; LEBLOND, L ; MORLOT, J J ; SZYPURA, L ; VANDEBROUCK, P ; VIELLIARD, B</creator><creatorcontrib>BARTHES, H ; BORDAS, A ; BOUILLOT, D ; BUZON, M ; DUMONT, P ; FERMIN, J ; LANDRY, J C ; LARIVE, J P ; LEBLOND, L ; MORLOT, J J ; SZYPURA, L ; VANDEBROUCK, P ; VIELLIARD, B</creatorcontrib><description>Describes the precasting installation at Sangatte, its operation and performance levels achieved. The stringent quality control procedures are also explained.</description><identifier>ISSN: 0965-089X</identifier><identifier>EISSN: 1751-7672</identifier><identifier>DOI: 10.1680/icien.1994.26812</identifier><language>eng</language><ispartof>Proceedings of the Institution of Civil Engineers. Civil engineering, 1994-01, Vol.102 (5), p.52-57</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>BARTHES, H</creatorcontrib><creatorcontrib>BORDAS, A</creatorcontrib><creatorcontrib>BOUILLOT, D</creatorcontrib><creatorcontrib>BUZON, M</creatorcontrib><creatorcontrib>DUMONT, P</creatorcontrib><creatorcontrib>FERMIN, J</creatorcontrib><creatorcontrib>LANDRY, J C</creatorcontrib><creatorcontrib>LARIVE, J P</creatorcontrib><creatorcontrib>LEBLOND, L</creatorcontrib><creatorcontrib>MORLOT, J J</creatorcontrib><creatorcontrib>SZYPURA, L</creatorcontrib><creatorcontrib>VANDEBROUCK, P</creatorcontrib><creatorcontrib>VIELLIARD, B</creatorcontrib><title>TUNNELS - THE PRECASTING PLANT</title><title>Proceedings of the Institution of Civil Engineers. Civil engineering</title><description>Describes the precasting installation at Sangatte, its operation and performance levels achieved. The stringent quality control procedures are also explained.</description><issn>0965-089X</issn><issn>1751-7672</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1994</creationdate><recordtype>article</recordtype><recordid>eNot0D1PwzAYBGALgUQo7EwoE5uD_dp57YxRFNpKUahoKrFZrutIQWlT4nbg39MPprvhdMNDyDNnCUfN3jrX-V3Cs0wmgJrDDYm4SjlVqOCWRCzDlDKdfd2ThxC-GQOOSkTkpVnVdVktYxo3szJefJZFvmzm9TReVHndPJK71vbBP_3nhKzey6aY0epjOi_yijqA9ECVE6CdkApb2eI646LdrAGZRCGdckqA9RytYwwzjqlsNcNTRWs1-A2AmJDX6-9-HH6OPhzMtgvO973d-eEYDCjQwKU-Ddl16MYhhNG3Zj92Wzv-Gs7MGcJcIMwZwlwgxB8e0kyi</recordid><startdate>19940101</startdate><enddate>19940101</enddate><creator>BARTHES, H</creator><creator>BORDAS, A</creator><creator>BOUILLOT, D</creator><creator>BUZON, M</creator><creator>DUMONT, P</creator><creator>FERMIN, J</creator><creator>LANDRY, J C</creator><creator>LARIVE, J P</creator><creator>LEBLOND, L</creator><creator>MORLOT, J J</creator><creator>SZYPURA, L</creator><creator>VANDEBROUCK, P</creator><creator>VIELLIARD, B</creator><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>F28</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>19940101</creationdate><title>TUNNELS - THE PRECASTING PLANT</title><author>BARTHES, H ; BORDAS, A ; BOUILLOT, D ; BUZON, M ; DUMONT, P ; FERMIN, J ; LANDRY, J C ; LARIVE, J P ; LEBLOND, L ; MORLOT, J J ; SZYPURA, L ; VANDEBROUCK, P ; VIELLIARD, B</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c225t-7c328c3476f4f6b913fdb2604634c7c732ae16ac00691654f8060696aa82ed223</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1994</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>BARTHES, H</creatorcontrib><creatorcontrib>BORDAS, A</creatorcontrib><creatorcontrib>BOUILLOT, D</creatorcontrib><creatorcontrib>BUZON, M</creatorcontrib><creatorcontrib>DUMONT, P</creatorcontrib><creatorcontrib>FERMIN, J</creatorcontrib><creatorcontrib>LANDRY, J C</creatorcontrib><creatorcontrib>LARIVE, J P</creatorcontrib><creatorcontrib>LEBLOND, L</creatorcontrib><creatorcontrib>MORLOT, J J</creatorcontrib><creatorcontrib>SZYPURA, L</creatorcontrib><creatorcontrib>VANDEBROUCK, P</creatorcontrib><creatorcontrib>VIELLIARD, B</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>ANTE: Abstracts in New Technology & Engineering</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Proceedings of the Institution of Civil Engineers. Civil engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>BARTHES, H</au><au>BORDAS, A</au><au>BOUILLOT, D</au><au>BUZON, M</au><au>DUMONT, P</au><au>FERMIN, J</au><au>LANDRY, J C</au><au>LARIVE, J P</au><au>LEBLOND, L</au><au>MORLOT, J J</au><au>SZYPURA, L</au><au>VANDEBROUCK, P</au><au>VIELLIARD, B</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>TUNNELS - THE PRECASTING PLANT</atitle><jtitle>Proceedings of the Institution of Civil Engineers. Civil engineering</jtitle><date>1994-01-01</date><risdate>1994</risdate><volume>102</volume><issue>5</issue><spage>52</spage><epage>57</epage><pages>52-57</pages><issn>0965-089X</issn><eissn>1751-7672</eissn><abstract>Describes the precasting installation at Sangatte, its operation and performance levels achieved. The stringent quality control procedures are also explained.</abstract><doi>10.1680/icien.1994.26812</doi><tpages>6</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0965-089X |
ispartof | Proceedings of the Institution of Civil Engineers. Civil engineering, 1994-01, Vol.102 (5), p.52-57 |
issn | 0965-089X 1751-7672 |
language | eng |
recordid | cdi_proquest_miscellaneous_27282148 |
source | Institution of Civil Engineers Publishing: JISC Collections:Virtual Library Archive (1836-2001) |
title | TUNNELS - THE PRECASTING PLANT |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T04%3A41%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=TUNNELS%20-%20THE%20PRECASTING%20PLANT&rft.jtitle=Proceedings%20of%20the%20Institution%20of%20Civil%20Engineers.%20Civil%20engineering&rft.au=BARTHES,%20H&rft.date=1994-01-01&rft.volume=102&rft.issue=5&rft.spage=52&rft.epage=57&rft.pages=52-57&rft.issn=0965-089X&rft.eissn=1751-7672&rft_id=info:doi/10.1680/icien.1994.26812&rft_dat=%3Cproquest_cross%3E27282148%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c225t-7c328c3476f4f6b913fdb2604634c7c732ae16ac00691654f8060696aa82ed223%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=27282148&rft_id=info:pmid/&rfr_iscdi=true |