Loading…
Construction of large cross-section double-tier Metropolitan Inter-city Highway (Ken-O-Do) Ome Tunnel by NATM
Ome Tunnel is a double-tier highway tunnel with large cross-section of 220–260 m 2 excavated at a shallow depth in unconsolidated ground. The tunnel was excavated by NATM. Since the tunnel passes under a road in dense residential area, surface settlement due to tunneling was restricted. Therefore, v...
Saved in:
Published in: | Tunnelling and underground space technology 2005-03, Vol.20 (2), p.111-119 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Ome Tunnel is a double-tier highway tunnel with large cross-section of 220–260 m
2 excavated at a shallow depth in unconsolidated ground. The tunnel was excavated by NATM. Since the tunnel passes under a road in dense residential area, surface settlement due to tunneling was restricted. Therefore, various auxiliary construction method such as long span steel pipe fore-piling with injection was adopted based on monitoring and analyzing ground behavior during construction. A total of 1060 m of tunneling work was successfully completed without major interruption of work excessive damage on surface residents and other facilities. |
---|---|
ISSN: | 0886-7798 1878-4364 |
DOI: | 10.1016/j.tust.2003.08.007 |