Loading…
Decreasing the passenger waiting time for an intercity rail network
To improve the robustness of timetables for a network of passenger train services, this paper seeks to minimize a waiting cost function that includes running time supplements and different types of waiting times and late arrivals. The approach is applied to the whole intercity (IC) network of the Be...
Saved in:
Published in: | Transportation research. Part B: methodological 2007-05, Vol.41 (4), p.478-492 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c550t-278b8f872a58b0c7e8ee72a08131fe3164eead3d43720fa2888dfcbafadf0b853 |
---|---|
cites | cdi_FETCH-LOGICAL-c550t-278b8f872a58b0c7e8ee72a08131fe3164eead3d43720fa2888dfcbafadf0b853 |
container_end_page | 492 |
container_issue | 4 |
container_start_page | 478 |
container_title | Transportation research. Part B: methodological |
container_volume | 41 |
creator | Vansteenwegen, P. Van Oudheusden, D. |
description | To improve the robustness of timetables for a network of passenger train services, this paper seeks to minimize a waiting cost function that includes running time supplements and different types of waiting times and late arrivals. The approach is applied to the whole intercity (IC) network of the Belgian railways. The IC network consists of 14 fast trains connecting all major cities in Belgium. In the first phase of the approach, ideal running time supplements are calculated to safeguard connections when the feeder train is late. These supplements are based on the delay distributions of the trains, the passenger counts and on the weighting of different types of waiting times. In a second phase, continuous Linear Programming (LP) is used to construct an improved timetable with well-scheduled connections and, whenever possible, with ideal running time supplements. Simulation evaluates different timetables and makes further improvement of the LP timetable possible. For the case of the IC network, the final result is a timetable with suitable transfer times and a waiting cost, that is, 40% lower than the current timetable. Since continuous LP modelling is applied, the proposed technique is very promising for developing better timetables – even for very extensive railway networks. |
doi_str_mv | 10.1016/j.trb.2006.06.006 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_29380131</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0191261506001044</els_id><sourcerecordid>29380131</sourcerecordid><originalsourceid>FETCH-LOGICAL-c550t-278b8f872a58b0c7e8ee72a08131fe3164eead3d43720fa2888dfcbafadf0b853</originalsourceid><addsrcrecordid>eNp9UMtu2zAQJIoGqOvkA3rTpb3JWZJ60OgpcJoXDOSSnIkVtUzoypJC0gn896Vio7kF2OWAi5nBYBj7wWHBgVfnm0X0zUIAVItpoPrCZlzVy1zIqv7KZsCXPBcVL7-x7yFsAEAWwGdsdUnGEwbXP2XxmbIRQ6D-iXz2hi6-X92WMjv4DPvM9ZG8cXGfeXRd1lN8G_zfU3ZisQt0dsQ5e7z687C6ydf317eri3VuyhJiLmrVKKtqgaVqwNSkiNIHFJfckuRVQYStbAtZC7AolFKtNQ1abC00qpRz9uvgO_rhZUch6q0LhroOexp2QYulVJDMEpEfiMYPIXiyevRui36vOeipLr3RqS491aWngSpp7g4aTyOZ_wIiih770OhXLbHg6dmnTco6gZtuaccJa6WLpdDPcZvMfh6TYjDY2eRgXPhIoQrFCyUS7_eBR6m2V0deB-OoN9Q6TybqdnCfRP4HaliZgw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>29380131</pqid></control><display><type>article</type><title>Decreasing the passenger waiting time for an intercity rail network</title><source>ScienceDirect Journals</source><creator>Vansteenwegen, P. ; Van Oudheusden, D.</creator><creatorcontrib>Vansteenwegen, P. ; Van Oudheusden, D.</creatorcontrib><description>To improve the robustness of timetables for a network of passenger train services, this paper seeks to minimize a waiting cost function that includes running time supplements and different types of waiting times and late arrivals. The approach is applied to the whole intercity (IC) network of the Belgian railways. The IC network consists of 14 fast trains connecting all major cities in Belgium. In the first phase of the approach, ideal running time supplements are calculated to safeguard connections when the feeder train is late. These supplements are based on the delay distributions of the trains, the passenger counts and on the weighting of different types of waiting times. In a second phase, continuous Linear Programming (LP) is used to construct an improved timetable with well-scheduled connections and, whenever possible, with ideal running time supplements. Simulation evaluates different timetables and makes further improvement of the LP timetable possible. For the case of the IC network, the final result is a timetable with suitable transfer times and a waiting cost, that is, 40% lower than the current timetable. Since continuous LP modelling is applied, the proposed technique is very promising for developing better timetables – even for very extensive railway networks.</description><identifier>ISSN: 0191-2615</identifier><identifier>EISSN: 1879-2367</identifier><identifier>DOI: 10.1016/j.trb.2006.06.006</identifier><identifier>CODEN: TRBMDY</identifier><language>eng</language><publisher>Kidlington: Elsevier Ltd</publisher><subject>Applied sciences ; Exact sciences and technology ; Ground, air and sea transportation, marine construction ; Linear programming ; Railway transfers ; Railway transportation and traffic ; Robustness ; Running time supplements ; Timetabling ; Transportation planning, management and economics</subject><ispartof>Transportation research. Part B: methodological, 2007-05, Vol.41 (4), p.478-492</ispartof><rights>2006 Elsevier Ltd</rights><rights>2007 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c550t-278b8f872a58b0c7e8ee72a08131fe3164eead3d43720fa2888dfcbafadf0b853</citedby><cites>FETCH-LOGICAL-c550t-278b8f872a58b0c7e8ee72a08131fe3164eead3d43720fa2888dfcbafadf0b853</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=18481482$$DView record in Pascal Francis$$Hfree_for_read</backlink><backlink>$$Uhttp://econpapers.repec.org/article/eeetransb/v_3a41_3ay_3a2007_3ai_3a4_3ap_3a478-492.htm$$DView record in RePEc$$Hfree_for_read</backlink></links><search><creatorcontrib>Vansteenwegen, P.</creatorcontrib><creatorcontrib>Van Oudheusden, D.</creatorcontrib><title>Decreasing the passenger waiting time for an intercity rail network</title><title>Transportation research. Part B: methodological</title><description>To improve the robustness of timetables for a network of passenger train services, this paper seeks to minimize a waiting cost function that includes running time supplements and different types of waiting times and late arrivals. The approach is applied to the whole intercity (IC) network of the Belgian railways. The IC network consists of 14 fast trains connecting all major cities in Belgium. In the first phase of the approach, ideal running time supplements are calculated to safeguard connections when the feeder train is late. These supplements are based on the delay distributions of the trains, the passenger counts and on the weighting of different types of waiting times. In a second phase, continuous Linear Programming (LP) is used to construct an improved timetable with well-scheduled connections and, whenever possible, with ideal running time supplements. Simulation evaluates different timetables and makes further improvement of the LP timetable possible. For the case of the IC network, the final result is a timetable with suitable transfer times and a waiting cost, that is, 40% lower than the current timetable. Since continuous LP modelling is applied, the proposed technique is very promising for developing better timetables – even for very extensive railway networks.</description><subject>Applied sciences</subject><subject>Exact sciences and technology</subject><subject>Ground, air and sea transportation, marine construction</subject><subject>Linear programming</subject><subject>Railway transfers</subject><subject>Railway transportation and traffic</subject><subject>Robustness</subject><subject>Running time supplements</subject><subject>Timetabling</subject><subject>Transportation planning, management and economics</subject><issn>0191-2615</issn><issn>1879-2367</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2007</creationdate><recordtype>article</recordtype><recordid>eNp9UMtu2zAQJIoGqOvkA3rTpb3JWZJ60OgpcJoXDOSSnIkVtUzoypJC0gn896Vio7kF2OWAi5nBYBj7wWHBgVfnm0X0zUIAVItpoPrCZlzVy1zIqv7KZsCXPBcVL7-x7yFsAEAWwGdsdUnGEwbXP2XxmbIRQ6D-iXz2hi6-X92WMjv4DPvM9ZG8cXGfeXRd1lN8G_zfU3ZisQt0dsQ5e7z687C6ydf317eri3VuyhJiLmrVKKtqgaVqwNSkiNIHFJfckuRVQYStbAtZC7AolFKtNQ1abC00qpRz9uvgO_rhZUch6q0LhroOexp2QYulVJDMEpEfiMYPIXiyevRui36vOeipLr3RqS491aWngSpp7g4aTyOZ_wIiih770OhXLbHg6dmnTco6gZtuaccJa6WLpdDPcZvMfh6TYjDY2eRgXPhIoQrFCyUS7_eBR6m2V0deB-OoN9Q6TybqdnCfRP4HaliZgw</recordid><startdate>20070501</startdate><enddate>20070501</enddate><creator>Vansteenwegen, P.</creator><creator>Van Oudheusden, D.</creator><general>Elsevier Ltd</general><general>Elsevier</general><scope>IQODW</scope><scope>DKI</scope><scope>X2L</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20070501</creationdate><title>Decreasing the passenger waiting time for an intercity rail network</title><author>Vansteenwegen, P. ; Van Oudheusden, D.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c550t-278b8f872a58b0c7e8ee72a08131fe3164eead3d43720fa2888dfcbafadf0b853</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2007</creationdate><topic>Applied sciences</topic><topic>Exact sciences and technology</topic><topic>Ground, air and sea transportation, marine construction</topic><topic>Linear programming</topic><topic>Railway transfers</topic><topic>Railway transportation and traffic</topic><topic>Robustness</topic><topic>Running time supplements</topic><topic>Timetabling</topic><topic>Transportation planning, management and economics</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Vansteenwegen, P.</creatorcontrib><creatorcontrib>Van Oudheusden, D.</creatorcontrib><collection>Pascal-Francis</collection><collection>RePEc IDEAS</collection><collection>RePEc</collection><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Transportation research. Part B: methodological</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Vansteenwegen, P.</au><au>Van Oudheusden, D.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Decreasing the passenger waiting time for an intercity rail network</atitle><jtitle>Transportation research. Part B: methodological</jtitle><date>2007-05-01</date><risdate>2007</risdate><volume>41</volume><issue>4</issue><spage>478</spage><epage>492</epage><pages>478-492</pages><issn>0191-2615</issn><eissn>1879-2367</eissn><coden>TRBMDY</coden><abstract>To improve the robustness of timetables for a network of passenger train services, this paper seeks to minimize a waiting cost function that includes running time supplements and different types of waiting times and late arrivals. The approach is applied to the whole intercity (IC) network of the Belgian railways. The IC network consists of 14 fast trains connecting all major cities in Belgium. In the first phase of the approach, ideal running time supplements are calculated to safeguard connections when the feeder train is late. These supplements are based on the delay distributions of the trains, the passenger counts and on the weighting of different types of waiting times. In a second phase, continuous Linear Programming (LP) is used to construct an improved timetable with well-scheduled connections and, whenever possible, with ideal running time supplements. Simulation evaluates different timetables and makes further improvement of the LP timetable possible. For the case of the IC network, the final result is a timetable with suitable transfer times and a waiting cost, that is, 40% lower than the current timetable. Since continuous LP modelling is applied, the proposed technique is very promising for developing better timetables – even for very extensive railway networks.</abstract><cop>Kidlington</cop><pub>Elsevier Ltd</pub><doi>10.1016/j.trb.2006.06.006</doi><tpages>15</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0191-2615 |
ispartof | Transportation research. Part B: methodological, 2007-05, Vol.41 (4), p.478-492 |
issn | 0191-2615 1879-2367 |
language | eng |
recordid | cdi_proquest_miscellaneous_29380131 |
source | ScienceDirect Journals |
subjects | Applied sciences Exact sciences and technology Ground, air and sea transportation, marine construction Linear programming Railway transfers Railway transportation and traffic Robustness Running time supplements Timetabling Transportation planning, management and economics |
title | Decreasing the passenger waiting time for an intercity rail network |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T23%3A34%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Decreasing%20the%20passenger%20waiting%20time%20for%20an%20intercity%20rail%20network&rft.jtitle=Transportation%20research.%20Part%20B:%20methodological&rft.au=Vansteenwegen,%20P.&rft.date=2007-05-01&rft.volume=41&rft.issue=4&rft.spage=478&rft.epage=492&rft.pages=478-492&rft.issn=0191-2615&rft.eissn=1879-2367&rft.coden=TRBMDY&rft_id=info:doi/10.1016/j.trb.2006.06.006&rft_dat=%3Cproquest_cross%3E29380131%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c550t-278b8f872a58b0c7e8ee72a08131fe3164eead3d43720fa2888dfcbafadf0b853%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=29380131&rft_id=info:pmid/&rfr_iscdi=true |