This paper reports on the feasibility study performed to investigate the possibilities of connecting the 640-MW off-shore wind power farm, planned for Kriegers Flak 30 km south of Trelleborg, to the E.ON 130-kV subtransmission system. The Kriegers Flak commissioning is planned for 2010. The aim of t...
Saved in:
Published in: | IEEE transactions on energy conversion 2007-03, Vol.22 (1), p.79-85 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c415t-54b48f4af53d8e91c9641df16886b1b54b931be47694878092afb1c5e0900dc33 |
---|---|
cites | cdi_FETCH-LOGICAL-c415t-54b48f4af53d8e91c9641df16886b1b54b931be47694878092afb1c5e0900dc33 |
container_end_page | 85 |
container_issue | 1 |
container_start_page | 79 |
container_title | IEEE transactions on energy conversion |
container_volume | 22 |
creator | Andersson, D. Petersson, A. Agneholm, E. Karlsson, D. |
description | This paper reports on the feasibility study performed to investigate the possibilities of connecting the 640-MW off-shore wind power farm, planned for Kriegers Flak 30 km south of Trelleborg, to the E.ON 130-kV subtransmission system. The Kriegers Flak commissioning is planned for 2010. The aim of this study is to answer the question if such a connection is possible, and under what conditions; it is not meant as a design project. Following a general connection design discussion, the study comprises of three major parts: fault current calculations, load flow calculations, and dynamic simulations. The study shows that it is possible to connect such a large off-shore wind power farm to the 130-kV subtransmission system, but reinforcement concerning load currents during normal operation and fault currents have to be made |
doi_str_mv | 10.1109/TEC.2006.889545 |
format | article |
fullrecord | <record><control><sourceid>proquest_ieee_</sourceid><recordid>TN_cdi_proquest_miscellaneous_34594863</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4105992</ieee_id><sourcerecordid>20762773</sourcerecordid><originalsourceid>FETCH-LOGICAL-c415t-54b48f4af53d8e91c9641df16886b1b54b931be47694878092afb1c5e0900dc33</originalsourceid><addsrcrecordid>eNqF0T1PHDEQBmArSqRcIDUFjZUipNljxuvPEq2AIECgHIjS2o_ZZC_LGuw7If49Ph1KQUEqS-NnZqR5GdtDmCOCO7w5ruYCQM-tdUqqD2yGStkCQLmPbAbWqsI67T6zLyktAVAqgTO2OI8D_aaY-MlY_-VaAr-841d9Xyz-hEj8bpg6fh2eKPLTOHS8CtNE7WoIU3HEf1E98usYlrnCqzoRX6zW3fMu-9TXY6Kvr-8Ouz05vql-FhdXp2fV0UXRSlSrQslG2l7WvSo7Sw5bpyV2PWprdYNN_nYlNiSNdtIaC07UfYOtInAAXVuWO-xgO_chhsc1pZW_H1JL41hPFNbJW6OFKI2wWX5_V5ZS5R26_C8UkGcas4E_3oVojEGtQOlMv72hy7COU76Mt1oaqbUVGR1uURtDSpF6_xCH-zo-ewS_ydfnfP0mX7_NN3fsbzsGIvqnJea8nShfAAsRnEk</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>864746682</pqid></control><display><type>article</type><title>Kriegers Flak 640 MW Off-Shore Wind Power Grid Connection-A Real Project Case Study</title><source>IEEE Xplore (Online service)</source><creator>Andersson, D. ; Petersson, A. ; Agneholm, E. ; Karlsson, D.</creator><creatorcontrib>Andersson, D. ; Petersson, A. ; Agneholm, E. ; Karlsson, D.</creatorcontrib><description>This paper reports on the feasibility study performed to investigate the possibilities of connecting the 640-MW off-shore wind power farm, planned for Kriegers Flak 30 km south of Trelleborg, to the E.ON 130-kV subtransmission system. The Kriegers Flak commissioning is planned for 2010. The aim of this study is to answer the question if such a connection is possible, and under what conditions; it is not meant as a design project. Following a general connection design discussion, the study comprises of three major parts: fault current calculations, load flow calculations, and dynamic simulations. The study shows that it is possible to connect such a large off-shore wind power farm to the 130-kV subtransmission system, but reinforcement concerning load currents during normal operation and fault currents have to be made</description><identifier>ISSN: 0885-8969</identifier><identifier>EISSN: 1558-0059</identifier><identifier>DOI: 10.1109/TEC.2006.889545</identifier><identifier>CODEN: ITCNE4</identifier><language>eng</language><publisher>New York: IEEE</publisher><subject>Design engineering ; Dynamics ; Fault currents ; Grid code ; grid wind power connection ; grid wind power interaction ; Joining processes ; Joints ; Large-scale systems ; Load flow ; Mathematical analysis ; Mesh generation ; off-shore ; Offshore engineering ; Offshore structures ; Power generation ; Power system stability ; Wind energy ; Wind energy generation ; Wind power ; Wind power generation</subject><ispartof>IEEE transactions on energy conversion, 2007-03, Vol.22 (1), p.79-85</ispartof><rights>Copyright The Institute of Electrical and Electronics Engineers, Inc. (IEEE) 2007</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c415t-54b48f4af53d8e91c9641df16886b1b54b931be47694878092afb1c5e0900dc33</citedby><cites>FETCH-LOGICAL-c415t-54b48f4af53d8e91c9641df16886b1b54b931be47694878092afb1c5e0900dc33</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4105992$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>314,780,784,27924,27925,54796</link.rule.ids></links><search><creatorcontrib>Andersson, D.</creatorcontrib><creatorcontrib>Petersson, A.</creatorcontrib><creatorcontrib>Agneholm, E.</creatorcontrib><creatorcontrib>Karlsson, D.</creatorcontrib><title>Kriegers Flak 640 MW Off-Shore Wind Power Grid Connection-A Real Project Case Study</title><title>IEEE transactions on energy conversion</title><addtitle>TEC</addtitle><description>This paper reports on the feasibility study performed to investigate the possibilities of connecting the 640-MW off-shore wind power farm, planned for Kriegers Flak 30 km south of Trelleborg, to the E.ON 130-kV subtransmission system. The Kriegers Flak commissioning is planned for 2010. The aim of this study is to answer the question if such a connection is possible, and under what conditions; it is not meant as a design project. Following a general connection design discussion, the study comprises of three major parts: fault current calculations, load flow calculations, and dynamic simulations. The study shows that it is possible to connect such a large off-shore wind power farm to the 130-kV subtransmission system, but reinforcement concerning load currents during normal operation and fault currents have to be made</description><subject>Design engineering</subject><subject>Dynamics</subject><subject>Fault currents</subject><subject>Grid code</subject><subject>grid wind power connection</subject><subject>grid wind power interaction</subject><subject>Joining processes</subject><subject>Joints</subject><subject>Large-scale systems</subject><subject>Load flow</subject><subject>Mathematical analysis</subject><subject>Mesh generation</subject><subject>off-shore</subject><subject>Offshore engineering</subject><subject>Offshore structures</subject><subject>Power generation</subject><subject>Power system stability</subject><subject>Wind energy</subject><subject>Wind energy generation</subject><subject>Wind power</subject><subject>Wind power generation</subject><issn>0885-8969</issn><issn>1558-0059</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2007</creationdate><recordtype>article</recordtype><recordid>eNqF0T1PHDEQBmArSqRcIDUFjZUipNljxuvPEq2AIECgHIjS2o_ZZC_LGuw7If49Ph1KQUEqS-NnZqR5GdtDmCOCO7w5ruYCQM-tdUqqD2yGStkCQLmPbAbWqsI67T6zLyktAVAqgTO2OI8D_aaY-MlY_-VaAr-841d9Xyz-hEj8bpg6fh2eKPLTOHS8CtNE7WoIU3HEf1E98usYlrnCqzoRX6zW3fMu-9TXY6Kvr-8Ouz05vql-FhdXp2fV0UXRSlSrQslG2l7WvSo7Sw5bpyV2PWprdYNN_nYlNiSNdtIaC07UfYOtInAAXVuWO-xgO_chhsc1pZW_H1JL41hPFNbJW6OFKI2wWX5_V5ZS5R26_C8UkGcas4E_3oVojEGtQOlMv72hy7COU76Mt1oaqbUVGR1uURtDSpF6_xCH-zo-ewS_ydfnfP0mX7_NN3fsbzsGIvqnJea8nShfAAsRnEk</recordid><startdate>20070301</startdate><enddate>20070301</enddate><creator>Andersson, D.</creator><creator>Petersson, A.</creator><creator>Agneholm, E.</creator><creator>Karlsson, D.</creator><general>IEEE</general><general>The Institute of Electrical and Electronics Engineers, Inc. (IEEE)</general><scope>97E</scope><scope>RIA</scope><scope>RIE</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope><scope>L7M</scope><scope>7SU</scope><scope>C1K</scope><scope>F28</scope><scope>H8D</scope><scope>7ST</scope><scope>7TG</scope><scope>7U6</scope><scope>KL.</scope></search><sort><creationdate>20070301</creationdate><title>Kriegers Flak 640 MW Off-Shore Wind Power Grid Connection-A Real Project Case Study</title><author>Andersson, D. ; Petersson, A. ; Agneholm, E. ; Karlsson, D.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c415t-54b48f4af53d8e91c9641df16886b1b54b931be47694878092afb1c5e0900dc33</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2007</creationdate><topic>Design engineering</topic><topic>Dynamics</topic><topic>Fault currents</topic><topic>Grid code</topic><topic>grid wind power connection</topic><topic>grid wind power interaction</topic><topic>Joining processes</topic><topic>Joints</topic><topic>Large-scale systems</topic><topic>Load flow</topic><topic>Mathematical analysis</topic><topic>Mesh generation</topic><topic>off-shore</topic><topic>Offshore engineering</topic><topic>Offshore structures</topic><topic>Power generation</topic><topic>Power system stability</topic><topic>Wind energy</topic><topic>Wind energy generation</topic><topic>Wind power</topic><topic>Wind power generation</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Andersson, D.</creatorcontrib><creatorcontrib>Petersson, A.</creatorcontrib><creatorcontrib>Agneholm, E.</creatorcontrib><creatorcontrib>Karlsson, D.</creatorcontrib><collection>IEEE All-Society Periodicals Package (ASPP) 2005–Present</collection><collection>IEEE All-Society Periodicals Package (ASPP) Online</collection><collection>IEEE Xplore (Online service)</collection><collection>CrossRef</collection><collection>Electronics & Communications Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Environmental Engineering Abstracts</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ANTE: Abstracts in New Technology & Engineering</collection><collection>Aerospace Database</collection><collection>Environment Abstracts</collection><collection>Meteorological & Geoastrophysical Abstracts</collection><collection>Sustainability Science Abstracts</collection><collection>Meteorological & Geoastrophysical Abstracts - Academic</collection><jtitle>IEEE transactions on energy conversion</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Andersson, D.</au><au>Petersson, A.</au><au>Agneholm, E.</au><au>Karlsson, D.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Kriegers Flak 640 MW Off-Shore Wind Power Grid Connection-A Real Project Case Study</atitle><jtitle>IEEE transactions on energy conversion</jtitle><stitle>TEC</stitle><date>2007-03-01</date><risdate>2007</risdate><volume>22</volume><issue>1</issue><spage>79</spage><epage>85</epage><pages>79-85</pages><issn>0885-8969</issn><eissn>1558-0059</eissn><coden>ITCNE4</coden><abstract>This paper reports on the feasibility study performed to investigate the possibilities of connecting the 640-MW off-shore wind power farm, planned for Kriegers Flak 30 km south of Trelleborg, to the E.ON 130-kV subtransmission system. The Kriegers Flak commissioning is planned for 2010. The aim of this study is to answer the question if such a connection is possible, and under what conditions; it is not meant as a design project. Following a general connection design discussion, the study comprises of three major parts: fault current calculations, load flow calculations, and dynamic simulations. The study shows that it is possible to connect such a large off-shore wind power farm to the 130-kV subtransmission system, but reinforcement concerning load currents during normal operation and fault currents have to be made</abstract><cop>New York</cop><pub>IEEE</pub><doi>10.1109/TEC.2006.889545</doi><tpages>7</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0885-8969 |
ispartof | IEEE transactions on energy conversion, 2007-03, Vol.22 (1), p.79-85 |
issn | 0885-8969 1558-0059 |
language | eng |
recordid | cdi_proquest_miscellaneous_34594863 |
source | IEEE Xplore (Online service) |
subjects | Design engineering Dynamics Fault currents Grid code grid wind power connection grid wind power interaction Joining processes Joints Large-scale systems Load flow Mathematical analysis Mesh generation off-shore Offshore engineering Offshore structures Power generation Power system stability Wind energy Wind energy generation Wind power Wind power generation |
title | Kriegers Flak 640 MW Off-Shore Wind Power Grid Connection-A Real Project Case Study |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T03%3A10%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_ieee_&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Kriegers%20Flak%20640%20MW%20Off-Shore%20Wind%20Power%20Grid%20Connection-A%20Real%20Project%20Case%20Study&rft.jtitle=IEEE%20transactions%20on%20energy%20conversion&rft.au=Andersson,%20D.&rft.date=2007-03-01&rft.volume=22&rft.issue=1&rft.spage=79&rft.epage=85&rft.pages=79-85&rft.issn=0885-8969&rft.eissn=1558-0059&rft.coden=ITCNE4&rft_id=info:doi/10.1109/TEC.2006.889545&rft_dat=%3Cproquest_ieee_%3E20762773%3C/proquest_ieee_%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c415t-54b48f4af53d8e91c9641df16886b1b54b931be47694878092afb1c5e0900dc33%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=864746682&rft_id=info:pmid/&rft_ieee_id=4105992&rfr_iscdi=true |