Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems
Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate...
Saved in:
Published in: | International journal of electrical power & energy systems 2009-11, Vol.31 (10), p.626-638 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period, for which Bender’s decomposition technique is used. The objective of the GENCO is to maximize profit or to minimize loss in profit, for which transmission constrained price based unit commitment (TCPBUC), based on Lagrangian relaxation method is used. Bender’s decomposition technique is used for line maintenance, with adequate level of reliability. A coordinating technique using penalty factors is incorporated to obtain convergence of the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Detailed case studies of six-bus systems and IEEE RTS system are presented and discussed. |
---|---|
ISSN: | 0142-0615 1879-3517 |
DOI: | 10.1016/j.ijepes.2009.06.006 |