Loading…
Improved Highway–Railway Interface for the Preempt Trap
Railroad preemption is intended to improve safety at highway–railway intersections by minimizing the likelihood that a vehicle will become trapped on the crossing. However, unless sufficient time is provided to transfer right-of-way safely from the currently operating highway traffic phase, preempti...
Saved in:
Published in: | Transportation research record 2008-01, Vol.2080 (1), p.1-7 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | cdi_FETCH-LOGICAL-c313t-38afb53cb7cab2d225633758bcb096563663ddae416d5d6090499b510ca98f4b3 |
---|---|
cites | cdi_FETCH-LOGICAL-c313t-38afb53cb7cab2d225633758bcb096563663ddae416d5d6090499b510ca98f4b3 |
container_end_page | 7 |
container_issue | 1 |
container_start_page | 1 |
container_title | Transportation research record |
container_volume | 2080 |
creator | Sun, Xiaoli Urbanik, Tom Skehan, Sean Ablett, Matt |
description | Railroad preemption is intended to improve safety at highway–railway intersections by minimizing the likelihood that a vehicle will become trapped on the crossing. However, unless sufficient time is provided to transfer right-of-way safely from the currently operating highway traffic phase, preemption can cause safety problems for highway users. Advance preemption has been used to address right-of-way transfer time issues without making the railroad warning time excessively long. The use of advance preemption without proper precautions can lead to the preempt trap. A new approach that uses improved communication has been developed and implemented to address the needs of all users at and near the highway–railway intersection. The results of a field implementation in Los Angeles, California, demonstrate the effectiveness of the new approach. |
doi_str_mv | 10.3141/2080-01 |
format | article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_35489028</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.3141_2080-01</sage_id><sourcerecordid>35489028</sourcerecordid><originalsourceid>FETCH-LOGICAL-c313t-38afb53cb7cab2d225633758bcb096563663ddae416d5d6090499b510ca98f4b3</originalsourceid><addsrcrecordid>eNplkM1Kw0AUhQd_wFqLr5CF6Cp6b24ymVlKUVsoKFLXw2QyaVOSJs6kSne-g2_ok5gSd67uufBxOOcwdolwSxjjXQQCQsAjNoqQyzCGJDpmE5kKIJAgSSCesBEQxxClwDN27v0GgChOacTkvG5d82HzYFau1p96__P1_arLqlfBfNtZV2hjg6JxQbe2wYuztm67YOl0e8FOC115O_m7Y_b2-LCczsLF89N8er8IDSF1IQldZAmZLDU6i_IoSjhRmojMZCB5_3BOea5tjDxPct5HjqXMEgSjpSjijMbsevDtc77vrO9UXXpjq0pvbbPzipJYSIhED94MoHGN984WqnVlrd1eIajDVOowlQLsyauB9Hpl1abZuW3f4B_2C3FiYy4</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>35489028</pqid></control><display><type>article</type><title>Improved Highway–Railway Interface for the Preempt Trap</title><source>SAGE:Jisc Collections:SAGE Journals Read and Publish 2023-2024:2025 extension (reading list)</source><creator>Sun, Xiaoli ; Urbanik, Tom ; Skehan, Sean ; Ablett, Matt</creator><creatorcontrib>Sun, Xiaoli ; Urbanik, Tom ; Skehan, Sean ; Ablett, Matt</creatorcontrib><description>Railroad preemption is intended to improve safety at highway–railway intersections by minimizing the likelihood that a vehicle will become trapped on the crossing. However, unless sufficient time is provided to transfer right-of-way safely from the currently operating highway traffic phase, preemption can cause safety problems for highway users. Advance preemption has been used to address right-of-way transfer time issues without making the railroad warning time excessively long. The use of advance preemption without proper precautions can lead to the preempt trap. A new approach that uses improved communication has been developed and implemented to address the needs of all users at and near the highway–railway intersection. The results of a field implementation in Los Angeles, California, demonstrate the effectiveness of the new approach.</description><identifier>ISSN: 0361-1981</identifier><identifier>ISBN: 9780309093811</identifier><identifier>ISBN: 0309093813</identifier><identifier>EISSN: 2169-4052</identifier><identifier>DOI: 10.3141/2080-01</identifier><language>eng</language><publisher>Los Angeles, CA: SAGE Publications</publisher><ispartof>Transportation research record, 2008-01, Vol.2080 (1), p.1-7</ispartof><rights>2008 National Academy of Sciences</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c313t-38afb53cb7cab2d225633758bcb096563663ddae416d5d6090499b510ca98f4b3</citedby><cites>FETCH-LOGICAL-c313t-38afb53cb7cab2d225633758bcb096563663ddae416d5d6090499b510ca98f4b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27898,27899</link.rule.ids></links><search><creatorcontrib>Sun, Xiaoli</creatorcontrib><creatorcontrib>Urbanik, Tom</creatorcontrib><creatorcontrib>Skehan, Sean</creatorcontrib><creatorcontrib>Ablett, Matt</creatorcontrib><title>Improved Highway–Railway Interface for the Preempt Trap</title><title>Transportation research record</title><description>Railroad preemption is intended to improve safety at highway–railway intersections by minimizing the likelihood that a vehicle will become trapped on the crossing. However, unless sufficient time is provided to transfer right-of-way safely from the currently operating highway traffic phase, preemption can cause safety problems for highway users. Advance preemption has been used to address right-of-way transfer time issues without making the railroad warning time excessively long. The use of advance preemption without proper precautions can lead to the preempt trap. A new approach that uses improved communication has been developed and implemented to address the needs of all users at and near the highway–railway intersection. The results of a field implementation in Los Angeles, California, demonstrate the effectiveness of the new approach.</description><issn>0361-1981</issn><issn>2169-4052</issn><isbn>9780309093811</isbn><isbn>0309093813</isbn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2008</creationdate><recordtype>article</recordtype><recordid>eNplkM1Kw0AUhQd_wFqLr5CF6Cp6b24ymVlKUVsoKFLXw2QyaVOSJs6kSne-g2_ok5gSd67uufBxOOcwdolwSxjjXQQCQsAjNoqQyzCGJDpmE5kKIJAgSSCesBEQxxClwDN27v0GgChOacTkvG5d82HzYFau1p96__P1_arLqlfBfNtZV2hjg6JxQbe2wYuztm67YOl0e8FOC115O_m7Y_b2-LCczsLF89N8er8IDSF1IQldZAmZLDU6i_IoSjhRmojMZCB5_3BOea5tjDxPct5HjqXMEgSjpSjijMbsevDtc77vrO9UXXpjq0pvbbPzipJYSIhED94MoHGN984WqnVlrd1eIajDVOowlQLsyauB9Hpl1abZuW3f4B_2C3FiYy4</recordid><startdate>200801</startdate><enddate>200801</enddate><creator>Sun, Xiaoli</creator><creator>Urbanik, Tom</creator><creator>Skehan, Sean</creator><creator>Ablett, Matt</creator><general>SAGE Publications</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>200801</creationdate><title>Improved Highway–Railway Interface for the Preempt Trap</title><author>Sun, Xiaoli ; Urbanik, Tom ; Skehan, Sean ; Ablett, Matt</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c313t-38afb53cb7cab2d225633758bcb096563663ddae416d5d6090499b510ca98f4b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2008</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Sun, Xiaoli</creatorcontrib><creatorcontrib>Urbanik, Tom</creatorcontrib><creatorcontrib>Skehan, Sean</creatorcontrib><creatorcontrib>Ablett, Matt</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Transportation research record</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Sun, Xiaoli</au><au>Urbanik, Tom</au><au>Skehan, Sean</au><au>Ablett, Matt</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Improved Highway–Railway Interface for the Preempt Trap</atitle><jtitle>Transportation research record</jtitle><date>2008-01</date><risdate>2008</risdate><volume>2080</volume><issue>1</issue><spage>1</spage><epage>7</epage><pages>1-7</pages><issn>0361-1981</issn><eissn>2169-4052</eissn><isbn>9780309093811</isbn><isbn>0309093813</isbn><abstract>Railroad preemption is intended to improve safety at highway–railway intersections by minimizing the likelihood that a vehicle will become trapped on the crossing. However, unless sufficient time is provided to transfer right-of-way safely from the currently operating highway traffic phase, preemption can cause safety problems for highway users. Advance preemption has been used to address right-of-way transfer time issues without making the railroad warning time excessively long. The use of advance preemption without proper precautions can lead to the preempt trap. A new approach that uses improved communication has been developed and implemented to address the needs of all users at and near the highway–railway intersection. The results of a field implementation in Los Angeles, California, demonstrate the effectiveness of the new approach.</abstract><cop>Los Angeles, CA</cop><pub>SAGE Publications</pub><doi>10.3141/2080-01</doi><tpages>7</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0361-1981 |
ispartof | Transportation research record, 2008-01, Vol.2080 (1), p.1-7 |
issn | 0361-1981 2169-4052 |
language | eng |
recordid | cdi_proquest_miscellaneous_35489028 |
source | SAGE:Jisc Collections:SAGE Journals Read and Publish 2023-2024:2025 extension (reading list) |
title | Improved Highway–Railway Interface for the Preempt Trap |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-25T23%3A11%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Improved%20Highway%E2%80%93Railway%20Interface%20for%20the%20Preempt%20Trap&rft.jtitle=Transportation%20research%20record&rft.au=Sun,%20Xiaoli&rft.date=2008-01&rft.volume=2080&rft.issue=1&rft.spage=1&rft.epage=7&rft.pages=1-7&rft.issn=0361-1981&rft.eissn=2169-4052&rft.isbn=9780309093811&rft.isbn_list=0309093813&rft_id=info:doi/10.3141/2080-01&rft_dat=%3Cproquest_cross%3E35489028%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c313t-38afb53cb7cab2d225633758bcb096563663ddae416d5d6090499b510ca98f4b3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=35489028&rft_id=info:pmid/&rft_sage_id=10.3141_2080-01&rfr_iscdi=true |