Process plants deal with hazardous (highly flammable and toxic) chemicals at extreme conditions of temperature and pressure. Proper inspection and maintenance of these facilities is paramount for the maintenance of safe and continuous operation. This article proposes a risk‐based methodology for int...

Full description

Saved in:
Bibliographic Details
Published in:Risk analysis 2006-02, Vol.26 (1), p.203-221
Main Authors: Khan, Faisal I., Haddara, Mahmoud M., Bhattacharya, Subrata K.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c4945-a077e76db4e2ff294cbce3ab4a49c9a8cca23194e37351d13a79ad599b835fa83
cites cdi_FETCH-LOGICAL-c4945-a077e76db4e2ff294cbce3ab4a49c9a8cca23194e37351d13a79ad599b835fa83
container_end_page 221
container_issue 1
container_start_page 203
container_title Risk analysis
container_volume 26
creator Khan, Faisal I.
Haddara, Mahmoud M.
Bhattacharya, Subrata K.
description Process plants deal with hazardous (highly flammable and toxic) chemicals at extreme conditions of temperature and pressure. Proper inspection and maintenance of these facilities is paramount for the maintenance of safe and continuous operation. This article proposes a risk‐based methodology for integrity and inspection modeling (RBIIM) to ensure safe and fault‐free operation of the facility. This methodology uses a gamma distribution to model the material degradation and a Bayesian updating method to improve the distribution based on actual inspection results. The method deals with the two cases of perfect and imperfect inspections. The measurement error resulting from imperfect inspections is modeled as a zero‐mean, normally distributed random process. The risk is calculated using the probability of failure and the consequence is assessed in terms of cost as a function of time. The risk function is used to determine an optimal inspection and replacement interval. The calculated inspection and replacement interval is subsequently used in the design of an integrity inspection plan. Two case studies are presented: the maintenance of an autoclave and the maintenance of a pipeline segment. For the autoclave, the interval between two successive inspections is found to be 19 years. For the pipeline, the next inspection is due after 5 years from now. Measurements taken at inspections are used in estimating a new degradation rate that can then be used to update the failure distribution function.
doi_str_mv 10.1111/j.1539-6924.2006.00705.x
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_36528723</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>36528723</sourcerecordid><originalsourceid>FETCH-LOGICAL-c4945-a077e76db4e2ff294cbce3ab4a49c9a8cca23194e37351d13a79ad599b835fa83</originalsourceid><addsrcrecordid>eNqNkU9v0zAYhy0EYt3gK6CIA9oOyfwvdnzgsBU2InUDuiGOluO8mdIlcbFT0X57HFoNiQv48try8_tJrx6EEoIzEs_5KiM5U6lQlGcUY5FhLHGebZ-h2dPHczTDVNKUM0aP0HEIK4wJxrl8iY6I4IoSxWbo67INj-mlCVAn5TDCg2_HXWKG6RXWYMfWDcmNq6Frh4fkdHlZljdniWuSL95ZCCGZu37tBhjGcH63CyP0r9CLxnQBXh_mCfp29fF-_ildfL4u5xeL1HLF89RgKUGKuuJAm4YqbisLzFTccGWVKaw1lBHFgUmWk5owI5Wpc6WqguWNKdgJerfvXXv3YwNh1H0bLHSdGcBtgmYip4Wk7J8gxZKogogIvv0LXLmNH-ISEyMKTLmKULGHrHcheGj02re98TtNsJ7k6JWeHOjJgZ7k6N9y9DZG3xz6N1UP9Z_gwUYE3u-Bn20Hu_8u1svy7iLeYj7d59soYvuUN_5RC8lkrr_fXmvygd1icbXQ9-wX7Oyq5A</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>207680249</pqid></control><display><type>article</type><title>Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System</title><source>EBSCOhost Business Source Ultimate</source><source>International Bibliography of the Social Sciences (IBSS)</source><source>Wiley</source><source>SPORTDiscus with Full Text</source><creator>Khan, Faisal I. ; Haddara, Mahmoud M. ; Bhattacharya, Subrata K.</creator><creatorcontrib>Khan, Faisal I. ; Haddara, Mahmoud M. ; Bhattacharya, Subrata K.</creatorcontrib><description>Process plants deal with hazardous (highly flammable and toxic) chemicals at extreme conditions of temperature and pressure. Proper inspection and maintenance of these facilities is paramount for the maintenance of safe and continuous operation. This article proposes a risk‐based methodology for integrity and inspection modeling (RBIIM) to ensure safe and fault‐free operation of the facility. This methodology uses a gamma distribution to model the material degradation and a Bayesian updating method to improve the distribution based on actual inspection results. The method deals with the two cases of perfect and imperfect inspections. The measurement error resulting from imperfect inspections is modeled as a zero‐mean, normally distributed random process. The risk is calculated using the probability of failure and the consequence is assessed in terms of cost as a function of time. The risk function is used to determine an optimal inspection and replacement interval. The calculated inspection and replacement interval is subsequently used in the design of an integrity inspection plan. Two case studies are presented: the maintenance of an autoclave and the maintenance of a pipeline segment. For the autoclave, the interval between two successive inspections is found to be 19 years. For the pipeline, the next inspection is due after 5 years from now. Measurements taken at inspections are used in estimating a new degradation rate that can then be used to update the failure distribution function.</description><identifier>ISSN: 0272-4332</identifier><identifier>EISSN: 1539-6924</identifier><identifier>DOI: 10.1111/j.1539-6924.2006.00705.x</identifier><identifier>PMID: 16492193</identifier><language>eng</language><publisher>350 Main Street , Malden , MA 02148 , USA , and 9600 Garsington Road , Oxford OX4 2DQ , UK: Blackwell Publishing, Inc</publisher><subject>Chemicals ; Evaluation ; Factories ; Failure ; Failure modeling ; Hazardous materials ; Health risk assessment ; Industrial equipment ; Industrial plants ; Inspections ; integrity assessment and evaluation ; Methodology ; Methods ; Occupational safety ; Probability ; quantitative risk assessment ; Risk ; risk-based inspection ; risk-based maintenance</subject><ispartof>Risk analysis, 2006-02, Vol.26 (1), p.203-221</ispartof><rights>2006 The Society for Risk Analysis</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c4945-a077e76db4e2ff294cbce3ab4a49c9a8cca23194e37351d13a79ad599b835fa83</citedby><cites>FETCH-LOGICAL-c4945-a077e76db4e2ff294cbce3ab4a49c9a8cca23194e37351d13a79ad599b835fa83</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902,33200,33201</link.rule.ids><backlink>$$Uhttps://www.ncbi.nlm.nih.gov/pubmed/16492193$$D View this record in MEDLINE/PubMed$$Hfree_for_read</backlink></links><search><creatorcontrib>Khan, Faisal I.</creatorcontrib><creatorcontrib>Haddara, Mahmoud M.</creatorcontrib><creatorcontrib>Bhattacharya, Subrata K.</creatorcontrib><title>Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System</title><title>Risk analysis</title><addtitle>Risk Anal</addtitle><description>Process plants deal with hazardous (highly flammable and toxic) chemicals at extreme conditions of temperature and pressure. Proper inspection and maintenance of these facilities is paramount for the maintenance of safe and continuous operation. This article proposes a risk‐based methodology for integrity and inspection modeling (RBIIM) to ensure safe and fault‐free operation of the facility. This methodology uses a gamma distribution to model the material degradation and a Bayesian updating method to improve the distribution based on actual inspection results. The method deals with the two cases of perfect and imperfect inspections. The measurement error resulting from imperfect inspections is modeled as a zero‐mean, normally distributed random process. The risk is calculated using the probability of failure and the consequence is assessed in terms of cost as a function of time. The risk function is used to determine an optimal inspection and replacement interval. The calculated inspection and replacement interval is subsequently used in the design of an integrity inspection plan. Two case studies are presented: the maintenance of an autoclave and the maintenance of a pipeline segment. For the autoclave, the interval between two successive inspections is found to be 19 years. For the pipeline, the next inspection is due after 5 years from now. Measurements taken at inspections are used in estimating a new degradation rate that can then be used to update the failure distribution function.</description><subject>Chemicals</subject><subject>Evaluation</subject><subject>Factories</subject><subject>Failure</subject><subject>Failure modeling</subject><subject>Hazardous materials</subject><subject>Health risk assessment</subject><subject>Industrial equipment</subject><subject>Industrial plants</subject><subject>Inspections</subject><subject>integrity assessment and evaluation</subject><subject>Methodology</subject><subject>Methods</subject><subject>Occupational safety</subject><subject>Probability</subject><subject>quantitative risk assessment</subject><subject>Risk</subject><subject>risk-based inspection</subject><subject>risk-based maintenance</subject><issn>0272-4332</issn><issn>1539-6924</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2006</creationdate><recordtype>article</recordtype><sourceid>8BJ</sourceid><recordid>eNqNkU9v0zAYhy0EYt3gK6CIA9oOyfwvdnzgsBU2InUDuiGOluO8mdIlcbFT0X57HFoNiQv48try8_tJrx6EEoIzEs_5KiM5U6lQlGcUY5FhLHGebZ-h2dPHczTDVNKUM0aP0HEIK4wJxrl8iY6I4IoSxWbo67INj-mlCVAn5TDCg2_HXWKG6RXWYMfWDcmNq6Frh4fkdHlZljdniWuSL95ZCCGZu37tBhjGcH63CyP0r9CLxnQBXh_mCfp29fF-_ildfL4u5xeL1HLF89RgKUGKuuJAm4YqbisLzFTccGWVKaw1lBHFgUmWk5owI5Wpc6WqguWNKdgJerfvXXv3YwNh1H0bLHSdGcBtgmYip4Wk7J8gxZKogogIvv0LXLmNH-ISEyMKTLmKULGHrHcheGj02re98TtNsJ7k6JWeHOjJgZ7k6N9y9DZG3xz6N1UP9Z_gwUYE3u-Bn20Hu_8u1svy7iLeYj7d59soYvuUN_5RC8lkrr_fXmvygd1icbXQ9-wX7Oyq5A</recordid><startdate>200602</startdate><enddate>200602</enddate><creator>Khan, Faisal I.</creator><creator>Haddara, Mahmoud M.</creator><creator>Bhattacharya, Subrata K.</creator><general>Blackwell Publishing, Inc</general><general>Blackwell Publishing Ltd</general><scope>BSCLL</scope><scope>NPM</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7ST</scope><scope>7U7</scope><scope>7U9</scope><scope>8BJ</scope><scope>8FD</scope><scope>C1K</scope><scope>FQK</scope><scope>FR3</scope><scope>H94</scope><scope>JBE</scope><scope>JQ2</scope><scope>KR7</scope><scope>M7N</scope><scope>SOI</scope><scope>7U1</scope><scope>7U2</scope></search><sort><creationdate>200602</creationdate><title>Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System</title><author>Khan, Faisal I. ; Haddara, Mahmoud M. ; Bhattacharya, Subrata K.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c4945-a077e76db4e2ff294cbce3ab4a49c9a8cca23194e37351d13a79ad599b835fa83</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2006</creationdate><topic>Chemicals</topic><topic>Evaluation</topic><topic>Factories</topic><topic>Failure</topic><topic>Failure modeling</topic><topic>Hazardous materials</topic><topic>Health risk assessment</topic><topic>Industrial equipment</topic><topic>Industrial plants</topic><topic>Inspections</topic><topic>integrity assessment and evaluation</topic><topic>Methodology</topic><topic>Methods</topic><topic>Occupational safety</topic><topic>Probability</topic><topic>quantitative risk assessment</topic><topic>Risk</topic><topic>risk-based inspection</topic><topic>risk-based maintenance</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Khan, Faisal I.</creatorcontrib><creatorcontrib>Haddara, Mahmoud M.</creatorcontrib><creatorcontrib>Bhattacharya, Subrata K.</creatorcontrib><collection>Istex</collection><collection>PubMed</collection><collection>CrossRef</collection><collection>Environment Abstracts</collection><collection>Toxicology Abstracts</collection><collection>Virology and AIDS Abstracts</collection><collection>International Bibliography of the Social Sciences (IBSS)</collection><collection>Technology Research Database</collection><collection>Environmental Sciences and Pollution Management</collection><collection>International Bibliography of the Social Sciences</collection><collection>Engineering Research Database</collection><collection>AIDS and Cancer Research Abstracts</collection><collection>International Bibliography of the Social Sciences</collection><collection>ProQuest Computer Science Collection</collection><collection>Civil Engineering Abstracts</collection><collection>Algology Mycology and Protozoology Abstracts (Microbiology C)</collection><collection>Environment Abstracts</collection><collection>Risk Abstracts</collection><collection>Safety Science and Risk</collection><jtitle>Risk analysis</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Khan, Faisal I.</au><au>Haddara, Mahmoud M.</au><au>Bhattacharya, Subrata K.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System</atitle><jtitle>Risk analysis</jtitle><addtitle>Risk Anal</addtitle><date>2006-02</date><risdate>2006</risdate><volume>26</volume><issue>1</issue><spage>203</spage><epage>221</epage><pages>203-221</pages><issn>0272-4332</issn><eissn>1539-6924</eissn><abstract>Process plants deal with hazardous (highly flammable and toxic) chemicals at extreme conditions of temperature and pressure. Proper inspection and maintenance of these facilities is paramount for the maintenance of safe and continuous operation. This article proposes a risk‐based methodology for integrity and inspection modeling (RBIIM) to ensure safe and fault‐free operation of the facility. This methodology uses a gamma distribution to model the material degradation and a Bayesian updating method to improve the distribution based on actual inspection results. The method deals with the two cases of perfect and imperfect inspections. The measurement error resulting from imperfect inspections is modeled as a zero‐mean, normally distributed random process. The risk is calculated using the probability of failure and the consequence is assessed in terms of cost as a function of time. The risk function is used to determine an optimal inspection and replacement interval. The calculated inspection and replacement interval is subsequently used in the design of an integrity inspection plan. Two case studies are presented: the maintenance of an autoclave and the maintenance of a pipeline segment. For the autoclave, the interval between two successive inspections is found to be 19 years. For the pipeline, the next inspection is due after 5 years from now. Measurements taken at inspections are used in estimating a new degradation rate that can then be used to update the failure distribution function.</abstract><cop>350 Main Street , Malden , MA 02148 , USA , and 9600 Garsington Road , Oxford OX4 2DQ , UK</cop><pub>Blackwell Publishing, Inc</pub><pmid>16492193</pmid><doi>10.1111/j.1539-6924.2006.00705.x</doi><tpages>19</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0272-4332
ispartof Risk analysis, 2006-02, Vol.26 (1), p.203-221
issn 0272-4332
1539-6924
language eng
recordid cdi_proquest_miscellaneous_36528723
source EBSCOhost Business Source Ultimate; International Bibliography of the Social Sciences (IBSS); Wiley; SPORTDiscus with Full Text
subjects Chemicals
Evaluation
Factories
Failure
Failure modeling
Hazardous materials
Health risk assessment
Industrial equipment
Industrial plants
Inspections
integrity assessment and evaluation
Methodology
Methods
Occupational safety
Probability
quantitative risk assessment
Risk
risk-based inspection
risk-based maintenance
title Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T01%3A49%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Risk-Based%20Integrity%20and%20Inspection%20Modeling%20(RBIIM)%20of%20Process%20Components/System&rft.jtitle=Risk%20analysis&rft.au=Khan,%20Faisal%20I.&rft.date=2006-02&rft.volume=26&rft.issue=1&rft.spage=203&rft.epage=221&rft.pages=203-221&rft.issn=0272-4332&rft.eissn=1539-6924&rft_id=info:doi/10.1111/j.1539-6924.2006.00705.x&rft_dat=%3Cproquest_cross%3E36528723%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c4945-a077e76db4e2ff294cbce3ab4a49c9a8cca23194e37351d13a79ad599b835fa83%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=207680249&rft_id=info:pmid/16492193&rfr_iscdi=true