Loading…
Sampling for Collection of Central Line–Day Denominators in Surveillance of Healthcare‐Associated Bloodstream Infections
To determine the feasibility of estimating the number of central line-days at a hospital from a sample of months or individual days in a year, for surveillance of healthcare-associated bloodstream infections. We used data reported to the National Nosocomial Infections Surveillance system in the adul...
Saved in:
Published in: | Infection control and hospital epidemiology 2006-04, Vol.27 (4), p.338-342 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | To determine the feasibility of estimating the number of central line-days at a hospital from a sample of months or individual days in a year, for surveillance of healthcare-associated bloodstream infections.
We used data reported to the National Nosocomial Infections Surveillance system in the adult and pediatric intensive care unit component for 1995-2003 and data from a sample of hospitals' daily counts of device use for 12 consecutive months. We calculated the percentile error as the central line-associated bloodstream infection percentile based on rates per line-days minus the percentile based on rates per estimated line-days.
A total of 247 hospitals were used for sampling whole months and 12 hospitals were used for sampling individual days.
For a 1-month sample of central line-days data, the median percentile error was 3.3 (75th percentile, 7.9; 90th percentile, 15.4). The percentile error decreased with an increase in the number of months sampled. For a 3-month sample, the median percentile error was 1.4 (75th percentile, 4.3; 95th percentile, 8.3). Sampling individual days throughout the year yielded lower percentile errors than sampling an equivalent fraction of whole months. With 1 weekday sampled per week, the median percentile error ranged from 0.65 to 1.40, and the 90th percentile ranged from 2.8 to 5.0. Thus, for 90% of units, collecting data on line-days once a week provides an estimate within +/-5 percentile points of the true line-day rate.
Sample-based estimates of central line-days can yield results that are acceptable for surveillance of healthcare-associated bloodstream infections. |
---|---|
ISSN: | 0899-823X 1559-6834 |
DOI: | 10.1086/503338 |