Loading…
Development and commissioning of decision support tools for sewerage management
Managing sewerage systems is a highly complex task due to the dynamic nature of the facilities. Their performance strongly depends on the know-how applied by the operators. In order to define optimal operational settings, two decision support tools based on mathematical models have been developed. M...
Saved in:
Published in: | Water science and technology 2006-01, Vol.53 (4-5), p.293-302 |
---|---|
Main Authors: | , , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Managing sewerage systems is a highly complex task due to the dynamic nature of the facilities. Their performance strongly depends on the know-how applied by the operators. In order to define optimal operational settings, two decision support tools based on mathematical models have been developed. Moreover, easy-to-use interfaces have been created as well, aiding operators who presumably do not have the necessary skills to use modelling software. The two developed programs simulate the behaviour of both wastewater treatment plants (WWTP) and sewer network systems, respectively. They have essentially the same structure, including raw data management and statistical analysis, a simulation layer using the application programming interface of the applied software and a layer responsible for the representation of the obtained results. Four user modes are provided in the two software including the simulation of historical data using the applied and novel operational settings, as well as modes concerning prediction of possible operation periods and updates. Concerning the WWTP software, it was successfully installed in Nantes (France) in June 2004. Moreover, the one managing sewer networks has been deployed in Saint-Malo (France) in January 2005. This paper presents the structure of the developed software and the first results obtained during the commissioning phase. |
---|---|
ISSN: | 0273-1223 1996-9732 |
DOI: | 10.2166/wst.2006.134 |