Loading…
Curing time effect on the fraction of (137)Cs from cement-ion exchange resins-bentonite clay composition
To assess the safety of disposal of radioactive waste material in cement, curing conditions and time of leaching radionuclides (137)Cs have been studied. Leaching tests in cement-ion exchange resins-bentonite matrix, were carried out in accordance with a method recommended by IAEA. Curing conditions...
Saved in:
Published in: | Épitőanyag 2009-04, Vol.61 (4), p.102-103 |
---|---|
Main Authors: | , |
Format: | Article |
Language: | Hungarian |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
cited_by | |
---|---|
cites | |
container_end_page | 103 |
container_issue | 4 |
container_start_page | 102 |
container_title | Épitőanyag |
container_volume | 61 |
creator | Plecas, I Dimovic, S |
description | To assess the safety of disposal of radioactive waste material in cement, curing conditions and time of leaching radionuclides (137)Cs have been studied. Leaching tests in cement-ion exchange resins-bentonite matrix, were carried out in accordance with a method recommended by IAEA. Curing conditions and curing time prior to commencing the leaching test are critically important in leach studies since the extent of hyd ration of the cement materials determines how much hydration product develops and whether it is available to block the pore network, thereby reducing leaching. Incremental leaching rates R(n)(cm/d) of (137)Cs from cement-ion exchange resins-bentonite matrix after 240 days were measured. The results presented in this paper are examples of results obtained in a 30-year concrete testing project which will influence the design of the engineer trenches system for future central Serbian radioactive waste storing center. |
format | article |
fullrecord | <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_miscellaneous_743659201</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>743659201</sourcerecordid><originalsourceid>FETCH-proquest_miscellaneous_7436592013</originalsourceid><addsrcrecordid>eNqNTksKwjAUzELBor3D26mLQvqzdF0UD-DCXYnhpY00Se1LQW9vCh7A2QzzYZgVizhP86Su-H3DYqInDyh4mmVlxPpmnrTtwGuDgEqh9OAs-B5BTUJ6HYRTcEjz6thQ8JwBiQatT5YI37IXtkOYkLSl5BECZ7VHkIP4gHRmdKSXlR1bKzEQxj_esv3lfGuuyTi514zkW6NJ4jAIi26mtiryU1ln4fn_zS9AgErb</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>743659201</pqid></control><display><type>article</type><title>Curing time effect on the fraction of (137)Cs from cement-ion exchange resins-bentonite clay composition</title><source>Alma/SFX Local Collection</source><creator>Plecas, I ; Dimovic, S</creator><creatorcontrib>Plecas, I ; Dimovic, S</creatorcontrib><description>To assess the safety of disposal of radioactive waste material in cement, curing conditions and time of leaching radionuclides (137)Cs have been studied. Leaching tests in cement-ion exchange resins-bentonite matrix, were carried out in accordance with a method recommended by IAEA. Curing conditions and curing time prior to commencing the leaching test are critically important in leach studies since the extent of hyd ration of the cement materials determines how much hydration product develops and whether it is available to block the pore network, thereby reducing leaching. Incremental leaching rates R(n)(cm/d) of (137)Cs from cement-ion exchange resins-bentonite matrix after 240 days were measured. The results presented in this paper are examples of results obtained in a 30-year concrete testing project which will influence the design of the engineer trenches system for future central Serbian radioactive waste storing center.</description><identifier>ISSN: 0013-970X</identifier><language>hun</language><ispartof>Épitőanyag, 2009-04, Vol.61 (4), p.102-103</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780</link.rule.ids></links><search><creatorcontrib>Plecas, I</creatorcontrib><creatorcontrib>Dimovic, S</creatorcontrib><title>Curing time effect on the fraction of (137)Cs from cement-ion exchange resins-bentonite clay composition</title><title>Épitőanyag</title><description>To assess the safety of disposal of radioactive waste material in cement, curing conditions and time of leaching radionuclides (137)Cs have been studied. Leaching tests in cement-ion exchange resins-bentonite matrix, were carried out in accordance with a method recommended by IAEA. Curing conditions and curing time prior to commencing the leaching test are critically important in leach studies since the extent of hyd ration of the cement materials determines how much hydration product develops and whether it is available to block the pore network, thereby reducing leaching. Incremental leaching rates R(n)(cm/d) of (137)Cs from cement-ion exchange resins-bentonite matrix after 240 days were measured. The results presented in this paper are examples of results obtained in a 30-year concrete testing project which will influence the design of the engineer trenches system for future central Serbian radioactive waste storing center.</description><issn>0013-970X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2009</creationdate><recordtype>article</recordtype><recordid>eNqNTksKwjAUzELBor3D26mLQvqzdF0UD-DCXYnhpY00Se1LQW9vCh7A2QzzYZgVizhP86Su-H3DYqInDyh4mmVlxPpmnrTtwGuDgEqh9OAs-B5BTUJ6HYRTcEjz6thQ8JwBiQatT5YI37IXtkOYkLSl5BECZ7VHkIP4gHRmdKSXlR1bKzEQxj_esv3lfGuuyTi514zkW6NJ4jAIi26mtiryU1ln4fn_zS9AgErb</recordid><startdate>20090401</startdate><enddate>20090401</enddate><creator>Plecas, I</creator><creator>Dimovic, S</creator><scope>7QQ</scope><scope>7SR</scope><scope>8FD</scope><scope>JG9</scope></search><sort><creationdate>20090401</creationdate><title>Curing time effect on the fraction of (137)Cs from cement-ion exchange resins-bentonite clay composition</title><author>Plecas, I ; Dimovic, S</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-proquest_miscellaneous_7436592013</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>hun</language><creationdate>2009</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Plecas, I</creatorcontrib><creatorcontrib>Dimovic, S</creatorcontrib><collection>Ceramic Abstracts</collection><collection>Engineered Materials Abstracts</collection><collection>Technology Research Database</collection><collection>Materials Research Database</collection><jtitle>Épitőanyag</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Plecas, I</au><au>Dimovic, S</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Curing time effect on the fraction of (137)Cs from cement-ion exchange resins-bentonite clay composition</atitle><jtitle>Épitőanyag</jtitle><date>2009-04-01</date><risdate>2009</risdate><volume>61</volume><issue>4</issue><spage>102</spage><epage>103</epage><pages>102-103</pages><issn>0013-970X</issn><abstract>To assess the safety of disposal of radioactive waste material in cement, curing conditions and time of leaching radionuclides (137)Cs have been studied. Leaching tests in cement-ion exchange resins-bentonite matrix, were carried out in accordance with a method recommended by IAEA. Curing conditions and curing time prior to commencing the leaching test are critically important in leach studies since the extent of hyd ration of the cement materials determines how much hydration product develops and whether it is available to block the pore network, thereby reducing leaching. Incremental leaching rates R(n)(cm/d) of (137)Cs from cement-ion exchange resins-bentonite matrix after 240 days were measured. The results presented in this paper are examples of results obtained in a 30-year concrete testing project which will influence the design of the engineer trenches system for future central Serbian radioactive waste storing center.</abstract></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0013-970X |
ispartof | Épitőanyag, 2009-04, Vol.61 (4), p.102-103 |
issn | 0013-970X |
language | hun |
recordid | cdi_proquest_miscellaneous_743659201 |
source | Alma/SFX Local Collection |
title | Curing time effect on the fraction of (137)Cs from cement-ion exchange resins-bentonite clay composition |
url | http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T18%3A17%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Curing%20time%20effect%20on%20the%20fraction%20of%20(137)Cs%20from%20cement-ion%20exchange%20resins-bentonite%20clay%20composition&rft.jtitle=%C3%89pit%C5%91anyag&rft.au=Plecas,%20I&rft.date=2009-04-01&rft.volume=61&rft.issue=4&rft.spage=102&rft.epage=103&rft.pages=102-103&rft.issn=0013-970X&rft_id=info:doi/&rft_dat=%3Cproquest%3E743659201%3C/proquest%3E%3Cgrp_id%3Ecdi_FETCH-proquest_miscellaneous_7436592013%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=743659201&rft_id=info:pmid/&rfr_iscdi=true |