Status of the ITER magnets

The first 2 years of the ITER IO has seen substantial progress towards the construction of the magnets, in three main areas. Firstly, the design has been developed under the conflicting constraints to minimise construction costs and to maximise plasma physics performance. Building construction momen...

Full description

Saved in:
Bibliographic Details
Published in:Fusion engineering and design 2009-06, Vol.84 (2), p.113-121
Main Authors: Mitchell, N., Bauer, P., Bessette, D., Devred, A., Gallix, R., Jong, C., Knaster, J., Libeyre, P., Lim, B., Sahu, A., Simon, F.
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by cdi_FETCH-LOGICAL-c377t-996a315eb8908d41004aa7d416923e6bbf575399ae78988a8541eff451eae0b83
cites cdi_FETCH-LOGICAL-c377t-996a315eb8908d41004aa7d416923e6bbf575399ae78988a8541eff451eae0b83
container_end_page 121
container_issue 2
container_start_page 113
container_title Fusion engineering and design
container_volume 84
creator Mitchell, N.
Bauer, P.
Bessette, D.
Devred, A.
Gallix, R.
Jong, C.
Knaster, J.
Libeyre, P.
Lim, B.
Sahu, A.
Simon, F.
description The first 2 years of the ITER IO has seen substantial progress towards the construction of the magnets, in three main areas. Firstly, the design has been developed under the conflicting constraints to minimise construction costs and to maximise plasma physics performance. Building construction momentum while updating the design to take account of new physics assessments of the coil requirements has been challenging. Secondly, with a stabilising design, it has been possible for the Domestic Agencies to launch the first industrial procurement contracts. And thirdly, critical R&D to confirm the performance of the Nb3Sn cable in conduit design is proceeding successfully. The design consolidation has been accompanied by design reviews involving the international community. The reviews conducted by magnet experts have enabled a consensus to be built on choosing between some of the design options in the original ITER basic design in 2001. The major design decisions were to maintain the circular Nb 3Sn conductor embedded in radial plates for the toroidal field (TF) coils and to maintain NbTi-based conductors for the PF coils. Cold testing, at low current, is also being introduced for quality control purposes for all coils.
doi_str_mv 10.1016/j.fusengdes.2009.01.006
format article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_753742877</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0920379609000301</els_id><sourcerecordid>753742877</sourcerecordid><originalsourceid>FETCH-LOGICAL-c377t-996a315eb8908d41004aa7d416923e6bbf575399ae78988a8541eff451eae0b83</originalsourceid><addsrcrecordid>eNqFkN9LwzAQx4MoOKf_gC_2RXxqvTRtkzyO4Y_BQND5HNL0Mju6diap4H9vxsZehYO7h8_3jvsQckcho0Crx01mR4_9ukGf5QAyA5oBVGdkQgVnKaeyOicTkDmkjMvqklx5vwGgPNaE3H4EHUafDDYJX5gsVk_vyVavewz-mlxY3Xm8OfYp-Xx-Ws1f0-Xby2I-W6aGcR5SKSvNaIm1kCCaggIUWvM4VDJnWNW1LXnJpNTIhRRCi7KgaG1RUtQItWBT8nDYu3PD94g-qG3rDXad7nEYvYppXuSC80jyA2nc4L1Dq3au3Wr3qyiovQy1UScZai9DAVVRRkzeH29ob3Rnne5N60_xnMqclgwiNztwGB_-adEpb1rsDTatQxNUM7T_3voD1n92rw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>753742877</pqid></control><display><type>article</type><title>Status of the ITER magnets</title><source>ScienceDirect Freedom Collection</source><creator>Mitchell, N. ; Bauer, P. ; Bessette, D. ; Devred, A. ; Gallix, R. ; Jong, C. ; Knaster, J. ; Libeyre, P. ; Lim, B. ; Sahu, A. ; Simon, F.</creator><creatorcontrib>Mitchell, N. ; Bauer, P. ; Bessette, D. ; Devred, A. ; Gallix, R. ; Jong, C. ; Knaster, J. ; Libeyre, P. ; Lim, B. ; Sahu, A. ; Simon, F.</creatorcontrib><description>The first 2 years of the ITER IO has seen substantial progress towards the construction of the magnets, in three main areas. Firstly, the design has been developed under the conflicting constraints to minimise construction costs and to maximise plasma physics performance. Building construction momentum while updating the design to take account of new physics assessments of the coil requirements has been challenging. Secondly, with a stabilising design, it has been possible for the Domestic Agencies to launch the first industrial procurement contracts. And thirdly, critical R&amp;D to confirm the performance of the Nb3Sn cable in conduit design is proceeding successfully. The design consolidation has been accompanied by design reviews involving the international community. The reviews conducted by magnet experts have enabled a consensus to be built on choosing between some of the design options in the original ITER basic design in 2001. The major design decisions were to maintain the circular Nb 3Sn conductor embedded in radial plates for the toroidal field (TF) coils and to maintain NbTi-based conductors for the PF coils. Cold testing, at low current, is also being introduced for quality control purposes for all coils.</description><identifier>ISSN: 0920-3796</identifier><identifier>EISSN: 1873-7196</identifier><identifier>DOI: 10.1016/j.fusengdes.2009.01.006</identifier><identifier>CODEN: FEDEEE</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Applied sciences ; Assessments ; Coiling ; Conductors (devices) ; Construction costs ; Controled nuclear fusion plants ; Decisions ; Energy ; Energy. Thermal use of fuels ; Exact sciences and technology ; Installations for energy generation and conversion: thermal and electrical energy ; ITER ; Launches ; Magnets ; Procurement contracts ; Status ; Superconducting magnets</subject><ispartof>Fusion engineering and design, 2009-06, Vol.84 (2), p.113-121</ispartof><rights>2009 Elsevier B.V.</rights><rights>2009 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c377t-996a315eb8908d41004aa7d416923e6bbf575399ae78988a8541eff451eae0b83</citedby><cites>FETCH-LOGICAL-c377t-996a315eb8908d41004aa7d416923e6bbf575399ae78988a8541eff451eae0b83</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>309,310,314,776,780,785,786,23909,23910,25118,27901,27902</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&amp;idt=21921530$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Mitchell, N.</creatorcontrib><creatorcontrib>Bauer, P.</creatorcontrib><creatorcontrib>Bessette, D.</creatorcontrib><creatorcontrib>Devred, A.</creatorcontrib><creatorcontrib>Gallix, R.</creatorcontrib><creatorcontrib>Jong, C.</creatorcontrib><creatorcontrib>Knaster, J.</creatorcontrib><creatorcontrib>Libeyre, P.</creatorcontrib><creatorcontrib>Lim, B.</creatorcontrib><creatorcontrib>Sahu, A.</creatorcontrib><creatorcontrib>Simon, F.</creatorcontrib><title>Status of the ITER magnets</title><title>Fusion engineering and design</title><description>The first 2 years of the ITER IO has seen substantial progress towards the construction of the magnets, in three main areas. Firstly, the design has been developed under the conflicting constraints to minimise construction costs and to maximise plasma physics performance. Building construction momentum while updating the design to take account of new physics assessments of the coil requirements has been challenging. Secondly, with a stabilising design, it has been possible for the Domestic Agencies to launch the first industrial procurement contracts. And thirdly, critical R&amp;D to confirm the performance of the Nb3Sn cable in conduit design is proceeding successfully. The design consolidation has been accompanied by design reviews involving the international community. The reviews conducted by magnet experts have enabled a consensus to be built on choosing between some of the design options in the original ITER basic design in 2001. The major design decisions were to maintain the circular Nb 3Sn conductor embedded in radial plates for the toroidal field (TF) coils and to maintain NbTi-based conductors for the PF coils. Cold testing, at low current, is also being introduced for quality control purposes for all coils.</description><subject>Applied sciences</subject><subject>Assessments</subject><subject>Coiling</subject><subject>Conductors (devices)</subject><subject>Construction costs</subject><subject>Controled nuclear fusion plants</subject><subject>Decisions</subject><subject>Energy</subject><subject>Energy. Thermal use of fuels</subject><subject>Exact sciences and technology</subject><subject>Installations for energy generation and conversion: thermal and electrical energy</subject><subject>ITER</subject><subject>Launches</subject><subject>Magnets</subject><subject>Procurement contracts</subject><subject>Status</subject><subject>Superconducting magnets</subject><issn>0920-3796</issn><issn>1873-7196</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2009</creationdate><recordtype>article</recordtype><recordid>eNqFkN9LwzAQx4MoOKf_gC_2RXxqvTRtkzyO4Y_BQND5HNL0Mju6diap4H9vxsZehYO7h8_3jvsQckcho0Crx01mR4_9ukGf5QAyA5oBVGdkQgVnKaeyOicTkDmkjMvqklx5vwGgPNaE3H4EHUafDDYJX5gsVk_vyVavewz-mlxY3Xm8OfYp-Xx-Ws1f0-Xby2I-W6aGcR5SKSvNaIm1kCCaggIUWvM4VDJnWNW1LXnJpNTIhRRCi7KgaG1RUtQItWBT8nDYu3PD94g-qG3rDXad7nEYvYppXuSC80jyA2nc4L1Dq3au3Wr3qyiovQy1UScZai9DAVVRRkzeH29ob3Rnne5N60_xnMqclgwiNztwGB_-adEpb1rsDTatQxNUM7T_3voD1n92rw</recordid><startdate>20090601</startdate><enddate>20090601</enddate><creator>Mitchell, N.</creator><creator>Bauer, P.</creator><creator>Bessette, D.</creator><creator>Devred, A.</creator><creator>Gallix, R.</creator><creator>Jong, C.</creator><creator>Knaster, J.</creator><creator>Libeyre, P.</creator><creator>Lim, B.</creator><creator>Sahu, A.</creator><creator>Simon, F.</creator><general>Elsevier B.V</general><general>Elsevier</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7TB</scope><scope>7U5</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope><scope>L7M</scope></search><sort><creationdate>20090601</creationdate><title>Status of the ITER magnets</title><author>Mitchell, N. ; Bauer, P. ; Bessette, D. ; Devred, A. ; Gallix, R. ; Jong, C. ; Knaster, J. ; Libeyre, P. ; Lim, B. ; Sahu, A. ; Simon, F.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c377t-996a315eb8908d41004aa7d416923e6bbf575399ae78988a8541eff451eae0b83</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2009</creationdate><topic>Applied sciences</topic><topic>Assessments</topic><topic>Coiling</topic><topic>Conductors (devices)</topic><topic>Construction costs</topic><topic>Controled nuclear fusion plants</topic><topic>Decisions</topic><topic>Energy</topic><topic>Energy. Thermal use of fuels</topic><topic>Exact sciences and technology</topic><topic>Installations for energy generation and conversion: thermal and electrical energy</topic><topic>ITER</topic><topic>Launches</topic><topic>Magnets</topic><topic>Procurement contracts</topic><topic>Status</topic><topic>Superconducting magnets</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Mitchell, N.</creatorcontrib><creatorcontrib>Bauer, P.</creatorcontrib><creatorcontrib>Bessette, D.</creatorcontrib><creatorcontrib>Devred, A.</creatorcontrib><creatorcontrib>Gallix, R.</creatorcontrib><creatorcontrib>Jong, C.</creatorcontrib><creatorcontrib>Knaster, J.</creatorcontrib><creatorcontrib>Libeyre, P.</creatorcontrib><creatorcontrib>Lim, B.</creatorcontrib><creatorcontrib>Sahu, A.</creatorcontrib><creatorcontrib>Simon, F.</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Electronics &amp; Communications Abstracts</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Solid State and Superconductivity Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>Fusion engineering and design</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Mitchell, N.</au><au>Bauer, P.</au><au>Bessette, D.</au><au>Devred, A.</au><au>Gallix, R.</au><au>Jong, C.</au><au>Knaster, J.</au><au>Libeyre, P.</au><au>Lim, B.</au><au>Sahu, A.</au><au>Simon, F.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Status of the ITER magnets</atitle><jtitle>Fusion engineering and design</jtitle><date>2009-06-01</date><risdate>2009</risdate><volume>84</volume><issue>2</issue><spage>113</spage><epage>121</epage><pages>113-121</pages><issn>0920-3796</issn><eissn>1873-7196</eissn><coden>FEDEEE</coden><abstract>The first 2 years of the ITER IO has seen substantial progress towards the construction of the magnets, in three main areas. Firstly, the design has been developed under the conflicting constraints to minimise construction costs and to maximise plasma physics performance. Building construction momentum while updating the design to take account of new physics assessments of the coil requirements has been challenging. Secondly, with a stabilising design, it has been possible for the Domestic Agencies to launch the first industrial procurement contracts. And thirdly, critical R&amp;D to confirm the performance of the Nb3Sn cable in conduit design is proceeding successfully. The design consolidation has been accompanied by design reviews involving the international community. The reviews conducted by magnet experts have enabled a consensus to be built on choosing between some of the design options in the original ITER basic design in 2001. The major design decisions were to maintain the circular Nb 3Sn conductor embedded in radial plates for the toroidal field (TF) coils and to maintain NbTi-based conductors for the PF coils. Cold testing, at low current, is also being introduced for quality control purposes for all coils.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/j.fusengdes.2009.01.006</doi><tpages>9</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0920-3796
ispartof Fusion engineering and design, 2009-06, Vol.84 (2), p.113-121
issn 0920-3796
1873-7196
language eng
recordid cdi_proquest_miscellaneous_753742877
source ScienceDirect Freedom Collection
subjects Applied sciences
Assessments
Coiling
Conductors (devices)
Construction costs
Controled nuclear fusion plants
Decisions
Energy
Energy. Thermal use of fuels
Exact sciences and technology
Installations for energy generation and conversion: thermal and electrical energy
ITER
Launches
Magnets
Procurement contracts
Status
Superconducting magnets
title Status of the ITER magnets
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T23%3A32%3A59IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Status%20of%20the%20ITER%20magnets&rft.jtitle=Fusion%20engineering%20and%20design&rft.au=Mitchell,%20N.&rft.date=2009-06-01&rft.volume=84&rft.issue=2&rft.spage=113&rft.epage=121&rft.pages=113-121&rft.issn=0920-3796&rft.eissn=1873-7196&rft.coden=FEDEEE&rft_id=info:doi/10.1016/j.fusengdes.2009.01.006&rft_dat=%3Cproquest_cross%3E753742877%3C/proquest_cross%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c377t-996a315eb8908d41004aa7d416923e6bbf575399ae78988a8541eff451eae0b83%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=753742877&rft_id=info:pmid/&rfr_iscdi=true