Loading…
Save energy by integrating lighting controls, HVAC systems
[...]compensation strategies need to be investigated during planning to handle this possible occupant dissatisfier. [...]the mechanical system designer must take into consideration the time that the system will take to recover.
Saved in:
Published in: | Consulting - Specifying Engineer 2014-05, Vol.51 (4) |
---|---|
Main Author: | |
Format: | Magazinearticle |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | [...]compensation strategies need to be investigated during planning to handle this possible occupant dissatisfier. [...]the mechanical system designer must take into consideration the time that the system will take to recover. |
---|---|
ISSN: | 0892-5046 1558-2876 |