Loading…

Gold Bar Centre of Excellence

It also has a large pilot laboratory that provides a controlled and safe environment for testing procedures without risk to the effluent flowing from the plant into the North Saskatchewan River. The laboratory has a permanent dual train BNR pilot plant which occupies about 30 per cent of the space....

Full description

Saved in:
Bibliographic Details
Published in:Canadian Consulting Engineer 2005-06, Vol.46 (4), p.27
Format: Magazinearticle
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page
container_issue 4
container_start_page 27
container_title Canadian Consulting Engineer
container_volume 46
description It also has a large pilot laboratory that provides a controlled and safe environment for testing procedures without risk to the effluent flowing from the plant into the North Saskatchewan River. The laboratory has a permanent dual train BNR pilot plant which occupies about 30 per cent of the space. The rest of the laboratory is available for mobile pilot plants. Feedstock from the live plant services the laboratory with degritted raw sewage, primary effluent, fermentale, and final effluent. Prime consultant/architect/engineering: Stantec Consulting (Dan Chemishenko, P.Eng, Seven Cho, P.Eng, Marshall Opyr, P.Eng, WemerKiefer, P.Eng, Simon Chan, P.Eng)
format magazinearticle
fullrecord <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_reports_208728101</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>861641221</sourcerecordid><originalsourceid>FETCH-LOGICAL-p96t-a49345a392a4393ffcf857320438b365884af8270645c56f7f473d52b001d1fe3</originalsourceid><addsrcrecordid>eNotzs9Kw0AQgPGlKDRWH0GID7Awu7N_Zo811FooeOm9bJOZg4Qm3Y3g4yvo6bv9-FaqMcmiRsR4pxoAII02xLV6qPUTwDgg36jn_TQO7WsubcfXpXA7Sbv77nkc-drzo7qXPFZ--u9Gnd52p-5dHz_2h2571HMKi84uofMZk80OE4r0Qj6iBYd0weCJXBayEYLzvQ8SxUUcvL38XgxGGDfq5Y-dy3T74rqcC89TWerZAkVLBgz-ANfdNm4</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>magazinearticle</recordtype><pqid>208728101</pqid></control><display><type>magazinearticle</type><title>Gold Bar Centre of Excellence</title><source>Business Source Ultimate【Trial: -2024/12/31】【Remote access available】</source><description>It also has a large pilot laboratory that provides a controlled and safe environment for testing procedures without risk to the effluent flowing from the plant into the North Saskatchewan River. The laboratory has a permanent dual train BNR pilot plant which occupies about 30 per cent of the space. The rest of the laboratory is available for mobile pilot plants. Feedstock from the live plant services the laboratory with degritted raw sewage, primary effluent, fermentale, and final effluent. Prime consultant/architect/engineering: Stantec Consulting (Dan Chemishenko, P.Eng, Seven Cho, P.Eng, Marshall Opyr, P.Eng, WemerKiefer, P.Eng, Simon Chan, P.Eng)</description><identifier>ISSN: 0008-3267</identifier><identifier>EISSN: 1923-3337</identifier><language>eng</language><publisher>Don Mills: Annex Publishing &amp; Printing, Inc</publisher><subject>Centers of excellence ; Sewage treatment plants</subject><ispartof>Canadian Consulting Engineer, 2005-06, Vol.46 (4), p.27</ispartof><rights>Copyright Southam Business Communications, Inc. Jun/Jul 2005</rights><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>312,780,784,791</link.rule.ids></links><search><title>Gold Bar Centre of Excellence</title><title>Canadian Consulting Engineer</title><description>It also has a large pilot laboratory that provides a controlled and safe environment for testing procedures without risk to the effluent flowing from the plant into the North Saskatchewan River. The laboratory has a permanent dual train BNR pilot plant which occupies about 30 per cent of the space. The rest of the laboratory is available for mobile pilot plants. Feedstock from the live plant services the laboratory with degritted raw sewage, primary effluent, fermentale, and final effluent. Prime consultant/architect/engineering: Stantec Consulting (Dan Chemishenko, P.Eng, Seven Cho, P.Eng, Marshall Opyr, P.Eng, WemerKiefer, P.Eng, Simon Chan, P.Eng)</description><subject>Centers of excellence</subject><subject>Sewage treatment plants</subject><issn>0008-3267</issn><issn>1923-3337</issn><fulltext>true</fulltext><rsrctype>magazinearticle</rsrctype><creationdate>2005</creationdate><recordtype>magazinearticle</recordtype><recordid>eNotzs9Kw0AQgPGlKDRWH0GID7Awu7N_Zo811FooeOm9bJOZg4Qm3Y3g4yvo6bv9-FaqMcmiRsR4pxoAII02xLV6qPUTwDgg36jn_TQO7WsubcfXpXA7Sbv77nkc-drzo7qXPFZ--u9Gnd52p-5dHz_2h2571HMKi84uofMZk80OE4r0Qj6iBYd0weCJXBayEYLzvQ8SxUUcvL38XgxGGDfq5Y-dy3T74rqcC89TWerZAkVLBgz-ANfdNm4</recordid><startdate>20050601</startdate><enddate>20050601</enddate><general>Annex Publishing &amp; Printing, Inc</general><scope>3V.</scope><scope>7XB</scope><scope>8FE</scope><scope>8FG</scope><scope>8FK</scope><scope>8FQ</scope><scope>8FV</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>HCIFZ</scope><scope>L6V</scope><scope>M7S</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>Q9U</scope></search><sort><creationdate>20050601</creationdate><title>Gold Bar Centre of Excellence</title></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p96t-a49345a392a4393ffcf857320438b365884af8270645c56f7f473d52b001d1fe3</frbrgroupid><rsrctype>magazinearticle</rsrctype><prefilter>magazinearticle</prefilter><language>eng</language><creationdate>2005</creationdate><topic>Centers of excellence</topic><topic>Sewage treatment plants</topic><toplevel>online_resources</toplevel><collection>ProQuest Central (Corporate)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>ProQuest Central (Alumni) (purchase pre-March 2016)</collection><collection>Canadian Business &amp; Current Affairs Database</collection><collection>Canadian Business &amp; Current Affairs Database (Alumni Edition)</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering Collection</collection><collection>ProQuest Central Basic</collection><jtitle>Canadian Consulting Engineer</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Gold Bar Centre of Excellence</atitle><jtitle>Canadian Consulting Engineer</jtitle><date>2005-06-01</date><risdate>2005</risdate><volume>46</volume><issue>4</issue><spage>27</spage><pages>27-</pages><issn>0008-3267</issn><eissn>1923-3337</eissn><abstract>It also has a large pilot laboratory that provides a controlled and safe environment for testing procedures without risk to the effluent flowing from the plant into the North Saskatchewan River. The laboratory has a permanent dual train BNR pilot plant which occupies about 30 per cent of the space. The rest of the laboratory is available for mobile pilot plants. Feedstock from the live plant services the laboratory with degritted raw sewage, primary effluent, fermentale, and final effluent. Prime consultant/architect/engineering: Stantec Consulting (Dan Chemishenko, P.Eng, Seven Cho, P.Eng, Marshall Opyr, P.Eng, WemerKiefer, P.Eng, Simon Chan, P.Eng)</abstract><cop>Don Mills</cop><pub>Annex Publishing &amp; Printing, Inc</pub></addata></record>
fulltext fulltext
identifier ISSN: 0008-3267
ispartof Canadian Consulting Engineer, 2005-06, Vol.46 (4), p.27
issn 0008-3267
1923-3337
language eng
recordid cdi_proquest_reports_208728101
source Business Source Ultimate【Trial: -2024/12/31】【Remote access available】
subjects Centers of excellence
Sewage treatment plants
title Gold Bar Centre of Excellence
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T07%3A41%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Gold%20Bar%20Centre%20of%20Excellence&rft.jtitle=Canadian%20Consulting%20Engineer&rft.date=2005-06-01&rft.volume=46&rft.issue=4&rft.spage=27&rft.pages=27-&rft.issn=0008-3267&rft.eissn=1923-3337&rft_id=info:doi/&rft_dat=%3Cproquest%3E861641221%3C/proquest%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-p96t-a49345a392a4393ffcf857320438b365884af8270645c56f7f473d52b001d1fe3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=208728101&rft_id=info:pmid/&rfr_iscdi=true