Techniques For The Resolution Of Major Construction Contrac

The settlement of construction contract disputes involves an analysis of what the contractor could have expected at the time of bid, or the as-bid condition. Each disputed bid item has 3 major components: 1. the entitlement to recovery, which primarily is dependent on the provisions of the contract,...

Full description

Saved in:
Bibliographic Details
Published in:Public utilities fortnightly (1994) 1989-04, Vol.123 (9), p.26
Main Author: Hoctor, David R
Format: Magazinearticle
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page
container_issue 9
container_start_page 26
container_title Public utilities fortnightly (1994)
container_volume 123
creator Hoctor, David R
description The settlement of construction contract disputes involves an analysis of what the contractor could have expected at the time of bid, or the as-bid condition. Each disputed bid item has 3 major components: 1. the entitlement to recovery, which primarily is dependent on the provisions of the contract, 2. cost quantification of the changed items of work, which can be done in several different ways but can be difficult to calculate, and 3. delay analysis, which is the time quantification of the effects from each claimed item. After analyzing the basis for the amount of time claimed and plotting each of these items on an as-built schedule, it is visually possible to see which major elements were affected and which were not. By removing the amount of time the contractor has claimed for delay from each activity, the responsibility for delay can be ascertained. An approach now being utilized in the utlilty industry is to have both parties agree to a dispute resolution agreement to avoid litigation.
format magazinearticle
fullrecord <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_reports_213241344</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>754011</sourcerecordid><originalsourceid>FETCH-proquest_reports_2132413443</originalsourceid><addsrcrecordid>eNpjYuA0tDQx1TUyNbdgAbINzC10TS0sjTgYuIqLswwMDAxNLUw5GaxDUpMz8jILS1OLFdzyixRCMlIVglKL83NKSzLz8xT80xR8E7OA4s75ecUlRaXJYFEgp6QoMZmHgTUtMac4lRdKczMourmGOHvoFhTlgwwsiS9KLcgvKimONzI0NjIxNDYxMSZGDQD4MDca</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>magazinearticle</recordtype><pqid>213241344</pqid></control><display><type>magazinearticle</type><title>Techniques For The Resolution Of Major Construction Contrac</title><source>ABI/INFORM Global (ProQuest)</source><creator>Hoctor, David R</creator><creatorcontrib>Hoctor, David R</creatorcontrib><description>The settlement of construction contract disputes involves an analysis of what the contractor could have expected at the time of bid, or the as-bid condition. Each disputed bid item has 3 major components: 1. the entitlement to recovery, which primarily is dependent on the provisions of the contract, 2. cost quantification of the changed items of work, which can be done in several different ways but can be difficult to calculate, and 3. delay analysis, which is the time quantification of the effects from each claimed item. After analyzing the basis for the amount of time claimed and plotting each of these items on an as-built schedule, it is visually possible to see which major elements were affected and which were not. By removing the amount of time the contractor has claimed for delay from each activity, the responsibility for delay can be ascertained. An approach now being utilized in the utlilty industry is to have both parties agree to a dispute resolution agreement to avoid litigation.</description><identifier>ISSN: 1078-5892</identifier><identifier>EISSN: 1945-2578</identifier><identifier>CODEN: PUFNAV</identifier><language>eng</language><publisher>Washington: Public Utilities Reports, Incorporated</publisher><subject>Construction contracts ; Disputes ; Electric utilities ; Industrial plants ; Litigation ; Schedules</subject><ispartof>Public utilities fortnightly (1994), 1989-04, Vol.123 (9), p.26</ispartof><rights>Copyright Public Utilities Reports, Incorporated Apr 27, 1989</rights><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.proquest.com/docview/213241344?pq-origsite=primo$$EHTML$$P50$$Gproquest$$H</linktohtml><link.rule.ids>780,784,15316,36062,44363</link.rule.ids></links><search><creatorcontrib>Hoctor, David R</creatorcontrib><title>Techniques For The Resolution Of Major Construction Contrac</title><title>Public utilities fortnightly (1994)</title><description>The settlement of construction contract disputes involves an analysis of what the contractor could have expected at the time of bid, or the as-bid condition. Each disputed bid item has 3 major components: 1. the entitlement to recovery, which primarily is dependent on the provisions of the contract, 2. cost quantification of the changed items of work, which can be done in several different ways but can be difficult to calculate, and 3. delay analysis, which is the time quantification of the effects from each claimed item. After analyzing the basis for the amount of time claimed and plotting each of these items on an as-built schedule, it is visually possible to see which major elements were affected and which were not. By removing the amount of time the contractor has claimed for delay from each activity, the responsibility for delay can be ascertained. An approach now being utilized in the utlilty industry is to have both parties agree to a dispute resolution agreement to avoid litigation.</description><subject>Construction contracts</subject><subject>Disputes</subject><subject>Electric utilities</subject><subject>Industrial plants</subject><subject>Litigation</subject><subject>Schedules</subject><issn>1078-5892</issn><issn>1945-2578</issn><fulltext>true</fulltext><rsrctype>magazinearticle</rsrctype><creationdate>1989</creationdate><recordtype>magazinearticle</recordtype><sourceid>M0C</sourceid><recordid>eNpjYuA0tDQx1TUyNbdgAbINzC10TS0sjTgYuIqLswwMDAxNLUw5GaxDUpMz8jILS1OLFdzyixRCMlIVglKL83NKSzLz8xT80xR8E7OA4s75ecUlRaXJYFEgp6QoMZmHgTUtMac4lRdKczMourmGOHvoFhTlgwwsiS9KLcgvKimONzI0NjIxNDYxMSZGDQD4MDca</recordid><startdate>19890427</startdate><enddate>19890427</enddate><creator>Hoctor, David R</creator><general>Public Utilities Reports, Incorporated</general><scope>3V.</scope><scope>7RQ</scope><scope>7WY</scope><scope>7WZ</scope><scope>7XB</scope><scope>87Z</scope><scope>883</scope><scope>88K</scope><scope>8AO</scope><scope>8FK</scope><scope>8FL</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FRNLG</scope><scope>F~G</scope><scope>K60</scope><scope>K6~</scope><scope>L.-</scope><scope>M0C</scope><scope>M0F</scope><scope>M2T</scope><scope>PQBIZ</scope><scope>PQBZA</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PYYUZ</scope><scope>Q9U</scope><scope>S0X</scope><scope>U9A</scope></search><sort><creationdate>19890427</creationdate><title>Techniques For The Resolution Of Major Construction Contrac</title><author>Hoctor, David R</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-proquest_reports_2132413443</frbrgroupid><rsrctype>magazinearticle</rsrctype><prefilter>magazinearticle</prefilter><language>eng</language><creationdate>1989</creationdate><topic>Construction contracts</topic><topic>Disputes</topic><topic>Electric utilities</topic><topic>Industrial plants</topic><topic>Litigation</topic><topic>Schedules</topic><toplevel>online_resources</toplevel><creatorcontrib>Hoctor, David R</creatorcontrib><collection>ProQuest Central (Corporate)</collection><collection>ProQuest Career &amp; Technical Education Database</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Global (PDF only)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Trade &amp; Industry (Alumni Edition)</collection><collection>Telecommunications (Alumni Edition)</collection><collection>ProQuest Pharma Collection</collection><collection>ProQuest Central (Alumni) (purchase pre-March 2016)</collection><collection>ABI/INFORM Collection (Alumni Edition)</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central</collection><collection>ProQuest Central Essentials</collection><collection>AUTh Library subscriptions: ProQuest Central</collection><collection>ProQuest Business Premium Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Business Premium Collection (Alumni)</collection><collection>ABI/INFORM Global (Corporate)</collection><collection>ProQuest Business Collection (Alumni Edition)</collection><collection>ProQuest Business Collection</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ABI/INFORM Global (ProQuest)</collection><collection>ABI/INFORM Trade &amp; Industry</collection><collection>Telecommunications Database</collection><collection>One Business (ProQuest)</collection><collection>ProQuest One Business (Alumni)</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ABI/INFORM Collection China</collection><collection>ProQuest Central Basic</collection><collection>SIRS Editorial</collection><jtitle>Public utilities fortnightly (1994)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Hoctor, David R</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Techniques For The Resolution Of Major Construction Contrac</atitle><jtitle>Public utilities fortnightly (1994)</jtitle><date>1989-04-27</date><risdate>1989</risdate><volume>123</volume><issue>9</issue><spage>26</spage><pages>26-</pages><issn>1078-5892</issn><eissn>1945-2578</eissn><coden>PUFNAV</coden><abstract>The settlement of construction contract disputes involves an analysis of what the contractor could have expected at the time of bid, or the as-bid condition. Each disputed bid item has 3 major components: 1. the entitlement to recovery, which primarily is dependent on the provisions of the contract, 2. cost quantification of the changed items of work, which can be done in several different ways but can be difficult to calculate, and 3. delay analysis, which is the time quantification of the effects from each claimed item. After analyzing the basis for the amount of time claimed and plotting each of these items on an as-built schedule, it is visually possible to see which major elements were affected and which were not. By removing the amount of time the contractor has claimed for delay from each activity, the responsibility for delay can be ascertained. An approach now being utilized in the utlilty industry is to have both parties agree to a dispute resolution agreement to avoid litigation.</abstract><cop>Washington</cop><pub>Public Utilities Reports, Incorporated</pub></addata></record>
fulltext fulltext
identifier ISSN: 1078-5892
ispartof Public utilities fortnightly (1994), 1989-04, Vol.123 (9), p.26
issn 1078-5892
1945-2578
language eng
recordid cdi_proquest_reports_213241344
source ABI/INFORM Global (ProQuest)
subjects Construction contracts
Disputes
Electric utilities
Industrial plants
Litigation
Schedules
title Techniques For The Resolution Of Major Construction Contrac
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T08%3A44%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Techniques%20For%20The%20Resolution%20Of%20Major%20Construction%20Contrac&rft.jtitle=Public%20utilities%20fortnightly%20(1994)&rft.au=Hoctor,%20David%20R&rft.date=1989-04-27&rft.volume=123&rft.issue=9&rft.spage=26&rft.pages=26-&rft.issn=1078-5892&rft.eissn=1945-2578&rft.coden=PUFNAV&rft_id=info:doi/&rft_dat=%3Cproquest%3E754011%3C/proquest%3E%3Cgrp_id%3Ecdi_FETCH-proquest_reports_2132413443%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=213241344&rft_id=info:pmid/&rfr_iscdi=true