Loading…
Drama Queen
Beyond the diagram of three floating theaters surrounding a core, another, less obvious one is at work: that of a "public loop" that winds its way from the ground floor to a top-level viewing platform and down again, passing by various front- and back-of-house spaces along the way. [...]TP...
Saved in:
Published in: | Architectural Record 2022-12, Vol.210 (12), p.60-67 |
---|---|
Main Author: | |
Format: | Article |
Language: | English |
Subjects: | |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Beyond the diagram of three floating theaters surrounding a core, another, less obvious one is at work: that of a "public loop" that winds its way from the ground floor to a top-level viewing platform and down again, passing by various front- and back-of-house spaces along the way. [...]TPAC has become a subject of widespread interest in a way that now seems rare for architecture. Arup (structure, m/e/p, building physics, fire); Evergreen Consulting Engineering (structure); Heng Kai, IS Leng and Associates Engineers (building services); Taiwan Fire Safety Consulting (fire) CONSULTANTS: dUCKS Scéno, Creative Solution Integration (theater); Royal HaskoningDHV, Theo Raijmakers, SM&W (acoustics); Chroma 33 (lighting); ABT, CDC (facades); Segreene Design and Consulting (sustainability); CNHW (landscape); CONTRACTORS: July 2022 A See-Through Machine AT THE TAIPEI Performing Arts Center, several familiar elements of past OMA projects make appearances, none more noticeable, perhaps, than the corrugated glass that clads three sides of the central cube, recalling the Casa da Música in Porto (2005) and Qatar National Library (record, April 2018). |
---|---|
ISSN: | 0003-858X 2470-1513 |