Loading…

Philadelphia Prefab Project Pushes the Envelope

Working with designer BKV Group, the team devised a solution that allowed it to use a cold-formed, panelized building system with cross-braced bearing walls rather than a conventional concrete structure to meet its needs. By using that system, the team claims that it was able to save potential costs...

Full description

Saved in:
Bibliographic Details
Published in:ENR 2024-06, Vol.292 (9), p.MA32-MA35
Main Author: Buckley, Bruce
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Working with designer BKV Group, the team devised a solution that allowed it to use a cold-formed, panelized building system with cross-braced bearing walls rather than a conventional concrete structure to meet its needs. By using that system, the team claims that it was able to save potential costs by lightening the structure while reducing labor demands on site through the use of panels that are fabricated off site. "When you pick a structure, you pick one that is complementary to the workforce at hand," says Sarina Rose, senior vice president of development at Post Brothers. [...]the team used light-gauge steel, Type 1 material and componentized steel wall construction methodology to deliver the project.
ISSN:0891-9526