Loading…

Mechanical Systems

Alan Scott. P.Eng. was chairman of the Art Gallery of Alhena from 2001 to 2010. and led the gallery's redevelopment: "Our objective was to develop a facility to support art exhibitions which have been assembled l'ioni major art centres throughout the world. In this regard, art lending...

Full description

Saved in:
Bibliographic Details
Published in:Canadian Consulting Engineer 2010-08, Vol.51 (5), p.22
Main Author: Campbell, Bob
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Alan Scott. P.Eng. was chairman of the Art Gallery of Alhena from 2001 to 2010. and led the gallery's redevelopment: "Our objective was to develop a facility to support art exhibitions which have been assembled l'ioni major art centres throughout the world. In this regard, art lending institutions require the strictest control ol air quality, temperature, and humidity, with lighting that reflects the true presentation." In addition to temperature and humidity control, it is necessary to filter all the; air supplied to the galleries, it is carbon filters to remove airborne gases and media filters to remove small airborne particulate to Merv Hi ( equivalent to HEl1A liltration for clean rooms). The galleries are maintained at a positive pressure with respect to adjacent spaces to ensure surrounding air cannot enter the gallen beforebeing filtered and tempered. Owner: Art Gallery of Alberta. Architect: Randall Stout. Structural engineers: DeSimone; BP-TEC DNW Engineering (associate). Mechanical-electrical engineers: IHF. Stanlec, Lighting. Lam Partners.. Other key players: Head Jones Christoffersen (curtainwall), RWDI snow, wind, ice, GHL (code), Newcomb & Boyd (acoustics), Ledc-or (construction manager). Architecture Anadt Tkalcic Bengert (project manager). Supplier: Viessmann (condensing boilers).
ISSN:0008-3267
1923-3337