Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis

Modular integrated construction (MiC) is a revolutionary construction method. However, the logistics management of MiC has always been a major barrier to the wider adoption of MiC. Nonetheless, this challenge can be tackled by the application of lean techniques, namely, just-in-time (JIT). Numerous...

Full description

Saved in:
Bibliographic Details
Published in:Journal of cleaner production 2021-02, Vol.284, p.124716-124716, Article 124716
Main Authors: Hussein, Mohamed, Zayed, Tarek
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Items that cite this one
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Modular integrated construction (MiC) is a revolutionary construction method. However, the logistics management of MiC has always been a major barrier to the wider adoption of MiC. Nonetheless, this challenge can be tackled by the application of lean techniques, namely, just-in-time (JIT). Numerous studies have identified and evaluated the critical factors (CFs) required to implement JIT; however, there is no consensus among the previous studies on these CFs and their level of importance. Therefore, this research, for the first time, provides a systematic review and meta-analysis of these CFs. The systematic review identifies 42 CFs. To further provide a synthesis analysis of previous studies, a meta-analysis approach is used. This analysis is conducted on the identified CFs to evaluate their importance level and hence rank them. The results indicate that all the 42 CFs are important for applying JIT, of which seven are highly significant for successfully implementing JIT in MiC. Although the ranking obtained by meta-analysis is much more reliable than that provided in the individual studies, however, there is still a high heterogeneity in the results, which depicts the uncertain nature of the construction field. Therefore, sub-group analysis is conducted to investigate this heterogeneity and uncover the hidden patterns in the literature. This is achieved by studying the influence of predictive factors (moderators) on the importance level of CFs. This analysis shows that the economy of a country and the type of project executed are influential factors. The results further indicate that developing economies, in contrast to advanced economies, should pay more attention to three CFs. Also, the results show that seven CFs are much more important in MiC projects than the other project types. This research work is highly beneficial for theory development and for practitioners by identification of significant CFs that warrant management dedication to best apply JIT. Researchers, in particular, can consider the recommendations given here for implementing future meta-analysis studies. [Display omitted] •Critical factors to apply just-in-time in modular construction were reviewed.•Forty-two critical factors were identified through a systematic review.•The significance level of each critical factor was quantified through meta-analysis.•The study provided a more reliable evaluation and prioritization of these factors.•A sub-group analysis was conducted to study the ef
ISSN:0959-6526
1879-1786
DOI:10.1016/j.jclepro.2020.124716