Loading…

A hybrid method for a Project Scheduling Problem

This work deals with a project scheduling problem where the tasks consume resources to be activated, but start to produce them after that. This problem is known as Dynamic Resource-Constrained Project Scheduling Problem (DRCPSP). Three methods were proposed to divide the problem into smaller parts a...

Full description

Saved in:
Bibliographic Details
Published in:Pesquisa Operacional 2014-04, Vol.34 (1), p.125-142
Main Author: Silva, André Renato Villela da
Format: Article
Language:English
Subjects:
Citations: Items that this one cites
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This work deals with a project scheduling problem where the tasks consume resources to be activated, but start to produce them after that. This problem is known as Dynamic Resource-Constrained Project Scheduling Problem (DRCPSP). Three methods were proposed to divide the problem into smaller parts and solve them separately. Each partial solution is obtained by CPLEX optimizer and is used to generate more complete partial solutions. The obtained results show that this hybrid method works very well.
ISSN:0101-7438
1678-5142
1678-5142
DOI:10.1590/S0101-74382014005000005