Loading…
Analysis and proposal of reduction of lead time in the process of cutting, loading and transportation in a sugar cane factory: a study case
Abstract This article parts from the importance of sugarcane based energy to the Brazilian economy and, consequently, the important role of the process that involves cutting/loading/transportation (CLT) of cane in the supplies and production cost of sugar, alcohol and its derivates. For this purpose...
Saved in:
Published in: | Gestão & Produção 2019, Vol.26 (3) |
---|---|
Main Authors: | , , , , , |
Format: | Article |
Language: | eng ; por |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Abstract This article parts from the importance of sugarcane based energy to the Brazilian economy and, consequently, the important role of the process that involves cutting/loading/transportation (CLT) of cane in the supplies and production cost of sugar, alcohol and its derivates. For this purpose, a study case was carried in a sugarcane factory from São Paulo state, aiming to build a proposal that could reduce the lead time in the CLT process through the analysis of the Manufacturing Critical-Path Time (MCT) of the studied industry. With the data collected in the field visits, the MCT of one tone of sugarcane during its logistic process was done. This tool revealed a long waiting time of the cane waiting to be milled in the patio of the factory. Through the theory of dynamic of the systems it was concluded that this time was high due to the variability of the field as a consequence of an inefficient use of the harvester and the logistic system of dynamic allocation of the transportation resources ahead in the harvest. To make the harvester more efficient, a reduction of 40% of the laying time “awaiting transshipment” was proposed, which would result in a save of R$ 1.172.784,00/year. For this reduction five proposals were identified to be implemented in parallel: integration of the systems of the board computer and the traffic control system; integration of the board computers of the harvester and the transports; implementation of truck filling volume sensors; focus in the management of basis leaders; and, implementation of a multitask worker.
Resumo A partir da importância do setor sucroenergético para a economia brasileira, e da importância do processo de corte/carregamento/transporte (CCT) de cana no suprimento e no custo da produção do açúcar, álcool e derivados, este artigo tem como estudo de caso uma usina de cana-de-açúcar paulista. O objetivo deste trabalho foi construir propostas de redução do lead time do processo CCT de cana-de-açúcar, através da análise do Manufacturing Critical-Path Time (MCT) da usina estudada. Com os dados coletados nas visitas à campo, foi feito o MCT de uma tonelada de cana ao longo de seu processo logístico. Essa ferramenta apontou para o grande tempo de espera da cana aguardando para ser moída no pátio da usina. Por intermédio da teoria da dinâmica dos sistemas, concluiu-se que esse tempo era alto decorrente da variabilidade no campo, consequência da ineficiência do uso da colhedora e do sistema logístico de alocação |
---|---|
ISSN: | 0104-530X 1806-9649 1806-9649 |
DOI: | 10.1590/0104-530x3446-19 |