Analysis of effect factors-based stochastic network planning model

Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the...

Full description

Saved in:
Bibliographic Details
Published in:Journal of systems engineering and electronics 2008-02, Vol.19 (1), p.112-118
Main Author: Chunchao, Chu
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
cited_by
cites
container_end_page 118
container_issue 1
container_start_page 112
container_title Journal of systems engineering and electronics
container_volume 19
creator Chunchao, Chu
description Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.
doi_str_mv 10.1016/S1004-4132(08)60054-7
format article
fullrecord <record><control><sourceid>wanfang_jour_proqu</sourceid><recordid>TN_cdi_wanfang_journals_xtgcydzjs_e200801018</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><wanfj_id>xtgcydzjs_e200801018</wanfj_id><els_id>S1004413208600547</els_id><sourcerecordid>xtgcydzjs_e200801018</sourcerecordid><originalsourceid>FETCH-LOGICAL-c325t-38509615d7996454ffa671170ffbdfd90bece2f348d404ccb9f957c8e0dd296f3</originalsourceid><addsrcrecordid>eNqFkE1LAzEQhhdRsNT-BGFPouDqZL9zklr8goIH9RzSZFJTt5ua2VrrrzdtRbw5lxmG9x3eeaLomMEFA1ZePjGAPMlZlp5CfVYCFHlS7UW93_X-n_kwGhDNYFMVpCn0outhK5s1WYqdidEYVF1spOqcp2QiCXVMnVOvkjqr4ha7lfNv8aKRbWvbaTx3Gpuj6MDIhnDw0_vRy-3N8-g-GT_ePYyG40RladElWV0AL1mhK87LvMiNkWXFWAXGTLTRHCaoMDVZXusccqUm3PCiUjWC1ikvTdaPznd3V7I1sp2KmVv6kJ7EZzdVa_01I4EpQA0BTB3kJzv5wrv3JVIn5pYUNiE7uiWJEIoB51kQFjuh8o7IoxELb-fSrwUDsWEstozFBqCAWmwZiyr4rnY-DE9_WPSClMVWobY-YBTa2X8ufANiY4MT</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>32510993</pqid></control><display><type>article</type><title>Analysis of effect factors-based stochastic network planning model</title><source>IEEE Xplore</source><creator>Chunchao, Chu</creator><creatorcontrib>Chunchao, Chu</creatorcontrib><description>Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.</description><identifier>ISSN: 1004-4132</identifier><identifier>EISSN: 1004-4132</identifier><identifier>DOI: 10.1016/S1004-4132(08)60054-7</identifier><language>eng</language><publisher>Elsevier Ltd</publisher><subject>activity ; duration ; effect factor ; stochastic network planning</subject><ispartof>Journal of systems engineering and electronics, 2008-02, Vol.19 (1), p.112-118</ispartof><rights>2008 The Second Academy of China Aerospace Science &amp; Industry Cooperation</rights><rights>Copyright © Wanfang Data Co. Ltd. All Rights Reserved.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Uhttp://www.wanfangdata.com.cn/images/PeriodicalImages/xtgcydzjs-e/xtgcydzjs-e.jpg</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids></links><search><creatorcontrib>Chunchao, Chu</creatorcontrib><title>Analysis of effect factors-based stochastic network planning model</title><title>Journal of systems engineering and electronics</title><description>Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.</description><subject>activity</subject><subject>duration</subject><subject>effect factor</subject><subject>stochastic network planning</subject><issn>1004-4132</issn><issn>1004-4132</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2008</creationdate><recordtype>article</recordtype><recordid>eNqFkE1LAzEQhhdRsNT-BGFPouDqZL9zklr8goIH9RzSZFJTt5ua2VrrrzdtRbw5lxmG9x3eeaLomMEFA1ZePjGAPMlZlp5CfVYCFHlS7UW93_X-n_kwGhDNYFMVpCn0outhK5s1WYqdidEYVF1spOqcp2QiCXVMnVOvkjqr4ha7lfNv8aKRbWvbaTx3Gpuj6MDIhnDw0_vRy-3N8-g-GT_ePYyG40RladElWV0AL1mhK87LvMiNkWXFWAXGTLTRHCaoMDVZXusccqUm3PCiUjWC1ikvTdaPznd3V7I1sp2KmVv6kJ7EZzdVa_01I4EpQA0BTB3kJzv5wrv3JVIn5pYUNiE7uiWJEIoB51kQFjuh8o7IoxELb-fSrwUDsWEstozFBqCAWmwZiyr4rnY-DE9_WPSClMVWobY-YBTa2X8ufANiY4MT</recordid><startdate>20080201</startdate><enddate>20080201</enddate><creator>Chunchao, Chu</creator><general>Elsevier Ltd</general><general>China Academy of Transportation Science,Beijing 100029,P.R.China</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>8FD</scope><scope>L7M</scope><scope>2B.</scope><scope>4A8</scope><scope>92I</scope><scope>93N</scope><scope>PSX</scope><scope>TCJ</scope></search><sort><creationdate>20080201</creationdate><title>Analysis of effect factors-based stochastic network planning model</title><author>Chunchao, Chu</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c325t-38509615d7996454ffa671170ffbdfd90bece2f348d404ccb9f957c8e0dd296f3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2008</creationdate><topic>activity</topic><topic>duration</topic><topic>effect factor</topic><topic>stochastic network planning</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Chunchao, Chu</creatorcontrib><collection>CrossRef</collection><collection>Electronics &amp; Communications Abstracts</collection><collection>Technology Research Database</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Wanfang Data Journals - Hong Kong</collection><collection>WANFANG Data Centre</collection><collection>Wanfang Data Journals</collection><collection>万方数据期刊 - 香港版</collection><collection>China Online Journals (COJ)</collection><collection>China Online Journals (COJ)</collection><jtitle>Journal of systems engineering and electronics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Chunchao, Chu</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Analysis of effect factors-based stochastic network planning model</atitle><jtitle>Journal of systems engineering and electronics</jtitle><date>2008-02-01</date><risdate>2008</risdate><volume>19</volume><issue>1</issue><spage>112</spage><epage>118</epage><pages>112-118</pages><issn>1004-4132</issn><eissn>1004-4132</eissn><abstract>Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.</abstract><pub>Elsevier Ltd</pub><doi>10.1016/S1004-4132(08)60054-7</doi><tpages>7</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1004-4132
ispartof Journal of systems engineering and electronics, 2008-02, Vol.19 (1), p.112-118
issn 1004-4132
1004-4132
language eng
recordid cdi_wanfang_journals_xtgcydzjs_e200801018
source IEEE Xplore
subjects activity
duration
effect factor
stochastic network planning
title Analysis of effect factors-based stochastic network planning model
url http://sfxeu10.hosted.exlibrisgroup.com/loughborough?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T15%3A30%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-wanfang_jour_proqu&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Analysis%20of%20effect%20factors-based%20stochastic%20network%20planning%20model&rft.jtitle=Journal%20of%20systems%20engineering%20and%20electronics&rft.au=Chunchao,%20Chu&rft.date=2008-02-01&rft.volume=19&rft.issue=1&rft.spage=112&rft.epage=118&rft.pages=112-118&rft.issn=1004-4132&rft.eissn=1004-4132&rft_id=info:doi/10.1016/S1004-4132(08)60054-7&rft_dat=%3Cwanfang_jour_proqu%3Extgcydzjs_e200801018%3C/wanfang_jour_proqu%3E%3Cgrp_id%3Ecdi_FETCH-LOGICAL-c325t-38509615d7996454ffa671170ffbdfd90bece2f348d404ccb9f957c8e0dd296f3%3C/grp_id%3E%3Coa%3E%3C/oa%3E%3Curl%3E%3C/url%3E&rft_id=info:oai/&rft_pqid=32510993&rft_id=info:pmid/&rft_wanfj_id=xtgcydzjs_e200801018&rfr_iscdi=true