Loading…
A case study for advanced planning and scheduling (APS)
This paper presents a case study for the advanced planning and scheduling (APS) problem encountered in a light source manufacturer. The APS problem explicitly considers due dates of products, operation sequences among items, and capacity constraints of the manufacturing system. The objective of the...
Saved in:
Published in: | Journal of systems science and systems engineering 2011-12, Vol.20 (4), p.460-474 |
---|---|
Main Authors: | , , |
Format: | Article |
Language: | English |
Subjects: | |
Citations: | Items that this one cites Items that cite this one |
Online Access: | Get full text |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This paper presents a case study for the advanced planning and scheduling (APS) problem encountered in a light source manufacturer. The APS problem explicitly considers due dates of products, operation sequences among items, and capacity constraints of the manufacturing system. The objective of the problem is to seek the minimum cost of both production idle time and tardiness or earliness penalty of an order. An intelligent heuristic is applied to the problem, and the results demonstrate that significant production performances can be achieved while ensuring customer satisfaction as opposed to normal practices followed in the company relying on human expertise. |
---|---|
ISSN: | 1004-3756 1861-9576 |
DOI: | 10.1007/s11518-011-5180-z |