Loading…

Design and implementation of the detector control system for the BESⅢ drift chamber cosmic ray test

After the construction of the BESⅢ drift chamber, a long period of cosmic rays test is necessary to verify its performance. This also provides a good opportunity to integrate the detector readout electronics and Detector Control System (DCS) into a unified working system. The goal of the DCS is to g...

Full description

Saved in:
Bibliographic Details
Published in:Chinese physics C 2008-08, Vol.32 (8), p.649-652
Main Author: 陈锡辉 谢小希 李小男 高翠山 张银鸿 聂振东 闵建 谢一冈
Format: Article
Language:English
Subjects:
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:After the construction of the BESⅢ drift chamber, a long period of cosmic rays test is necessary to verify its performance. This also provides a good opportunity to integrate the detector readout electronics and Detector Control System (DCS) into a unified working system. The goal of the DCS is to guarantee reliable physics data quality and the safe operation of the detector. It monitors and controls the HV, gas, VME crates and the environmental variables. The upper-level system is mainly developed from LabVIEW and the lower-level system mainly uses MCU and PLC technology. The system is designed to be highly flexible and scalable so that it can be applied to other detectors with little or no change. In the immediate future, it will be integrated into the entire BESⅢ Slow Control System.
ISSN:1674-1137
0254-3052
2058-6132
DOI:10.1088/1674-1137/32/8/012