Loading…
Deformation of the Zhangjiazhuang high-speed railway tunnel: an analysis of causal mechanisms using geomorphological surveys and D-InSAR monitoring
On 18 January 2016, the Zhangjiazhuang high-speed railway tunnel in Ledu, Qinghai Province, China, underwent serious deformation and structural damage. A crack formed at the top of the tunnel and the concrete on the crown peeled off. As a result, the tunnel could not be operated for three months. In...
Saved in:
Main Authors: | , , , , , , , , , , , , , |
---|---|
Format: | Default Article |
Published: |
2021
|
Subjects: | |
Online Access: | https://hdl.handle.net/2134/16652440.v1 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|